MONTHYEARRA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-23-0320, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency2023-12-14014 December 2023 Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0182, Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency2023-11-16016 November 2023 Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0304, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0)2023-11-14014 November 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0) RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0275, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-10-12012 October 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0268, Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan2023-09-29029 September 2023 Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan RA-23-0234, Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS)2023-09-28028 September 2023 Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS) RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-23-0228, Registration for Use of General License Spent Fuel Cask Number 1752023-09-14014 September 2023 Registration for Use of General License Spent Fuel Cask Number 175 RA-23-0223, Registration for Use of General License Spent Fuel Cask Numbers 173 and 1742023-08-23023 August 2023 Registration for Use of General License Spent Fuel Cask Numbers 173 and 174 RA-23-0222, On-Shift Staffing Analysis (Ossa), Revision 12023-08-23023 August 2023 On-Shift Staffing Analysis (Ossa), Revision 1 RA-23-0211, Reply to a Notice of Violation (NOV) 05000270/2023010-022023-08-17017 August 2023 Reply to a Notice of Violation (NOV) 05000270/2023010-02 RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0186, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3)2023-07-18018 July 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3) RA-23-0184, Registration for Use of General License Spent Fuel Cask Numbers 171 and 1722023-07-10010 July 2023 Registration for Use of General License Spent Fuel Cask Numbers 171 and 172 RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0146, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-06-20020 June 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations RA-23-0128, Refuel 32 (O1R32) Steam Generator Tube Inspection Report2023-05-18018 May 2023 Refuel 32 (O1R32) Steam Generator Tube Inspection Report RA-23-0018, Relief Request (RA-23-0018) to Utilize Code Case N-853 PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress Corrosion Cracking Section XI, Division 12023-05-0404 May 2023 Relief Request (RA-23-0018) to Utilize Code Case N-853 PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material Susceptible to Primary Water Stress Corrosion Cracking Section XI, Division 1 RA-23-0111, Withdrawal of License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-04-27027 April 2023 Withdrawal of License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RA-23-0104, Response to Request for Additional Information (RAI) Regarding Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report2023-04-26026 April 2023 Response to Request for Additional Information (RAI) Regarding Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 20222023-04-26026 April 2023 Duke Energy Annual Radiological Environmental Operating Report - 2022 RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.462023-04-26026 April 2023 Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 RA-23-0099, Subsequent License Renewal Application Second Annual Amendment to the License Renewal Application2023-04-25025 April 2023 Subsequent License Renewal Application Second Annual Amendment to the License Renewal Application RA-23-0046, Annual Radioactive Effluent Release Report - 20222023-04-24024 April 2023 Annual Radioactive Effluent Release Report - 2022 RA-22-0292, License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-04-0404 April 2023 License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RA-23-0036, Biennial Decommissioning Financial Assurance Reports2023-03-30030 March 2023 Biennial Decommissioning Financial Assurance Reports RA-23-0040, Onsite Property Insurance Coverage2023-03-30030 March 2023 Onsite Property Insurance Coverage RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2023-03-30030 March 2023 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-23-0037, Duke Energy - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis)2023-03-30030 March 2023 Duke Energy - Decommissioning Funding Plan for Independent Spent Fuel Storage Installations (Isfsis) RA-23-0051, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities2023-03-0909 March 2023 Response to Request for Additional Information (RAI) Regarding Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities RA-23-0052, Refuel 32 (O1R32) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval2023-02-22022 February 2023 Refuel 32 (O1R32) Inservice Inspection (ISI) Report, Fifth 10-Year ISI Interval RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-02-17017 February 2023 Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI2023-02-0202 February 2023 Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-22-0256, Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-01-23023 January 2023 Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab2022-12-0505 December 2022 Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab RA-22-0334, Refuel 31 (O3R31) Steam Generator Tube Inspection Report2022-11-21021 November 2022 Refuel 31 (O3R31) Steam Generator Tube Inspection Report RA-22-0329, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 1 Cycle 33 (Revision 0 and Revision 1)2022-11-11011 November 2022 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 1 Cycle 33 (Revision 0 and Revision 1) RA-22-0285, Subsequent License Renewal - Appendix E Environmental Report Supplement 22022-11-0707 November 2022 Subsequent License Renewal - Appendix E Environmental Report Supplement 2 RA-22-0313, Emergency Action Level (EAL) Technical Basis Document, Revision 4, EAL Wallchart, Revision 3 and Alternate TSC and OSC Renovations2022-10-27027 October 2022 Emergency Action Level (EAL) Technical Basis Document, Revision 4, EAL Wallchart, Revision 3 and Alternate TSC and OSC Renovations RA-22-0270, Response to Request for Additional Information Regarding License Amendment Request to Address Technical Specifications Mode Change Limitations2022-10-0707 October 2022 Response to Request for Additional Information Regarding License Amendment Request to Address Technical Specifications Mode Change Limitations RA-22-0192, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4a2022-09-0202 September 2022 Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4a 2024-01-08
