Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20092C4331 September 1995Startup Test Rept for Pilgrim Nuclear Power Station Cycle 11Shutdown Margin
ML20078N84218 November 1994Rev 32 to Procedure 8.7.3, Secondary Containment Leak Rate Test
ML20056E22219 May 1993Final Pilgrim Nuclear Power Station Unit 1 Reactor Containment Bldg Integrated Leakage Rate Test Rept
ML20045H53829 January 1993Procedure 8.7.3,Secondary Containment Leak Rate Test.
BECO-91-148, Reactor Containment Bldg Integrated Leakage Rate Test Rept5 August 1991Reactor Containment Bldg Integrated Leakage Rate Test ReptReactor Vessel Water Level
Anchor Darling
ML20076D48922 July 1991Procedure 8.7.3, Secondary Containment Leak Rate Test, Containment Results of Leak Rate Tests Performed on 910505 & 0620
ML20204H35026 September 1988Restart Readiness Assessment Rept for Pilgrim Nuclear Power StationSafe Shutdown
High Radiation Area
Half scram
Offsite Dose Calculation Manual
Fire Barrier
Hydrostatic
Temporary Modification
Squib
Locked High Radiation Area
Condition Adverse to Quality
Missed surveillance
Process Control Program
Systematic Assessment of Licensee Performance
Safeguards Contingency Plan
Exemption Request
Pressure boundary leak
Fire Protection Program
Fire Watch
Grace period
BECO-88-049, Reactor Containment Bldg Integrated Leakage Rate Test Types A,B & C Periodic Test31 December 1987Reactor Containment Bldg Integrated Leakage Rate Test Types A,B & C Periodic Test
ML20209D47223 April 1987Secondary Containment Leak Rate Test Rept
ML20236M1114 March 1987Flooring Radiant Panel Test
ML20236M1024 March 1987Flooring Radiant Panel Test
ML20236M1004 March 1987Flooring Radiant Panel Test
ML20236M0914 March 1987Smoke Density Test (Nbs)
ML20236M1214 March 1987Flooring Radiant Panel Test
ML20236M1284 March 1987Flooring Radiant Panel Test
ML20236M0814 March 1987Smoke Density Test (Nbs)
ML20112F8388 January 1985Rev 15 to Secondary Containment Leak Rate Signoff
ML20100F60331 December 1984Reactor Containment Bldg Integrated Leakage Rate Test,Type A,B & C Periodic Test,Pilgrim Nuclear Power Station,Unit 1
ML20107A18630 September 1984Rev 1 to Statistical Analysis of Boundary Strengths for Masonry Walls from Field Test Data
ML20064B89227 October 1982Mark I Containment Program:Plant-Unique Analysis Rept of Torus Suppression Chamber for Pilgrim Station - Unit 1Earthquake
ML19331D13418 August 1980Results of Startup Physics Testing Program Conducted for Cycle V Operation.Shutdown Margin
Overtravel
ML19344B32731 May 1980Primary Containment Integrated Leak Rate Test,Second Periodic Test & Local Leak Rate Tests Results,Jan-May,1980.
ML19312E00130 April 1980Test of Cable Penetration Fire Stops for Pilgrim 1 Nuclear Power Generating Station, Final Rept for 790907 Testing
ML19320C98923 April 1980Secondary Containment Leak Rate Test Data.Includes Test Conditions,Base Reading & Standby Gas Treatment Sys a & B Performance
ML19312D99731 March 1980Test of Cable Penetration Fire Stops for Pilgrim 1 Nuclear Generating Station, Final Rept for 790829 TestingCoatings
ML19305D25920 March 1980Secondary Containment Leak Rate Test Data.
ML20126B3693 March 1980Secondary Containment Leak Rate Test Data
ML19312D99531 January 1980Test of Cable Penetration Fire Stops for Pilgrim 1 Nuclear Power Generating Station, for 790531 TestingCoatings
ML20236Q8825 November 1976Friction Coefficients of Water-Lubricated Stainless Steels for Spent Fuel Rack Facility