Issue date | Title | Topic | |
---|---|---|---|
ML23356A003 | 17 January 2024 | Issuance of Amendments Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) | Pressure and Temperature Limits Report |
ML23215A167 | 15 December 2023 | Acceptance of Requested Licensing Action Amendment Request to Revise Surveillance Requirement 3.8.1.2 Note 3 | |
ML23248A209 | 18 September 2023 | Proposed Alternative VR-11 to the Requirements of the ASME OM Code Associated with Periodic Verification Testing of MO-2397, Reactor Water Cleanup Inboard Isolation Valve | Incorporated by reference Locked High Radiation Area Scaffolding |
ML23115A407 | 26 April 2023 | Correction of License Amendment Nos. 226 and 214 Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B | Surveillance Frequency Control Program |
ML23107A285 | 25 April 2023 | Authorization and Safety Evaluation for Alternative Request PR-08 | Incorporated by reference Grace period |
ML23079A074 | 11 April 2023 | Request RR-003 to Use Later Edition of ASME Section XI Code for ISI Code of Record | Incorporated by reference |
ML22357A100 | 31 March 2023 | and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendments Standard Emergency Plan and Consolidated Emergency Operations Facility | Safe Shutdown Health Physics Network High winds Minimum staff Fire Protection Program Siren |
ML23012A156 | 13 January 2023 | Issuance of Amendment No. 210 Re Revised Methodologies for Determining the Core Operating Limits (EPID L-2021-LLA-0144) - Non-proprietary | Shutdown Margin Anticipated operational occurrence Feedwater Controller Failure Time Critical Operator Action Power change |
ML22318A215 | 27 December 2022 | Issuance of Amendment No. 209 Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank | Anticipated operational occurrence Temporary Modification Cyber Security Qualified Offsite Circuit Aging Management Surveillance Frequency Control Program |
ML22300A223 | 1 November 2022 | Issuance of Amendments 241 and 229 TSTF-577 Revised Frequencies for Steam Generator Tube Inspections | Nondestructive Examination |
ML22264A106 | 31 October 2022 | Issuance of Amendment No. 208 Residual Heat Removal Drywell Spray Header and Nozzle Surveillance Frequency | Ultimate heat sink Foreign Material Exclusion |
ML22270A325 | 30 September 2022 | (Prairie Island), Unit 2 - Authorization and Safety Evaluation for Alternative Request No. RR-08 | Incorporated by reference |
ML22270A231 | 30 September 2022 | Authorization and Safety Evaluation for Alternative Request No. VR-10 | Incorporated by reference Surveillance Frequency Control Program |
ML22181A000 | 17 August 2022 | Issuance of Amendments Reactor Trip System Power Range Instrumentation Channels | Surveillance Frequency Control Program |
ML22166A389 | 28 July 2022 | Issuance of Amendments 239 and 227 24-Month Operating Cycle | Safe Shutdown Offsite Dose Calculation Manual Surveillance Frequency Control Program Maintenance Rule Program Grace period |
ML22154A550 | 7 June 2022 | Authorization and Safety Evaluation for Alternative Request No. PR-02 | |
ML22126A134 | 12 May 2022 | Authorization and Safety Evaluation for Alternative Request No. PR-05 | |
ML22098A127 | 2 May 2022 | Authorization and Safety Evaluation for Alternative Request No. VR-02 | Stroke time |
ML22061A206 | 1 April 2022 | Issuance of Amendments TSTF-471, Rev. 1, TSTF-571-T, and Administrative Changes to Technical Specification Section 5.0 | Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Hydrostatic Nondestructive Examination Pressure and Temperature Limits Report Surveillance Frequency Control Program Safeguards Contingency Plan Deep Dose Equivalent Power Uprate |
ML22018A177 | 21 January 2022 | Authorization and Safety Evaluation for Alternative Request No. VR-05 | |
ML21312A021 | 23 November 2021 | Issuance of Amendment Nos. 237 and 225 Inoperable Cooling Water System Supply Header | Safe Shutdown |
ML21223A280 | 15 October 2021 | Issuance of Amendment No. 207 Adoption of TSTF-564 Safety Limit MCPR | Reactor Vessel Water Level Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radiological Environmental Operating Report Process Control Program Fuel cladding |
ML21148A274 | 12 July 2021 | Issuance of Amendment No. 206 TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High winds Reactor Vessel Water Level High Radiation Area Ultimate heat sink Tornado Missile Water Inventory Control Internal Flooding Probabilistic Risk Assessment Squib Qualified Offsite Circuit Emergency Lighting FLEX Tornado-Generated Missile Fukushima Dai-Ichi Seismically rugged Surveillance Frequency Control Program Scram Discharge Volume Large early release frequency MELLLA Flooding Focused Evaluation Maintenance Rule Program Offsite Circuit |
ML21008A001 | 19 March 2021 | Issuance of Amendment Nos. 236 and 224 Low Temperature Overpressure Protection | |
