Issue date | Title | Topic | |
---|---|---|---|
ML20210G926 | 20 July 1999 | Proposed Tech Spec 3.2.1.i,revising Senior Reactor License Requirement for Operations Manager | |
ML20211H614 | 17 January 1999 | Rev 8 to Security Force Training & Qualification Plan, for Indian Point 3 Nuclear Power Plant | Contraband Job Performance Measure |
ML20248L989 | 18 May 1998 | Rev 7 to, Security Force Training & Qualification Plan | Contraband Job Performance Measure |
ML20057E224 | 29 September 1993 | Proposed Tech Specs,Revising Frequency of Radioactive Effluent Release Rept from Semiannual to Annual | |
ML20057E260 | 29 September 1993 | Proposed Tech Specs,Clarifying Administrative Controls of High Radiation Area Keys | High Radiation Area |
ML20056A720 | 27 July 1990 | Proposed Tech Spec Page 3.10-9 | |
ML20043J001 | 21 June 1990 | Proposed Tech Specs Changes Re Removal of cycle-specific Parameter Limits,Per Generic Ltr 88-16 | Shutdown Margin High Radiation Area Fire Protection Program |
ML20248B283 | 8 September 1989 | Cycle 7 Startup Physics Test Rept,Indian Point Unit 3 | |
ML20245F844 | 25 July 1989 | Proposed License Conditions D & H,Reflecting Changes,Per Rev 10 to Physical Security Plan | Safe Shutdown Boric Acid |
ML20195H636 | 30 June 1988 | Proposed Tech Specs,Deleting Figures 3.1 & 3.2 from Unit 1 Tech Specs & Figures 6.2.1 & 6.2.2 from Unit 2 Tech Specs Per Guidance of Generic Ltr 88-06 | Safe Shutdown Shutdown Margin |
ML20246H987 | 30 April 1988 | Environ Qualification of Continental Wire & Cable Corp Instrumentation Cable Installed in Beaver Valley Power Station Unit 1 | |
ML20151P136 | 15 April 1988 | Proposed Tech Specs Figures 3.1,3.2,6.2.1 & 6.2.2 Reflecting Administrative Changes to Organization Charts | Fire Protection Program |
ML20236G490 | 27 July 1987 | Proposed Tech Specs,Deleting Section 3.2.6 & Adding Sections 4.1.7 & 4.1.8 Re Radiation Protection Requirements. Supporting Documentation Encl | High Radiation Area Locked High Radiation Area |
ML20207S284 | 13 March 1987 | Revised Emergency Plan Implementing Procedures,Including Rev 3 to IP-1028, Core Damage Assessment, Rev 6 to IP-1041, Personnel Monitoring for Eof,Tsc.Osc & Control Room Personnel & Rev 12 to IP-1050, Accountability | Reactor Vessel Water Level Fuel cladding Siren |
ML20207H186 | 23 December 1986 | Revised Emergency Plan Implementing Procedures,Including Rev 14 to IP-1021, Radiological Medical Emergency & Rev 4 to IP-1056, Directing Fire Fighting Personnel in Controlled Area | Earthquake |
ML20215A080 | 26 November 1986 | Proposed Tech Specs,Incorporating Changes in Facility Organization Structure & Title Changes for Members of Station Nuclear Safety Committee | |
ML20210P520 | 22 September 1986 | Revised Emergency Plan Implementing Procedure IP-1050, Accountability | |
ML20203P020 | 30 April 1986 | Proposed Tech Specs,Incorporating Anticipatory Reactor Trip on Turbine Trip | Safe Shutdown Boric Acid Fire Protection Program |
ML20149D485 | 5 March 1986 | Rev 3 to Offsite Dose Calculation Manual | Offsite Dose Calculation Manual Process Control Program |
ML20205K338 | 20 February 1986 | Rev 15 to Book II of Emergency Plan Procedures,Including Table of Contents & Rev 4 to IP-1017 Re Recommendation of Protective Actions for Offsite Population | Met Tower Earthquake |
ML20141G794 | 19 December 1985 | Proposed Tech Specs,Ensuring Requirements for Radiation Protection Program Uniform for Units 1 & 2 | High Radiation Area |
ML20127E648 | 30 June 1985 | Proposed Tech Specs Incorporating Administrative Changes to Facility Organization & Limiting Unit 2 Overtime for Critical Shift Job Positions | Safe Shutdown High Radiation Area Offsite Dose Calculation Manual Process Control Program Safeguards Contingency Plan Fire Protection Program |
ML20129F161 | 28 May 1985 | Public Version of Revised Emergency Plan Procedures, Including Rev 12 to Procedure IP-1030, Emergency Notification,Communication & Staffing & Rev 0 to Procedure IP-1052, Hazardous Waste Emergency | Health Physics Network Grab sample Earthquake |
ML20127G305 | 25 March 1985 | Annual Drill Scenario | |
ML20100K218 | 20 March 1985 | Revised Emergency Plan Implementing Procedures,Including Rev 6 to IP-1001 Re Determining Magnitude of Release,Rev 5 to IP-1003 Re Obtaining Meterological Data & Rev 4 to IP-1004 Re Midas Computer Sys | Safe Shutdown Health Physics Network Reactor Vessel Water Level Grab sample Met Tower Design basis earthquake Earthquake Fuel cladding Siren Overexposure Overdose |
ML20084N241 | 16 May 1984 | Rev 0 to Drill Scenario 4B | Fuel cladding |
