f hfessiorsal Loss Control, Inc.
STRUCTURAL STEEL ANALYSIS Il' for PEACH BOTTOM GENERATING STATION Calculation No. 96 I
Unit.2,3
~
]
i Turbine Building El. 116'-O" l
T 11et Aree 9
l Fire Area 115 W
Date: __I'k_'_E(
Prepared by:
Reviewed by: _ M Revision: 0 8506100748 850606 PDR ADOCK 05000277 F
PDR 7922 West Chester Pike
- Upper Darby, Pa.19082 * (215) 853-1700
,4 d4 Pmfruiond Ian Contml. ine.
PEACH BOTTOM GENERATING STATION 1-eBE6_DE29BIEII9N The area under consideration is the Toilet Area on the 116'-O" elevation of the Turbine Building (Fire Area 115).
The bounding walls are constructed of reinforced concrete with an average thickness of 1 ft.
The total surface area for heat transfer la 1661 ft2 (see Attachment A for a sketch of the area under consideration).
2.
995aHEIIHLE_L9691gG There are no combustible liquida or cable traya located in this area.
+
3.
vggIIbaIIgy_gegeggIggg 1
There is one door 'which enters this area.
{
9eer_
__Elas__
besatien l
123 3'-0"x 7'-O" West Wall 4.
gAgg@_gXAMINgg Since there are no exposed fixed combustibles in this area, no cases were examined for a general room fire.
1 1
u
..e
- r r.ua u.. c a,a.s
(..
5.
RgggLTg No general room fire was postulated because of the lack of
-exposed fixed combustibles in the area.
There are no cable-trays in this area to present a localized heating exposure to the structural steel.
6-EEEE9I!_9E_IBeHEIEHT_995aMEIIBLE!
This area contains no exposed fixed combustiblea.
The table
~
below lists the maximum heat release rate for transient combustibles for different fire durations which result in an area
(~
temperature less than 11000F.
2 Eirg_guratign gla_1ggtm 1 91hW1 l' hour' 10.5 1,620 2 houra 8.0 1,235 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> 6.5 1,003 The distance between the floor and the deepeat beams supporting the ceiling is 16'-8 1/2".-
The heat release rates required of floor level transient combustible fires to produce plume temperatures of-11000F, 13OOOF and 15000F at the bottom 2
v-
.,...--e,g_
.-,-_,n.,_g.,
,,..n_.-..,,_e.,
.,,, e -v
Profmionalloes Omtrol,ine.
'(T flange of'the beam have been determined and tabulated below.
For 0
the temperatures. greater than 1100 F the time required to heat the sizes of the beams supporting the ceiling have also been determined.
Ilme_t9_1199 Elmini Il 1 91hW1 W1E_u_29
_W1E_a_2E_
1100 7,257 g
^
1300 9,549 14 38 1500 12,042 10 26
~
a f
A 3
~ _ _ _ - _ _ _ _ _ _ _ _. _ _ _
s-Pmfensionsi Lose Castml. Inc.
~
(
N W
g
.)
%.1, TotLET
(.
.,)
('
Unit 2,3 Turbine Building Elevation 116'-0" Toilet Area Surface Area Calculation Walls 2
North wall (30' x 18')
540 ft East wall (9.3' x 18')
167ftf South wall (30' x 18')
540 ft 2 West wall (9.3' x 18')
167 ft 2
1,414 ft 2
Ceiling (9.3' x 30') - (5.3' x 6) 247 ft 2
Total Area for Heat Transfer 1,661 ft k
ATTACHMENT A