ML20346A020 | 15 March 2021 | Issuance of Amendment Nos. 235 and 223, Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High winds High Radiation Area Mission time Fire Barrier Internal Flooding Probabilistic Risk Assessment FLEX Surveillance Frequency Control Program Large early release frequency Earthquake Maintenance Rule Program Offsite Circuit Backfit |
ML20356A002 | 5 February 2021 | Issuance of Amendment Nos. 234 and 222, Revise Technical Specifications 3.2.1 and 5.6.5 Identified in Westinghouse Nuclear Safety Advisory Letters NSAL-09-05, Revision 1, and NSAL-15-1 | Surveillance Frequency Control Program |
ML20352A349 | 8 January 2021 | Issuance of Amendment No. 205, Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-582, RPV WIC Enhancements, and TSTF-583-T, TSTF-582 Diesel Generator Variation | High Radiation Area Water Inventory Control Surveillance Frequency Control Program Fuel cladding Offsite Circuit |
ML20346A097 | 21 December 2020 | Request for Alternative for Examination of Reactor Pressure Vessel Threads in Flange | |
ML20336A160 | 9 December 2020 | Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
ML20283A342 | 18 November 2020 | Issuance of Amendment Nos. 233 and 221 Adoption of Technical Specifications Task Force Traveler TSTF-547, Clarification of Rod Position Requirements | Shutdown Margin Surveillance Frequency Control Program |
ML20307A017 | 2 November 2020 | Request for Alternative for Core Support Structure Weld Examination | Incorporated by reference |
ML20217L185 | 2 October 2020 | Issuance of Amendment Nos. 232 and 220 Increase the Integrated Leak Rate Test Program Type a and Type C Test Frequency | Internal Flooding Probabilistic Risk Assessment Coatings Large early release frequency Moisture barrier Maintenance Rule Program Grace period |
ML20276A003 | 2 October 2020 | Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
ML20210M014 | 8 September 2020 | and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Nos. 204, 231, and 219 TSTF-529 Clarify Use and Application Rules | Time of Discovery |
ML20230A051 | 3 September 2020 | Reactor Vessel Material Surveillance Capsule Withdrawal Schedules | |
ML20153A804 | 31 July 2020 | Co. - Issuance of Amendments Revising Emergency Action RA3 | |
ML20174A545 | 15 July 2020 | Request for Alternative for Pressure Isolation Valve Testing | Incorporated by reference |
ML20153A401 | 1 June 2020 | and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME Code | Liquid penetrant |
ML20135G992 | 29 May 2020 | and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME Code | Liquid penetrant |
ML20134H958 | 29 May 2020 | and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Relief from the Requirements of the ASME Code | Weld Overlay Liquid penetrant |
ML19276F684 | 12 November 2019 | Issuance of Amendments 230 and 218 Issuance of Amendments Adoption of 10 CFR 50.69 - Risk Informed Caterization and Treatment of Structure, Systems and Components of Nuclear Power Reactors | Safe Shutdown High winds Internal Flooding Probabilistic Risk Assessment FLEX Large early release frequency Earthquake |
ML19232A151 | 7 November 2019 | Issuance of Amendments Modifying the Design Basis for Quality Classification of Certain Fuel Handling Equipment | Safe Shutdown Design basis earthquake Earthquake Fuel cladding |
ML19255F582 | 1 October 2019 | Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4376; EPID No. L-2014-JLD-0052) | Ultimate heat sink Tornado Missile FLEX Fukushima Dai-Ichi Design basis earthquake Spent Fuel Pool Instrumentation Severe Accident Management Guideline Battery sizing Earthquake Hardened vent GOTHIC |
ML19140A447 | 30 July 2019 | Issuance of Amendments Revision to National Fire Protection Association (NFPA) Standard NFPA 805 Modifications | Mission time Probabilistic Risk Assessment Multiple Spurious Operation Fire Protection Program Very Early Warning Fire Detection |
ML19162A093 | 30 July 2019 | Issuance of Amendment No, 202 Regarding Deletion of the Note Associated with Technical Specification 3.5.1., Erccs - Operating | Water Inventory Control |
ML19177A380 | 3 July 2019 | Reactor Vessel Material Surveillance Capsule Withdrawal Schedules | |
ML19128A133 | 6 June 2019 | Issuance of Amendments TSTF-439 Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO | Time of Discovery Surveillance Frequency Control Program |
ML19074A269 | 22 April 2019 | Non-Proprietary - Issuance of Amendment Revision to Technical Specifications 2.1.2 Safety Limit Minimum Critical Power Ratio | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Fuel cladding |
ML19045A480 | 16 April 2019 | Issuance of Amendment Nos. 226 and 214 Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B | High winds Shutdown Margin High Radiation Area Internal Flooding Hydrostatic Probabilistic Risk Assessment Surveillance Frequency Control Program Large early release frequency Backfit Power change |
ML19052A142 | 11 March 2019 | Correction to License Amendment No. 198 Related to Adoption of TSTF-542, Reactor Pressure Vessel Water Inventory Control | Reactor Vessel Water Level Water Inventory Control |