Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20202E625 | 31 December 1998 | PBAPS Unit 2 Cycle 13 Startup Rept. with | Shutdown Margin High Radiation Area Stroke time Coast down |
ML20202H414 | 31 January 1998 | Cycle 12 Startup Rept Unit 3 | Shutdown Margin High Radiation Area Stroke time Minimum Critical Power Ratio |
ML20134A675 | 24 January 1997 | Cycle 12 Startup Rept Unit 2 | Shutdown Margin Stroke time Minimum Critical Power Ratio |
ML20096B431 | 31 December 1995 | Cycle 11 Startup Rept | Shutdown Margin Grab sample Stroke time |
ML20078S950 | 16 December 1994 | PBAPS Cycle 11 Startup Rept for Unit 2 | Shutdown Margin Grab sample Stroke time MELLLA |
ML20063J919 | 10 February 1994 | Cycle 10 Startup Rept | Shutdown Margin High Radiation Area Stroke time MELLLA |
ML20101S940 | 31 December 1991 | PBAPS Unit 2 Vessel Surveillance Matls Testing & Fracture Toughness Analysis | |
ML20090L813 | 24 December 1991 | Reactor Containment Bldg Integrated Leak Rate Test Rept | |
ML20082B939 | 17 July 1991 | Rept of Plant Start-Up Following Eighth Refueling Outage on 910112-0412.W/undated Ltr | Shutdown Margin |
ML20079C951 | 29 March 1991 | Reactor Containment Bldg Integrated Leak Rate Test Rept | Reactor Vessel Water Level Packing leak Temporary Modification |
ML19332C820 | 17 November 1989 | Rept of Plant Startup Following Seventh Refueling Outage, 870315-891010. W/891117 Ltr | Shutdown Margin |
ML20244C257 | 31 January 1989 | Reactor Containment Bldg Integrated Leak Rate Test | Reactor Vessel Water Level Scram Discharge Volume |
ML20155G193 | 31 October 1988 | Rept on Restart Review Panel Assessment of Readiness for Restart | Safe Shutdown Fitness for Duty High Radiation Area Hydrostatic Probabilistic Risk Assessment Anchor Darling Temporary Modification Fire Watch Scaffolding Grace period |
ML20155J845 | 27 May 1988 | App R Multiple High Impedance Cable Fault Flame Test Rept | |
ML20154C710 | 6 May 1988 | Vessel Surveillance Matls Testing & Fracture Toughness Analysis | |
ML20138Q977 | 28 October 1985 | Rept of Plant Startup Following Sixth Refueling Outage, 840428-850713 | Shutdown Margin Hydrostatic Overtravel |
ML20135D543 | 11 June 1985 | Reactor Containment Bldg Integrated Leakage Rate Test Rept | Reactor Vessel Water Level Packing leak |
ML20126J840 | 30 May 1985 | Rev 0 to Structural Steel Analysis for Peach Bottom Generating Station:Calculation 51,Unit 2,3,Turbine Bldg El 135 Ft Corridor to Switchgear Rooms,Fire Area 78A | |
ML20126J990 | 24 May 1985 | Rev 0 to Structural Steel Analysis for Peach Bottom Generating Station:Calculation 97,Unit 2,3,Turbine Bldg El 116 Ft Janitor Room,Fire Area 116 | |
ML20126J976 | 24 May 1985 | Rev 0 to Structural Steel Analysis for Peach Bottom Generating Station:Calculation 96,Unit 2,3,Turbine Bldg El 116 Ft Toilet Area,Fire Area 115 | |
ML20126J952 | 24 May 1985 | Rev 0 to Structural Steel Analysis for Peach Bottom Generating Station:Calculation 95,Unit 2,3,Turbine Bldg El 116 Ft Clean Clothes Room,Fire Area 114 | |
ML20126J926 | 24 May 1985 | Rev 0 to Structural Steel Analysis for Peach Bottom Generating Station:Calculation 94,Unit 2,3,Turbine Bldg El 116 Ft Counting Room,Fire Area 78E | |
