Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217F3481999-10-15015 October 1999 Marked-up & Reprinted TS Pages,Changing TS Requirements for Insp of RCP Flywheels ML20212E7851999-09-16016 September 1999 Proposed Tech Specs Pages,Modifying Surveillance Requirements 3.8.4.8,3.8.4.9 & 3.8.4.8 Bases to Allow Testing of DC Channel Batteries with Units on Line ML20211A9881999-08-18018 August 1999 Rev 5 to DPC Nuclear Security Training & Qualification Plan ML20210N3151999-08-0404 August 1999 Proposed Tech Specs Changing TSs 3.3.2, ESFAS Instrumentation, 3.3.3, Post Accident Monitoring Instrumentation, 3.4.14, RCS Loops - Test & 5.3, Unit Staff Qualifications ML20210N9641999-07-26026 July 1999 Revised Catawba Nuclear Station Selected Licensee Commitments Manual ML20211C3731999-07-26026 July 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual & List of Effective Pages ML20196H7551999-06-24024 June 1999 Proposed Tech Specs 2.0, Safety Limits, TS 3.3.1, Reactor Trip Sys Instrumentation & TS 3.4.1, RCS Pressure,Temp & Flow Departure from Nucleate Boiling (DNB) Limits ML20210A5911999-06-10010 June 1999 Revised Catawba Nuclear Station Selected Licensee Commitments Manual ML20216D4061999-06-10010 June 1999 Revised Catawba Nuclear Station Selected Licensee Commitment Manual, List of Effective Pages ML20211C3751999-05-19019 May 1999 5 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program. Page 1 of 15 in Section 4.1 of Incoming Submittal Not Included ML20195B4181999-05-18018 May 1999 Revised Pages to Catawba Nuclear Station Selected Licensee Commitments Manual ML20206M9391999-05-0606 May 1999 Proposed Tech Specs,Revising List of Referenced Documents in TS 5.6.5b Re COLR Requirements ML20206T0571999-05-0505 May 1999 Revised Catawba Nuclear Station Selected Licensee Commitments Manual. with List of Effective Pages ML20206J4531999-04-22022 April 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20206Q8741999-04-22022 April 1999 Revs to CNS Selected Licensee Commitments Manual,Including Page 5 of List of Effective Pages & Pages 1-11 to Chapter 16.9-13.With ML20206B1271999-04-15015 April 1999 CNS Selected Licensee Commitments Manual, List of Effective Pages ML20206C0391999-04-15015 April 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20205C6901999-03-25025 March 1999 Proposed TS Facilitating Treatment of RTS Instrumentation, ESFAS Instrumentation,Lop DG Start Instrumentation,Cp & Exhaust Isolation Instrumentation & LTOP PORV TS Trip Setpoints as Nominal Values ML20204G2541999-03-16016 March 1999 Revised Pages to Catawba Nuclear Station Licensee Commitments Manual ML20204E5281999-03-15015 March 1999 Proposed Tech Specs Deleting TS for Cravs & Auxiliary Bldg Filtered Ventilation Exhaust Sys Actuation Instrumentation & Adding Note to TS for Cravs Re Chlorine Protection Function ML20204F6931999-03-11011 March 1999 Proposed Tech Specs 3.3.7 & 3.3.8 Re CR Area Ventilation Sys & Auxiliary Bldg Filtered Ventilation,Exhaust Sys Actuation Instrumentation ML20205B1341999-03-11011 March 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20204E7271999-03-0808 March 1999 Chapter 16.5-2,page 1-3 to CNS Selected Licensee Commitments Manual. with List of Effective Pages ML20203A3331999-01-28028 January 1999 Proposed Tech Specs Modifying Flowrate Specified for SR 3.7.13.4 from Value Representative of One Filter Unit/Fan to Value Representative of