MONTHYEARML20217F3481999-10-15015 October 1999 Marked-up & Reprinted TS Pages,Changing TS Requirements for Insp of RCP Flywheels ML20212E7851999-09-16016 September 1999 Proposed Tech Specs Pages,Modifying Surveillance Requirements 3.8.4.8,3.8.4.9 & 3.8.4.8 Bases to Allow Testing of DC Channel Batteries with Units on Line ML20211A9881999-08-18018 August 1999 Rev 5 to DPC Nuclear Security Training & Qualification Plan ML20210N3151999-08-0404 August 1999 Proposed Tech Specs Changing TSs 3.3.2, ESFAS Instrumentation, 3.3.3, Post Accident Monitoring Instrumentation, 3.4.14, RCS Loops - Test & 5.3, Unit Staff Qualifications ML20210N9641999-07-26026 July 1999 Revised Catawba Nuclear Station Selected Licensee Commitments Manual ML20211C3731999-07-26026 July 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual & List of Effective Pages ML20196H7551999-06-24024 June 1999 Proposed Tech Specs 2.0, Safety Limits, TS 3.3.1, Reactor Trip Sys Instrumentation & TS 3.4.1, RCS Pressure,Temp & Flow Departure from Nucleate Boiling (DNB) Limits ML20210A5911999-06-10010 June 1999 Revised Catawba Nuclear Station Selected Licensee Commitments Manual ML20216D4061999-06-10010 June 1999 Revised Catawba Nuclear Station Selected Licensee Commitment Manual, List of Effective Pages ML20211C3751999-05-19019 May 1999 5 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program. Page 1 of 15 in Section 4.1 of Incoming Submittal Not Included ML20195B4181999-05-18018 May 1999 Revised Pages to Catawba Nuclear Station Selected Licensee Commitments Manual ML20206M9391999-05-0606 May 1999 Proposed Tech Specs,Revising List of Referenced Documents in TS 5.6.5b Re COLR Requirements ML20206T0571999-05-0505 May 1999 Revised Catawba Nuclear Station Selected Licensee Commitments Manual. with List of Effective Pages ML20206J4531999-04-22022 April 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20206Q8741999-04-22022 April 1999 Revs to CNS Selected Licensee Commitments Manual,Including Page 5 of List of Effective Pages & Pages 1-11 to Chapter 16.9-13.With ML20206B1271999-04-15015 April 1999 CNS Selected Licensee Commitments Manual, List of Effective Pages ML20206C0391999-04-15015 April 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20205C6901999-03-25025 March 1999 Proposed TS Facilitating Treatment of RTS Instrumentation, ESFAS Instrumentation,Lop DG Start Instrumentation,Cp & Exhaust Isolation Instrumentation & LTOP PORV TS Trip Setpoints as Nominal Values ML20204G2541999-03-16016 March 1999 Revised Pages to Catawba Nuclear Station Licensee Commitments Manual ML20204E5281999-03-15015 March 1999 Proposed Tech Specs Deleting TS for Cravs & Auxiliary Bldg Filtered Ventilation Exhaust Sys Actuation Instrumentation & Adding Note to TS for Cravs Re Chlorine Protection Function ML20204F6931999-03-11011 March 1999 Proposed Tech Specs 3.3.7 & 3.3.8 Re CR Area Ventilation Sys & Auxiliary Bldg Filtered Ventilation,Exhaust Sys Actuation Instrumentation ML20205B1341999-03-11011 March 1999 Revs to Catawba Nuclear Station Selected Licensee Commitments Manual ML20204E7271999-03-0808 March 1999 Chapter 16.5-2,page 1-3 to CNS Selected Licensee Commitments Manual. with List of Effective Pages ML20203A3331999-01-28028 January 1999 Proposed Tech Specs Modifying Flowrate Specified for SR 3.7.13.4 from Value Representative