STRUCTURAL STEEL ANALYSIS for PEACH BOTTOM GENERATING STATION I
s Calculation No. 95 Unit 2,3 Turbine Building El. 116'-O" Clean Clothea Room Fire Aree 114 h
h k $5000277 F
__('_h_Y **((
Prepared by:
Date:
Reviewed by:
Revision: 0 7922 West Chester Pike
- Upper Darby, Pa. 19082 * (215) 853 1700
e s
r r.
.n. c-aa ua.
PEACH BOTTOM JENERATING STATION 1.
AREA _DgggRIPTIgN The area under consideration is the Clean Clothes Room on the 116'-O" elevation of the Turbine Building (Fire Area 11j).
The bounding walla are constructed of reinforced concrete with an average thickness of 1 ft.
The total surface area for heat transfer la 1,044 ft2 (see Attachment A for a sketch of the area under consideration).
2.
ggggggIIghg_Lgaging There are no combustible liquida or cable traya located in this a rer..
r' 3.
YEMIIb6II9H_EeB6HEIEEE There la one door'which enters this area.
geer _
__Elas__
beestien 115 3'-O"x 7'-O" North Wall 4+
g6EEE_EE651EEg Since there are no exposed fixed combustibles in this area, no cases were examined for a general room fire.
k 1
~ - - -.. - _ _ _ - -. -..- -,
l i
\\
1 Pmfunnionalloss Centrol,Inc.
,o i
(
5.
RggULTg No general room fire was postulated because of the lack of exposed fixed combustibles in the area.
There are no. cable trays in this area to present a localized heating exposure to the structural steel.
6.
EEEE9I!_9E_IBeHEIEHI_ggggugIIntgg This area contains no exposed fixed combustibles.
The table below lista the maximum heat release rate for transient combustibles for different fire durations which result in an area
(
temperature less than 11000F.
2 Eirm_Duratien 9ta_1hWis 1 91hW1 I hour '
10.5 1,018
(
2 houra 8.0 776 3 houra 6.5 630 The distance between the floor and the deepest beams supporting the ceiling is 16'-8 1/2".
The heat release rates required of floor level transient combustible fires to produce plume temperatures of 11000r, 13000F and 15000F at the bottom k.
2
r
- (
s' hofresionalLane ControlInc.
s
. 'c flange of the beam have been determined and tabulated below.
For the temperatures greater than 11000F the time required to heat i
the sizes of the beams supporting the ceiling have also been determined.
}.
l' Ilme to_1199 Elmini I
II 1 91hW1
_W19_t!_29_
I 1100 7,257 f-1300 9,549 38 I
l.
1500 12,042 26 L
(
l l
4 4
e
(
3 i
ir
6.
. s' m a..u.iza,c m zu.
N
(
W L
s L
(.
can p,
t' CLOTHS wwd' -
-w
(
20 25 t
t Unit 2,'3, Turbine Building, Elevation 116'-0" Clear; Cothes Room j
1 i
Surface Area Calcul& tion Walls 2
North wall (16' x 18')
288 ft 2
East wall
( 9' x 18')
162 ft j
2 South wall (16' x 18')
288 ft 2
West wall
( 9' x 18')
162 ft 2
900 ft 2
Ceiling
( 9' x 16',)
144 ft t
2 Total Area for Heat Transfer 1,044 ft f