ML20126J909 | 24 May 1985 | Rev 0 to Structural Steel Analysis for Peach Bottom Generating Station:Calculation 93,Unit 2,3,Turbine Bldg El 116 Ft Health Physics Util Room,Fire Area 82 | |
ML20126J886 | 24 May 1985 | Rev 0 to Structural Steel Analysis for Peach Bottom Generating Station:Calculation 92,Unit 2,3,Turbine Bldg El 116 Ft Conventional Chemistry Lab,Fire Area 78D | |
ML20126J858 | 24 May 1985 | Rev 0 to Structural Steel Analysis for Peach Bottom Generating Station:Calculation 91,Unit 2,3,Turbine Bldg El 118 Ft Radiation Chemistry Lab,Fire Area 78C | |
ML20126J825 | 20 May 1985 | Rev 0 to Structural Steel Analysis for Peach Bottom Generating Station:Calculation 24,Unit 2,3,Turbine Bldg El 116 Ft Common Equipment Area (Beneath Switchgear Rooms),Fire Area 78B | |
ML20238D865 | 28 February 1985 | Hydrogen Water Chemistry Mini Test Final Rept. W/Two Oversize Drawings.Related Info Encl | |
ML20092D707 | 20 June 1984 | Ultrasonic Indications in Jet Pump Instrumentation Penetrations of Peach Bottom Atomic Power Station,Unit 3 | |
ML20084R300 | 14 March 1984 | Fire Endurance & Hose Stream Tests on Floor Penetration Fire Stops Design Fc 350 | |
ML20084R292 | 16 February 1984 | Fire Endurance & Hose Stream Tests on Wall Penetration Fire Stops Design Wp 713 | |
ML20082N338 | 31 December 1983 | HVAC Damper Program Penetration Seal Test Results & Exemption Requests | Safe Shutdown Exemption Request |
ML20084R288 | 4 November 1983 | Fire Endurance & Hose Stream Tests on Wall Penetration Fire Stops Design WP694 | |
ML20082G123 | 23 August 1983 | Reactor Containment Bldg Integrated Leakage Rate Test Rept, Conducted During Aug 1983 | Scram Discharge Volume |
ML20080F980 | 14 February 1983 | Rept of Plant Startup Following Fifth Refueling Outage, Feb 1983 | Shutdown Margin |
ML20027C324 | 28 February 1982 | Rept of Plant Startup Following Fifth Refueling Outage, 820219 | Shutdown Margin Post Accident Monitoring Scram Discharge Volume |
ML20039B680 | 6 September 1981 | Primary Reactor Containment Integrated Leakage Rate Test Rept. | |
ML20041C807 | 7 March 1981 | Rept of Plant Startup Following Fourth Refueling Outage, 810307. | Shutdown Margin Scram Discharge Volume |
ML20062K248 | 28 July 1980 | Primary Reactor Containment Integrated Leak Rate Test | |
ML19345A824 | 31 March 1980 | Rept of Plant Startup Following Fourth Refueling Outage, Mar 1980. | Shutdown Margin |
ML19344D263 | 5 March 1980 | Rept of Startup Following Third Refueling Outage,Sept 1979. | Shutdown Margin |
ML19274D330 | 31 October 1978 | Rept of Plant Start-up Following Third Refueling Outage Sept-Oct 1978. Assures That Unit 2 Refueling Outage Caused No Conditions or Sys Characteristics to Diminish Safe Operation | Shutdown Margin Liquid penetrant |
ML20081B987 | 4 April 1977 | Reactor Containment Bldg:Integrated Leakage Rate Test Rept | Reactor Vessel Water Level |
ML20072N749 | 22 July 1975 | Noise Level Measurements Surveillance Test Results | |
ML20072N755 | 30 April 1975 | Noise Level Measurements Surveillance Test Results | |
ML20072N778 | 29 October 1974 | Noise Level Measurements Surveillance Test Results | |
ML20072N761 | 25 July 1974 | Noise Level Instruments Surveillance Test Results | |
ML20072N770 | 24 February 1974 | Noise Level Measurements Surveillance Test Results |