ML20083J703 | 12 December 1983 | Public Version of Revised Emergency Plan Implementing Procedures IP-1002 Re Determination of Release Magnitude, IP-1011 Re Offsite Monitoring & IP-1028 Re Core Damage Assessment | Earthquake |
ML20081L978 | 28 October 1983 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures IP-1011 Re Offsite monitoring,IP-1021 Re Radiological Medical Emergency & IP-1047 Re Operations Support Ctr | Safe Shutdown Grab sample Earthquake Minimum staff |
ML20080D295 | 4 August 1983 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures IP-1010 Re in-plant/site Perimeter Surveys & IP-1025 Re Repair & Corrective Action Teams | Earthquake |
ML20077H577 | 15 July 1983 | Public Version of Page 11 to Emergency Plan Procedure IP-1030, Emergency Notification & Communication Staffing & Rev 8 to Procedure IP-1070, Periodic Check of Emergency Preparedness Equipment | |
ML20072K844 | 27 May 1983 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures IP-1002 Re Determination of Magnitude of release,IP-1011 Re Offsite Monitoring & IP-1047 Re Operations Support Ctr | |
ML20074A503 | 2 May 1983 | Rev 2 to Procedure SOP-SG-2, Secondary Plant Chemistry Control | Boric Acid |
ML20070L929 | 27 December 1982 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures IP-1021 Re Radiological Medical Emergency & IP-1030 Re Emergency Notification, Communication & Staffing | Grab sample Earthquake Minimum staff |
ML20065U358 | 5 October 1982 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures IP-1010 Re in-plant/onsite Perimeter Surveys & IP-1030 Re Emergency Notification, Communication & Staffing | Grab sample Minimum staff |
ML20062K685 | 29 July 1982 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures IP-1003 Re Obtaining Meteorological Data & 1004 Re Midas Computer Sys - Dose Assessment Models.Revision 13 to Index Encl | Earthquake |
ML20050D490 | 16 March 1982 | Public Version of Revised Emergency Plan Procedures, Consisting of Revision 4 to Procedures Book II Re Initiating Conditions & Revision 3 to Procedure IP-1058 Re Earthquake Emergency.Revised Index Encl | Earthquake |
ML100271832 | 4 February 1982 | Investigation of Relative Deterioration Temps & Hydrogen Chloride Evolution of Chlorinated Jacket Compounds by Means of Thermal Gravimetric Analysis & Differential Thermal Analysis. | |
ML20040F913 | 22 January 1982 | Public Version of Revised Emergency Plan Implementing Procedures,Including Page Changes to Procedures IP-1017, IP-1040 & IP-1056 & Table of Initiating Conditions & Emergency Action Levels | |
ML20040E055 | 18 January 1982 | Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures IP-1003 Re Obtaining Meteorological Data & IP-1011 Re Offsite Monitoring Team.One Oversize Drawing Encl.Aperture Card Available in PDR | Health Physics Network High Radiation Area Earthquake Minimum staff |
ML100271823 | 7 July 1981 | Analysis & Rept on Safety-Related Electrical Penetrations for Indian Point Plant 3. | Boric Acid |
ML100271829 | 2 June 1981 | LOCA Testing of Low Voltage Conductor Seal. | |
ML100271821 | 16 April 1981 | Ozone Resisting Silicone Rubber Cable Tests for Con Ed. | |
ML19347D445 | 31 March 1981 | Steam Generator Insp Program & Results,1980/1981 Refueling & Maint Outage. | Flow Induced Vibration |
ML19323B867 | 5 May 1980 | Proposed Tech Spec Change to Section 4.13 Re Containment Vent & Purge Sys & 3.8 for Refueling,Fuel Handling & Storage.Safety Evaluation Encl | Shutdown Margin High Radiation Area Control of Heavy Loads Fire Protection Program |
ML19211C755 | 4 January 1980 | Proposed Changes to Tech Specs Section 3.4 Requiring Operability of All Three Auxiliary Feedwater Pumps During Power Operations.Util Safety Evaluation Encl | Turbine Missile Fire Protection Program |
ML19209B594 | 2 October 1979 | Proposed Tech Spec Changes to License DPR-64,consisting of Changes to Mgt Organization Charts & Position Titles.Safety Evaluation Encl | Fire Protection Program |
ML19305A735 | 28 September 1979 | Proposed Page 44 to ETS Re Mgt Titles | |
ML100260591 | 28 September 1979 | Proposed Pages 247,251-253 & 259 to Tech Specs Re Mgt Titles | Safe Shutdown Earthquake Probabilistic Risk Assessment Earthquake Power Operated Valves Fuel cladding Fire Protection Program |
ML19269D192 | 28 February 1979 | Inservice Testing & Insp Program, Suppl 3 | Safe Shutdown Boric Acid High Radiation Area Stroke time Hydrostatic Nondestructive Examination Dissimilar Metal Weld |
ML19259A599 | 3 January 1979 | Tech Specs Page Revisions to License DPR-26 Re Accumulator Water Volume & New Limit for Total Nuclear Peaking Factor. W/Encl Safety Evaluation |