Entire Fhves Train ML20199H4061999-01-16016 January 1999 Revised CNS Selected Licensee Commitments Manual ML20197G8991998-12-0707 December 1998 Proposed ITS 3.8.3,modifying Inventory Requirements for DG Lube Oil Sys ML20195D6481998-11-11011 November 1998 Proposed Tech Specs,Modifying Details of SRs 3.6.11.6 & 3.6.11.7 to Be Consistent with Design of Containment Pressure Control Sys at Plant ML20155B2111998-10-22022 October 1998 Proposed Revs to Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009 & DPC-NE-2009P ML20154L7191998-10-0505 October 1998 Rev 8 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20151Y1821998-09-15015 September 1998 Proposed Improved TSs Providing Changes Necessary to Resolve Items Identified by Util During Review ML20151T9491998-09-0808 September 1998 Proposed Tech Specs & Bases Re Relocation from Current TS & Scheduling of New More Restrictive Surveillance Requirements ML20237B6241998-08-14014 August 1998 Proposed Tech Specs 4.6.5.1.b.2 & 4.6.5.1b.3 Relating to Ice Condenser Ice Bed Changing Portion of Surveillances Pertaining to Lower Inlet Plenum Support Structures & Turning Vanes from 9-month Frequency to 18-month Frequency ML20237B5751998-08-12012 August 1998 Proposed Tech Specs 4.6.5.1b.2 Re Ice Condenser Sys Components W/Respect to Accumulation of Frost or Ice ML20237A6571998-08-0606 August 1998 TS Page 3/4 8-9 Re Notice of Enforcement Discretion Request from Enforcing TS Surveillance Requirement 4.8.1.1.2i.2 ML20237A9341998-08-0606 August 1998 Proposed Tech Specs,Deleting SR 4.8.1.1.2i.2 for Pressure Test of DG Fuel Oil Sys ML20237A0361998-08-0505 August 1998 Suppl 8 to Improved TS (Its),Combining Units ITS Pages to Facilitate Ease of Use & Significantly Reduce Vol of Paper That Must Be Processed & Controlled ML20236U1531998-07-22022 July 1998 Proposed Revised Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009P & DPC-NE-2009 ML20236P8671998-07-0606 July 1998 Updated Pages to Catawba Nuclear Station Selected License Commitments Manual ML20249B3961998-06-15015 June 1998 Proposed Tech Specs Affecting Requirements for low-temp Overpressure Protection ML20249B6221998-06-11011 June 1998 Revised Table of Contents for Chapter 16 of Selected License Commitments Manual ML20248B5741998-05-22022 May 1998 Proposed Tech Specs Modifying SR 4.4.3.3 for Pressurizer Heaters to Be Consistent W/Plant Design & W/Ts Requirement as Delineated in Improved Tech Specs ML20247Q9871998-05-11011 May 1998 Revised Chapter 16 to Selected License Commitment Manual ML20217E9521998-04-20020 April 1998 Proposed Tech Specs Revising Requirements for Automatic Actuation Logic & Actuation Relays Associated W/Cravs Operation Function,Which Is Part of ESFAS ML20217E9831998-04-20020 April 1998 Proposed Improved Tech Specs Sections 1.0,2.0,3.0 & 4.0 ML20217F2841998-04-20020 April 1998 Rev 7 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20216B9721998-04-0808 April 1998 Proposed Tech Specs 3/4.6.5 Re Ice Condenser Reduction of Required Ice Weight ML20217C7121998-03-20020 March 1998 Proposed Improved TS Section 3.6 Re Containment Sys ML20216B7691998-03-0909 March 1998 Proposed Tech Specs Pages Responding to 980116 RAI Re Improved TS Sections 3.1 & 3.2.Suppl Changes to Improved TS Also Included ML20217Q3741998-03-0303 March 1998 Proposed Tech Specs Re Catawba Safety Review Group ML20197G4391997-12-17017 December 1997 Proposed Tech Specs Referencing Updated or Recently Approved Methodologies Used to Calculate cycle-specific Limits Contained in COLR 1999-09-16
