Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20133A402 | 18 December 1996 | DPC CNS Unit 1 Cycle 10 Startup Rept Dec 1996 | Stroke time Past operability |
ML20107E480 | 10 April 1996 | End of Cycle 8 Refueling Outage SG Tube Insp Rept,Including Quantities of SG Tubes Inspected,Info Re Tube Indications of Imperfections & Quantities of Tube Removed from Svc by Plugging or Repaired by Sleeving | |
ML20100H051 | 29 February 1996 | Duke Power Co Catawba Nuclear Station,Unit 2 Cycle 8 Startup Rept | |
ML20076G431 | 13 October 1994 | Cycle 7 Startup Rept. W/ | |
ML20045F228 | 30 June 1993 | Cycle 6 Startup Rept. W/ 930630 Ltr | |
ML20044G571 | 25 May 1993 | Addl Pages to Catawba Unit 2 Reactor Containment Bldg ILRT Rept, Covering Containment Calculated Values,Calculated Total Time Leak & Mass Point Leak | |
ML20044C974 | 28 February 1993 | Reactor Containment Bldg Integrated Leakage Rate Test Rept. | |
ML20096D915 | 7 May 1992 | Twenty-Second Quarterly Update to Startup Rept,Catawba Unit 2,Cycle 1 | |
ML20086D824 | 13 November 1991 | Twentieth Quarterly Update to Unit 2 Startup Test Rept | |
ML20082U285 | 30 September 1991 | Cycle 6 Startup Rept. W/ | Boric Acid Shutdown Margin |
ML20073M843 | 7 May 1991 | Startup Rept Quarterly Update,Catawba Unit 2,Cycle 1. W/ | |
ML20077Q462 | 31 March 1991 | Reactor Containment Bldg Integrated Leak Rate Test 910328-30 | |
ML20062G264 | 7 November 1990 | Sixteenth Quarterly Update to Startup Rept,Catawba Unit 2, Cycle 1 | |
ML20058Q161 | 7 August 1990 | Fifteenth Quarterly Update to Startup Rept,Catawba Unit 2, Cycle 1 | |
ML20043B100 | 7 May 1990 | Startup Rept,Quarterly Update Catawba Unit 2,Cycle 1. W/ 900515 Ltr | |
ML20247G403 | 31 August 1989 | Cycle 3 Startup Rept. W/ | Shutdown Margin Coatings |
ML20245G092 | 19 June 1989 | Reactor Containment Bldg Integrated Leak Rate Test for 890316-18 | |
ML20247H767 | 15 May 1989 | Tenth Quarterly Update to Startup Rept | |
ML20150E058 | 30 June 1988 | Cycle 2 Startup Rept | Shutdown Margin Overspeed trip |
ML20151U243 | 7 April 1988 | Cycle 3 Startup Rept | Overspeed trip |
ML20147F781 | 26 November 1987 | Reactor Containment Bldg Integrated Leak Rate Test,871124- 26 | Local Leak Rate Testing Continuous fire watch Fire Watch |
ML20237H398 | 13 August 1987 | Startup Rept Quarterly Update,Catawba Unit 2,Cycle 1, 870813 | |
ML20214C389 | 17 November 1986 | Startup Rept | |
ML20137V669 | 21 November 1985 | Reactor Containment Bldg Integrated Leak Rate Test (Preoperational) | |
ML20133A209 | 27 September 1985 | Startup Rept | Shutdown Margin B.5.b Power change Overspeed trip Manual Operator Action |
ML20205E481 | 6 June 1985 | Seismic Simulation Test Program on Electrical Isolation Mounting Sys of Typical Electrical Encl | |
ML20099E656 | 18 February 1985 | Rev 1 to Reactor Vessel Cavity Seal Test Results,Catawba Nuclear Station,Units 1 & 2,McGuire Nuclear Station,Units 1 & 2 | Hydrostatic |
ML20104A960 | 18 January 1985 | Reactor Vessel Cavity Seal Test Results | Hydrostatic |
ML20107H925 | 6 November 1984 | Corrected Rev 3 to Inservice Testing Program for Pumps & Valves | |
ML20107H917 | 6 November 1984 | Corrected Rev 2 to Inservice Testing Program for Pumps & Valves | |
ML20106C654 | 28 September 1984 | Diesel Engine 1B Component Revalidation Insp, Final Rept | Liquid penetrant Overspeed trip |
ML20090F627 | 13 July 1984 | Rev 2 to Inservice Testing Program for Pumps & Valves | |
A07702, Torsiograph Test of Emergency Diesel Generator 1A at Catawba Nuclear Power Station | 29 May 1984 | Torsiograph Test of Emergency Diesel Generator 1A at Catawba Nuclear Power Station | |
ML20091K941 | 1 April 1984 | D/G 1A Blackout & Load Rejection. Rept Provided in Response to SER Confirmatory Item 37 | |
ML20092J857 | 18 January 1984 | Reactor Containment Bldg Integrated Leak Rate Test (Preoperational), Conducted 840110-18 | |
ML20093D381 | 30 December 1983 | Nuclear Safety-Related Diaphragm Valves Item 5B-473 Frequency Rept | |
ML20093D349 | 14 October 1983 | Itt Grinnell Seismic Qualification Documents | |
ML20093D360 | 30 September 1983 | Rev 1 to Seismic Calculations for ASME Section Iii,Class 2 Valves | Earthquake |
ML20054L146 | 30 November 1981 | Duke Power Co Nuclear Station Post-Accident Liquid Sampling Sys Sampling & Control Panels Functional Testing Rept,Nov 1981 | Boric Acid Grab sample Slow transfer Tornado Missile Emergency Lighting Unidentified leakage Overspeed trip |
ML20093D406 | 30 September 1980 | Static Deflection Test 4 Inch Itt Grinnell Diaphragm Valve W/14NAT1 Rotork for Duke Power | |
ML20093D448 | 9 April 1979 | Rev a to Seismic Analysis of 4 Inch,150 Lb Carbon Steel Motor Operator Gate Valve | Safe Shutdown Earthquake Earthquake |
ML20101P643 | 30 September 1977 | Pressure Mitigating Sys Transient Analysis Results, Suppl to Jul 1977 Rept |