T~

1

  • _PL C ~1"a~' "" """ '"'

STRUCTURAL STEEL ANALYSIS for PEACH BOTTOM GENERATING STATION I

s Calculation No. 95 Unit 2,3 Turbine Building El. 116'-O" Clean Clothea Room Fire Aree 114 h

h k $5000277 F

PDR

__('_h_Y **((

Prepared by:

Date:

Reviewed by:

Revision: 0 7922 West Chester Pike

  • Upper Darby, Pa. 19082 * (215) 853 1700

e s

r r.

.n. c-aa ua.

PEACH BOTTOM JENERATING STATION 1.

AREA _DgggRIPTIgN The area under consideration is the Clean Clothes Room on the 116'-O" elevation of the Turbine Building (Fire Area 11j).

The bounding walla are constructed of reinforced concrete with an average thickness of 1 ft.

The total surface area for heat transfer la 1,044 ft2 (see Attachment A for a sketch of the area under consideration).

2.

ggggggIIghg_Lgaging There are no combustible liquida or cable traya located in this a rer..

r' 3.

YEMIIb6II9H_EeB6HEIEEE There la one door'which enters this area.

geer _

__Elas__

beestien 115 3'-O"x 7'-O" North Wall 4+

g6EEE_EE651EEg Since there are no exposed fixed combustibles in this area, no cases were examined for a general room fire.

k 1

~ - - -.. - _ _ _ - -. -..- -,

l i

\\

1 Pmfunnionalloss Centrol,Inc.

,o i

(

5.

RggULTg No general room fire was postulated because of the lack of exposed fixed combustibles in the area.

There are no. cable trays in this area to present a localized heating exposure to the structural steel.

6.

EEEE9I!_9E_IBeHEIEHI_ggggugIIntgg This area contains no exposed fixed combustibles.

The table below lista the maximum heat release rate for transient combustibles for different fire durations which result in an area

(

temperature less than 11000F.

2 Eirm_Duratien 9ta_1hWis 1 91hW1 I hour '

10.5 1,018

(

2 houra 8.0 776 3 houra 6.5 630 The distance between the floor and the deepest beams supporting the ceiling is 16'-8 1/2".

The heat release rates required of floor level transient combustible fires to produce plume temperatures of 11000r, 13000F and 15000F at the bottom k.

2

r

- (

s' hofresionalLane ControlInc.

s

. 'c flange of the beam have been determined and tabulated below.

For the temperatures greater than 11000F the time required to heat i

the sizes of the beams supporting the ceiling have also been determined.

}.

l' Ilme to_1199 Elmini I

II 1 91hW1

_W19_t!_29_

I 1100 7,257 f-1300 9,549 38 I

l.

1500 12,042 26 L

(

l l

4 4

e

(

3 i

ir

6.

. s' m a..u.iza,c m zu.

N

(

W L

s L

(.

can p,

t' CLOTHS wwd' -

-w

(

20 25 t

t Unit 2,'3, Turbine Building, Elevation 116'-0" Clear; Cothes Room j

1 i

Surface Area Calcul& tion Walls 2

North wall (16' x 18')

288 ft 2

East wall

( 9' x 18')

162 ft j

2 South wall (16' x 18')

288 ft 2

West wall

( 9' x 18')

162 ft 2

900 ft 2

Ceiling

( 9' x 16',)

144 ft t

2 Total Area for Heat Transfer 1,044 ft f

ATTACHMENT A t

u.

_ _ _____