[Table view] Category:TEST REPORT
MONTHYEARML20133A4021996-12-18018 December 1996 DPC CNS Unit 1 Cycle 10 Startup Rept Dec 1996 ML20107E4801996-04-10010 April 1996 End of Cycle 8 Refueling Outage SG Tube Insp Rept,Including Quantities of SG Tubes Inspected,Info Re Tube Indications of Imperfections & Quantities of Tube Removed from Svc by Plugging or Repaired by Sleeving ML20100H0511996-02-29029 February 1996 Duke Power Co Catawba Nuclear Station,Unit 2 Cycle 8 Startup Rept ML20076G4311994-10-13013 October 1994 Cycle 7 Startup Rept. W/ ML20045F2281993-06-30030 June 1993 Cycle 6 Startup Rept. W/ 930630 Ltr ML20044G5711993-05-25025 May 1993 Addl Pages to Catawba Unit 2 Reactor Containment Bldg ILRT Rept, Covering Containment Calculated Values,Calculated Total Time Leak & Mass Point Leak ML20044C9741993-02-28028 February 1993 Reactor Containment Bldg Integrated Leakage Rate Test Rept. ML20096D9151992-05-0707 May 1992 Twenty-Second Quarterly Update to Startup Rept,Catawba Unit 2,Cycle 1 ML20086D8241991-11-13013 November 1991 Twentieth Quarterly Update to Unit 2 Startup Test Rept ML20082U2851991-09-30030 September 1991 Cycle 6 Startup Rept. W/ ML20073M8431991-05-0707 May 1991 Startup Rept Quarterly Update,Catawba Unit 2,Cycle 1. W/ ML20077Q4621991-03-31031 March 1991 Reactor Containment Bldg Integrated Leak Rate Test 910328-30 ML20062G2641990-11-0707 November 1990 Sixteenth Quarterly Update to Startup Rept,Catawba Unit 2, Cycle 1 ML20058Q1611990-08-0707 August 1990 Fifteenth Quarterly Update to Startup Rept,Catawba Unit 2, Cycle 1 ML20043B1001990-05-0707 May 1990 Startup Rept,Quarterly Update Catawba Unit 2,Cycle 1. W/ 900515 Ltr ML20247G4031989-08-31031 August 1989 Cycle 3 Startup Rept. W/ ML20245G0921989-06-19019 June 1989 Reactor Containment Bldg Integrated Leak Rate Test for 890316-18 ML20247H7671989-05-15015 May 1989 Tenth Quarterly Update to Startup Rept ML20150E0581988-06-30030 June 1988 Cycle 2 Startup Rept ML20151U2431988-04-0707 April 1988 Cycle 3 Startup Rept ML20147F7811987-11-26026 November 1987 Reactor Containment Bldg Integrated Leak Rate Test,871124- 26 ML20237H3981987-08-13013 August 1987 Startup Rept Quarterly Update,Catawba Unit 2,Cycle 1, 870813 ML20214C3891986-11-17017 November 1986 Startup Rept ML20137V6691985-11-21021 November 1985 Reactor Containment Bldg Integrated Leak Rate Test (Preoperational) ML20133A2091985-09-27027 September 1985 Startup Rept ML20205E4811985-06-0606 June 1985 Seismic Simulation Test Program on Electrical Isolation Mounting Sys of Typical Electrical Encl ML20099E6561985-02-18018 February 1985 Rev 1 to Reactor Vessel Cavity Seal Test Results,Catawba Nuclear Station,Units 1 & 2,McGuire Nuclear Station,Units 1 & 2 ML20104A9601985-01-18018 January 1985 Reactor Vessel Cavity Seal Test Results ML20107H9251984-11-0606 November 1984 Corrected Rev 3 to Inservice Testing Program for Pumps & Valves ML20107H9171984-11-0606 November 1984 Corrected Rev 2 to Inservice Testing Program for Pumps & Valves ML20106C6541984-09-28028 September 1984 Diesel Engine 1B Component Revalidation Insp, Final Rept ML20090F6271984-07-13013 July 1984 Rev 2 to Inservice Testing Program for Pumps & Valves A07702, Torsiograph Test of Emergency Diesel Generator 1A at Catawba Nuclear Power Station1984-05-29029 May 1984 