ML20210V14923 July 1997Rev 6 to Security Personnel Training & Qualification PlanContraband
Safeguards Contingency Plan
ML20149H98527 December 1994Proposed Tech Specs,Requesting Relocation of Turbine Rotor Insp Requirement to Hbrsep Ufsar,Section 10.2
ML20044G61311 May 1993Rev 5 to Design Guide DG-II.20, Design Guide for Civil/Structural Operability Reviews.Safe Shutdown
Probabilistic Risk Assessment
Operability Determination
Operability Assessment
ML20116D29631 August 1992Rev 2 to Nuclear Generation Group Manual 305-05, Prioritization ProcessProbabilistic Risk Assessment
Earthquake
ML20044G61431 July 1992Rev 0 to 92C1737A, Recommended Operability Review Criteria for Piping Sys Subj to Level D Svc Loadings for Carolina Power & Light Nuclear Stations.
ML20101G63118 June 1992Proposed Tss,Adding LCO & Surveillance Requirements for Pressurizer Porvs,Per Generic Ltr 92-06Hydrostatic
ML20090A45230 July 1991Rev 7 to Hb Robinson Steam Electric Plant,Unit 2 OdcmProcess Control Program
ML20236B5056 October 1987Plan for Annual Emergency Exercise at Hb Robinson Nuclear Power Plant - 871006
ML20238A50717 August 1987Proposed Tech Specs Changing Expiration Date to 100731
ML20214K17013 August 1986Proposed Changes to Tech Specs,Deleting Tech Spec 5.3.1.6 Re Amount of Enriched Fissionable Matl Allowed Onsite for Neutron Flux Monitoring Purposes
ML20209B9786 March 1986Rev 2 to Offsite Dose Calculation ManualGrab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
ML20151R79010 January 1986Rev 2 to Hb Robinson Unit 2,Cycle 11 SarBoric Acid
Shutdown Margin
Loss of condenser vacuum
ML20209B97120 November 1985Rev 1 to Offsite Dose Calculation ManualGrab sample
Offsite Dose Calculation Manual
ML14190A90713 November 1985Proposed Tech Specs Deleting Requirements Re Maint of Highly Borated Water Inventory in Boron Injection Tank & Associated Heat Tracing Required to Maintain High Boron Concentration in Solution,Per Generic Ltr 85-16Boric Acid
Power change
Affidavit
ML20087M93418 January 1984Public Version of Rev 3 to Emergency Plan Implementing Procedure PEP-105, Emergency Control - General Emergency & Jm Felton 840322 Release Memo
ML20079K82013 December 1983Public Version of Revised Emergency Plan Implementing Procedures PEP-102, Emergency Control - Unusual Event, PEP-103, Emergency Control - Alert & PEP-104, Emergency Controls - Site Emergency
ML20081B91831 October 1983Proposed Radiological Effluent Tech Specs,Incorporating Requirements to Perform Audits of Emergency Preparedness Program & Security PlanBoric Acid
Shutdown Margin
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Fuel cladding
Fire Protection Program
Power change
Operational leakage
ML20083H8686 October 1983Public Version of Revised Emergency Plan & Procedures, Including Procedures PEP-001 Re introduction,PEP-351 Re Confirmation of Offsite Dose Projections & PEP-105 Re Emergency Control - General EmergencyMet Tower
Fuel cladding
Accidental discharge
ML20077B97014 June 1983Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures PEP-2.3 Re Emergency Control - alert,PEP-2.5 Re Emergency Control - General Emergency & PEP-2.6.21 Re Emergency Communication
ML20076K4512 November 1982Public Version of Corporate Emergency Plan Implementation Procedures,Including Procedures CEPIP-2 Re Emergency Response Team Transportation & CEPIP-3 Re Emergency Response ManagerSafe Shutdown
Health Physics Network
Minimum staff
ML20063M41629 July 1982Public Version of Revision 0 to Emergency Plan & Procedure PEP-2.6.20, Dose Projection Coordinator. Revision 6 to Emergency Plan & Procedures,Vol 13,table of Contents,EnclMet Tower
ML20063D3952 July 1982Public Version of Revised Emergency Plan Procedures, Including Procedures PEP-2.1 Re Initial Emergency Actions, PEP-2.2 Re Emergency Control - Unusual Event & PEP-2.3 Re Emergency Control - Alert
ML20054M35124 May 1982Public Version of Revised Emergency Plan Procedures, Including Revision 3 to Procedure PEP-2.6.4 Re Radiological Control Director & Revision 4 to PEP-3.3.1 Re in-plant Monitoring & Surveys
ML20049J22820 February 1982Public Version of Revision 4 to Emergency Plan & Procedures Vol 13,consisting of Plant Operating Manual Vol 13,Book 2High Radiation Area
ML20039F39411 December 1981Public Version of Revision 3 to Emergency Plan Procedures, Vol 13,including Procedures 3.4.1 Re Initial Dose projections,3.4.2 Re Whole Body Dose Projections & 3.4.3 Re Thyroid Dose ProjectionsMet Tower
Fuel cladding
Accidental discharge
ML20039A90623 November 1981Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 2.3 Re Emergency Control - alert,2.6.2 Re Emergency Repair Director & 3.4.1 Re Initial Dose Projections
ML20038A57229 October 1981Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures PEP-2.6.16 Re Emergency Response manager,PEP-2.6.18 Re Technical Analysis & PEP-2.6.19 Re Radiological Control ManagerSafe Shutdown
Mission time
Anticipated operational occurrence
Met Tower
Earthquake
Fuel cladding
Accidental discharge
Fatality
ML19354C3913 December 1980Proposed Revisions to Tech Specs Reflecting Changes & Additions to Plant as Result of NRC Required Fire Protection Sys ModsBoric Acid
Shutdown Margin
Fire Barrier
Continuous fire watch
Fire Protection Program
Fire Watch
Operational leakage
ML19345B9931 December 1980Proposed Tech Specs 5.4 for Spent Fuel StorageEarthquake
ML19294B30410 January 1980Corrected Page 4.1-10 of Tech Specs.Restores Item 16 Inadvertently Omitted When NRC Issued 791105 Anend 45 to DPR-23
ML19210C4147 November 1979Amend to Tech Specs 6.0-6.8,reflecting Corporate Reorganization of Generation Dept
ML19254E24026 October 1979Cycle 7 Startup Physics Test Results.
ML20085D2921 December 1972Steam Generator Pressure TestShutdown Margin