of One Filter Unit/Fan to Value Representative of Entire Fhves Train ML20199H4061999-01-16016 January 1999 Revised CNS Selected Licensee Commitments Manual ML20197G8991998-12-0707 December 1998 Proposed ITS 3.8.3,modifying Inventory Requirements for DG Lube Oil Sys ML20195D6481998-11-11011 November 1998 Proposed Tech Specs,Modifying Details of SRs 3.6.11.6 & 3.6.11.7 to Be Consistent with Design of Containment Pressure Control Sys at Plant ML20155B2111998-10-22022 October 1998 Proposed Revs to Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009 & DPC-NE-2009P ML20154L7191998-10-0505 October 1998 Rev 8 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20151Y1821998-09-15015 September 1998 Proposed Improved TSs Providing Changes Necessary to Resolve Items Identified by Util During Review ML20151T9491998-09-0808 September 1998 Proposed Tech Specs & Bases Re Relocation from Current TS & Scheduling of New More Restrictive Surveillance Requirements ML20237B6241998-08-14014 August 1998 Proposed Tech Specs 4.6.5.1.b.2 & 4.6.5.1b.3 Relating to Ice Condenser Ice Bed Changing Portion of Surveillances Pertaining to Lower Inlet Plenum Support Structures & Turning Vanes from 9-month Frequency to 18-month Frequency ML20237B5751998-08-12012 August 1998 Proposed Tech Specs 4.6.5.1b.2 Re Ice Condenser Sys Components W/Respect to Accumulation of Frost or Ice ML20237A6571998-08-0606 August 1998 TS Page 3/4 8-9 Re Notice of Enforcement Discretion Request from Enforcing TS Surveillance Requirement 4.8.1.1.2i.2 ML20237A9341998-08-0606 August 1998 Proposed Tech Specs,Deleting SR 4.8.1.1.2i.2 for Pressure Test of DG Fuel Oil Sys ML20237A0361998-08-0505 August 1998 Suppl 8 to Improved TS (Its),Combining Units ITS Pages to Facilitate Ease of Use & Significantly Reduce Vol of Paper That Must Be Processed & Controlled ML20236U1531998-07-22022 July 1998 Proposed Revised Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009P & DPC-NE-2009 ML20236P8671998-07-0606 July 1998 Updated Pages to Catawba Nuclear Station Selected License Commitments Manual ML20249B3961998-06-15015 June 1998 Proposed Tech Specs Affecting Requirements for low-temp Overpressure Protection ML20249B6221998-06-11011 June 1998 Revised Table of Contents for Chapter 16 of Selected License Commitments Manual ML20248B5741998-05-22022 May 1998 Proposed Tech Specs Modifying SR 4.4.3.3 for Pressurizer Heaters to Be Consistent W/Plant Design & W/Ts Requirement as Delineated in Improved Tech Specs ML20247Q9871998-05-11011 May 1998 Revised Chapter 16 to Selected License Commitment Manual ML20217E9521998-04-20020 April 1998 Proposed Tech Specs Revising Requirements for Automatic Actuation Logic & Actuation Relays Associated W/Cravs Operation Function,Which Is Part of ESFAS ML20217E9831998-04-20020 April 1998 Proposed Improved Tech Specs Sections 1.0,2.0,3.0 & 4.0 ML20217F2841998-04-20020 April 1998 Rev 7 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20216B9721998-04-0808 April 1998 Proposed Tech Specs 3/4.6.5 Re Ice Condenser Reduction of Required Ice Weight ML20217C7121998-03-20020 March 1998 Proposed Improved TS Section 3.6 Re Containment Sys ML20216B7691998-03-0909 March 1998 Proposed Tech Specs Pages Responding to 980116 RAI Re Improved TS Sections 3.1 & 3.2.Suppl Changes to Improved TS Also Included ML20217Q3741998-03-0303 March 1998 Proposed Tech Specs Re Catawba Safety Review Group ML20197G4391997-12-17017 December 1997 Proposed Tech Specs Referencing Updated or Recently Approved Methodologies Used to Calculate cycle-specific Limits Contained in COLR 1999-09-16