Torsiograph Test of Emergency Diesel Generator 1A at Catawba Nuclear Power Station ML20091K9411984-04-0101 April 1984 D/G 1A Blackout & Load Rejection. Rept Provided in Response to SER Confirmatory Item 37 ML20092J8571984-01-18018 January 1984 Reactor Containment Bldg Integrated Leak Rate Test (Preoperational), Conducted 840110-18 ML20093D3811983-12-30030 December 1983 Nuclear Safety-Related Diaphragm Valves Item 5B-473 Frequency Rept ML20093D3491983-10-14014 October 1983 Itt Grinnell Seismic Qualification Documents ML20093D3601983-09-30030 September 1983 Rev 1 to Seismic Calculations for ASME Section Iii,Class 2 Valves ML20054L1461981-11-30030 November 1981 Duke Power Co Nuclear Station Post-Accident Liquid Sampling Sys Sampling & Control Panels Functional Testing Rept,Nov 1981 ML20093D4061980-09-30030 September 1980 Static Deflection Test 4 Inch Itt Grinnell Diaphragm Valve W/14NAT1 Rotork for Duke Power ML20093D4481979-04-0909 April 1979 Rev a to Seismic Analysis of 4 Inch,150 Lb Carbon Steel Motor Operator Gate Valve ML20101P6431977-09-30030 September 1977 Pressure Mitigating Sys Transient Analysis Results, Suppl to Jul 1977 Rept 1996-04-10
[Table view] |
Text
.
. ll l s, ,,. , us se , I
}'!i l; s s f DUKEPOWER May 7,1991 U. S. Nuclear Regulatory Commission NITN: Document Control Desk Washington, DC 20555
Subject:
Catawba Nuclear Station, Unit 2 Docket No. 50-414 Eighteenth Quarterly Update to Startup Report In accordance with Section 6.9.1.3 of the Catawba Nuclear Station Tecnaical Specifications, find attached the eighteenth quarterly update to the Unit 2 Startup Report.
As indicated in my February 7,1991 letter, one test is not complete. Additional quarterly updates to the Startup Report will be submitted as required by the Technical Specifications.
Very truly yours, N8 V:. 2%
M. S. Tuckman CRU18THUPSR Attachment xc: S. D. Ebneter Regional Administrator, Region II R. E. Martin, ONRR W. T. Orders Senior Resident Inspector 9105160039 910507
',DR ADOCK0500g4 7 4 ) i
T STARTUP REPORT QUARTERLY UPDATE CATAWBA UNIT 2 CYCLE 1 hiay 7,1991 TESTING COhfPLETED DURING OUARTER None.
STATUS OF TESTING NOT COhfPLETE STEADY STATE PIPING SYSTEhtS OPERATIONAL VIBRATION h1EASUREh1ENT -
TP/2/A/1200/21 This test was described in Sections 10.5 and 11.5 of the Startup Report. This test is complete except for retesting the piping associated with the Diesel Generator Fuel Oil and Lube Oil Systems. Additional restraints were installed during the EOC-1 refueling outage.
However, further modification was found to be necessary. This modification involved the replacement of rigid piping with flexible piping. Vibration testing following completion of the modification indicated that overall vibration levels had been reduced. However, vibration levels in isolated portions of the piping still exceeded the allowable criteria.
These levels were evaluated and found to not constitute aa. imminent danger of failure. To resolve these isolated problems, modifications were planned which will result in a piping configuration similar to Unit 1. These modifications include the replacement of non-standard - fittings with - standard Ettings, deletion of unnecessary flanges, and valve relocation. Due to the extent of these modifications, work requests have been issued to perform these modifications during the Unit 2 EOC 4 refueling outage scheduled for the fourth quarter of 1991.