[Table view] Category:TEST REPORT
MONTHYEARML20133A4021996-12-18018 December 1996 DPC CNS Unit 1 Cycle 10 Startup Rept Dec 1996 ML20107E4801996-04-10010 April 1996 End of Cycle 8 Refueling Outage SG Tube Insp Rept,Including Quantities of SG Tubes Inspected,Info Re Tube Indications of Imperfections & Quantities of Tube Removed from Svc by Plugging or Repaired by Sleeving ML20100H0511996-02-29029 February 1996 Duke Power Co Catawba Nuclear Station,Unit 2 Cycle 8 Startup Rept ML20076G4311994-10-13013 October 1994 Cycle 7 Startup Rept. W/ ML20045F2281993-06-30030 June 1993 Cycle 6 Startup Rept. W/ 930630 Ltr ML20044G5711993-05-25025 May 1993 Addl Pages to Catawba Unit 2 Reactor Containment Bldg ILRT Rept, Covering Containment Calculated Values,Calculated Total Time Leak & Mass Point Leak ML20044C9741993-02-28028 February 1993 Reactor Containment Bldg Integrated Leakage Rate Test Rept. ML20096D9151992-05-0707 May 1992 Twenty-Second Quarterly Update to Startup Rept,Catawba Unit 2,Cycle 1 ML20086D8241991-11-13013 November 1991 Twentieth Quarterly Update to Unit 2 Startup Test Rept ML20082U2851991-09-30030 September 1991 Cycle 6 Startup Rept. W/ ML20073M8431991-05-0707 May 1991 Startup Rept Quarterly Update,Catawba Unit 2,Cycle 1. W/ ML20077Q4621991-03-31031 March 1991 Reactor Containment Bldg Integrated Leak Rate Test 910328-30 ML20062G2641990-11-0707 November 1990 Sixteenth Quarterly Update to Startup Rept,Catawba Unit 2, Cycle 1 ML20058Q1611990-08-0707 August 1990 Fifteenth Quarterly Update to Startup Rept,Catawba Unit 2, Cycle 1 ML20043B1001990-05-0707 May 1990 Startup Rept,Quarterly Update Catawba Unit 2,Cycle 1. W/ 900515 Ltr ML20247G4031989-08-31031 August 1989 Cycle 3 Startup Rept. W/ ML20245G0921989-06-19019 June 1989 Reactor Containment Bldg Integrated Leak Rate Test for 890316-18 ML20247H7671989-05-15015 May 1989 Tenth Quarterly Update to Startup Rept ML20150E0581988-06-30030 June 1988 Cycle 2 Startup Rept ML20151U2431988-04-0707 April 1988 Cycle 3 Startup Rept ML20147F7811987-11-26026 November 1987 Reactor Containment Bldg Integrated Leak Rate Test,871124- 26 ML20237H3981987-08-13013 August 1987 Startup Rept Quarterly Update,Catawba Unit 2,Cycle 1, 870813 ML20214C3891986-11-17017 November 1986 Startup Rept ML20137V6691985-11-21021 November 1985 Reactor Containment Bldg Integrated Leak Rate Test (Preoperational) ML20133A2091985-09-27027 September 1985 Startup Rept ML20205E4811985-06-0606 June 1985 Seismic Simulation Test Program on Electrical Isolation Mounting Sys of Typical Electrical Encl ML20099E6561985-02-18018 February 1985 Rev 1 to Reactor Vessel Cavity Seal Test Results,Catawba Nuclear Station,Units 1 & 2,McGuire Nuclear Station,Units 1 & 2 ML20104A9601985-01-18018 January 1985 Reactor Vessel Cavity Seal Test Results ML20107H9251984-11-0606 November 1984 Corrected Rev 3 to Inservice Testing Program for Pumps & Valves ML20107H9171984-11-0606 November 1984 Corrected Rev 2 to Inservice Testing Program for Pumps & Valves ML20106C6541984-09-28028 September 1984 Diesel Engine 1B Component Revalidation Insp, Final Rept ML20090F6271984-07-13013 July 1984 Rev 2 to Inservice Testing Program for Pumps & Valves A07702, Torsiograph Test of Emergency Diesel Generator 1A at Catawba Nuclear Power Station1984-05-29029 May 1984 Torsiograph Test of Emergency Diesel Generator 1A at Catawba Nuclear Power Station ML20091K9411984-04-0101 April 1984 D/G 1A Blackout & Load Rejection. Rept Provided in Response to SER Confirmatory Item 37 ML20092J8571984-01-18018 January 1984 Reactor Containment Bldg Integrated Leak Rate Test (Preoperational), Conducted 840110-18 ML20093D3811983-12-30030 December 1983 Nuclear Safety-Related Diaphragm Valves Item 5B-473 Frequency Rept ML20093D3491983-10-14014 October 1983 Itt Grinnell Seismic Qualification Documents ML20093D3601983-09-30030 September 1983 Rev 1 to Seismic Calculations for ASME Section Iii,Class 2 Valves ML20054L1461981-11-30030 November 1981 Duke Power Co Nuclear Station Post-Accident Liquid Sampling Sys Sampling & Control Panels Functional Testing Rept,Nov 1981 ML20093D4061980-09-30030 September 1980 Static Deflection Test 4 Inch Itt Grinnell Diaphragm Valve W/14NAT1 Rotork for Duke Power ML20093D4481979-04-0909 April 1979 Rev a to Seismic Analysis of 4 Inch,150 Lb Carbon Steel Motor Operator Gate Valve ML20101P6431977-09-30030 September 1977 Pressure Mitigating Sys Transient Analysis Results, Suppl to Jul 1977 Rept 1996-04-10
[Table view] |
Text
.
g .. 4 n
, Duke 1%unt Company (194)3f3 401I
- a. Nuclear l'roduction Department 140 Ikt1007
(%rlotte. NC 282011007
, DUKE POWER November 15, 1990 U. S. Nucicar Regulatory Commission :
ATTN: Document Control Desk Washington, D.C. 20555 <
Subject:
Catawba Nuclear Station, Unit 2 >
Docket No. 50-414
-Sixteenth Quarterly Update to Startup Report ;
Gentlemen:
In accordance with Section 6.9.1.3 of the Catawba Nuclear Station Technical-Specifications, please find attached the sixteenth quarterly update to the Unit 2 Startup Report. As indicated in my August 15,51990. letter to NRC, one test is not complete. Additional quarterly updates-to the.Startup-Report will be submitted as required by Technical Specifications.
Very trulv yours, t ,
- , N Q% l M. S. Tuckman, Vice President Nuclear Operations MHil-6/lcs Attachment --
xc: Mr. S. D. Ebneter Regional Administrator, RII U. S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30301 Mr. W. T. Orders NRC Resident Inspector !
Catawba Nuclear Station 9011290061 901107 PDR ADOCK 05000414 P PDC .
A 3
/ ,
a
. J
, t r
STARTUP REPORT QUARTERLY UPDATE CATAWBA UNIT 2 CYCLE 1 NOVEMBER 7, 1990 ,
TESTING COMPLETED DURING OUARTER, l
Nono.
1 STATUS OF TESTING NOT COMP!& R STEADY STATE PIPING SYSTEMS OPERATIONAL VIBRATION MEASUREMFN1' - !
TP/2/A/1200/21 (
t This test was described in Sections 10.5 and 11.5 in the Startup Report.. It }
is complete except for retesting of piping associated with the Diesel ,
Generator Fuol Oil and Lube Oil systems. Additional restraints were- >
installed during the E00-1 refr.111ng outage. However, further modifications were found to be necessary. These modifications have been completed arui ,
testing performed on both. diesels. However. . a new concern has been ;
identified by Design Engineering regarding a rigid pipe connected to the l flexible piping. Design Engineering is currently evaluating the need for ;
additional restraints. i
- i i
1 h
F i
i
.