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRA-23-0275, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-10-12012 October 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0146, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-06-20020 June 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0104, Response to Request for Additional Information (RAI) Regarding Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report2023-04-26026 April 2023 Response to Request for Additional Information (RAI) Regarding Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report RA-23-0051, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities2023-03-0909 March 2023 Response to Request for Additional Information (RAI) Regarding Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities RA-22-0270, Response to Request for Additional Information Regarding License Amendment Request to Address Technical Specifications Mode Change Limitations2022-10-0707 October 2022 Response to Request for Additional Information Regarding License Amendment Request to Address Technical Specifications Mode Change Limitations RA-22-0192, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4a2022-09-0202 September 2022 Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4a RA-22-0160, Subsequent License Renewal Application: Responses to ONS SLRA - Second Round RAIs - Trp 76 (Irradiation Structural) - FE 3.5.2.2.2.62022-07-25025 July 2022 Subsequent License Renewal Application: Responses to ONS SLRA - Second Round RAIs - Trp 76 (Irradiation Structural) - FE 3.5.2.2.2.6 RA-22-0193, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4b2022-07-0808 July 2022 Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4b RA-22-0158, Subsequent License Renewal Application - Response to ONS SLRA Second Round RAI B2.1.9-2a2022-06-0808 June 2022 Subsequent License Renewal Application - Response to ONS SLRA Second Round RAI B2.1.9-2a RA-22-0159, Subsequent License Renewal Application Response to ONS SLRA Request for Additional Information (RAI) 3.1.2-12022-05-27027 May 2022 Subsequent License Renewal Application Response to ONS SLRA Request for Additional Information (RAI) 3.1.2-1 RA-22-0137, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI 4.6.1-1a2022-05-20020 May 2022 Subsequent License Renewal Application Response to ONS SLRA Second Round RAI 4.6.1-1a RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility2022-05-13013 May 2022 Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility RA-22-0145, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - RAI 3.5.2.2.2.6-L2022-05-11011 May 2022 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - RAI 3.5.2.2.2.6-L RA-22-0124, Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 42022-04-22022 April 2022 Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 4 RA-22-0129, Subsequent License Renewal Application, Response to ONS SLRA 2nd Round RAI B4.1-32022-04-20020 April 2022 Subsequent License Renewal Application, Response to ONS SLRA 2nd Round RAI B4.1-3 RA-22-0089, Response to Request for Additional Information Regarding Application to Revise Technical Specification 3.7.7, Low Pressure Service Water System, to Extend the Completion Time for One Required Inoperable LPSW2022-04-14014 April 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specification 3.7.7, Low Pressure Service Water System, to Extend the Completion Time for One Required Inoperable LPSW RA-22-0111, Subsequent License Renewal Application, Follow-up Request for Additional Information Set 2 and 3 Updates2022-03-31031 March 2022 Subsequent License Renewal Application, Follow-up Request for Additional Information Set 2 and 3 Updates RA-22-0105, Subsequent License Renewal Application - Responses to NRC Requests for Confirmation of Information - Set 42022-03-22022 March 2022 Subsequent License Renewal Application - Responses to NRC Requests for Confirmation of Information - Set 4 ML22075A2032022-03-11011 March 2022 Email from Duke to NRC - Follow-Up Items from March 7, 2022 Public Meeting ML22074A0022022-03-11011 March 2022 Email from Duke to NRC - Follow-up Item from March 7, 2022 Public Meeting - SSW Tendon AMP RA-22-0040, Subsequent License Renewal Application: Responses to NRC Request for Additional Information Set 32022-02-21021 February 2022 Subsequent License Renewal Application: Responses to NRC Request for Additional Information Set 3 RA-22-0023, Subsequent License Renewal Application - Response to NRC Requests for Confirmation of Information - Set 32022-01-21021 January 2022 Subsequent License Renewal Application - Response to NRC Requests for Confirmation of Information - Set 3 RA-22-0025, Supplemental Information for Relief Request to Utilize an Alternative Acceptance Criteria for Code Case, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material2022-01-20020 January 2022 Supplemental Information for Relief Request to Utilize an Alternative Acceptance Criteria for Code Case, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material RA-21-0332, Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a2022-01-0707 January 2022 Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a ML22019A1182022-01-0707 January 2022 Enclosures 1,2 & 3: Oconee Nuclear Station, Units 1, 2 & 3, Subsequent License Renewal Application, Appendix E, Environmental Report - Index of Duke Energy'S Responses, Responses to NRC Requests for Confirmation of Information and NRC Reque ML22019A1232022-01-0707 January 2022 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information and Request for Confirmation of Information ML22019A1202022-01-0707 January 2022 Appendix K ML22019A1192022-01-0707 January 2022 Appendix 1-A - Oconee Nuclear Station 122.21(r)(2)-(13) Submittal Requirement Checklist ML22019A1242022-01-0707 January 2022 Attachment 1: Oconee Nuclear Station, Units 1, 2 & 3, Subsequent License Renewal Application, Appendix E - HDR, Inc., 2020 Clean Water Act Documents ML22019A1212022-01-0707 January 2022 Appendix 13-B Peer Reviewer Communication Log ML22019A1222022-01-0707 January 2022 Calculation of Permeability by the Falling Head Method RA-22-0002, Appendix 10-B - Pump and Pipe Selection Calculations for a Hypothetical Cooling Tower Retrofit at Oconee Nuclear Station2022-01-0707 January 2022 Appendix 10-B - Pump and Pipe Selection Calculations for a Hypothetical Cooling Tower Retrofit at Oconee Nuclear Station ML22007A0152022-01-0707 January 2022 Subsequent License Renewal Application, Appendix E Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information RA-21-0325, Response to NRC Requests for Confirmation of Information - Set 22021-12-17017 December 2021 Response to NRC Requests for Confirmation of Information - Set 2 RA-21-0307, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 12021-12-0202 December 2021 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - Set 1 RA-21-0269, Response to Request for Additional Information Regarding Alternative Request to Utilize American Society of Mechanical Engineers (ASME) Code Case OMN-282021-11-0909 November 2021 Response to Request for Additional Information Regarding Alternative Request to Utilize American Society of Mechanical Engineers (ASME) Code Case OMN-28 RA-21-0270, Response to Second Request for Additional Information (RAI) Regarding Relief Request to Utilize an Alternative Acceptance Criteria for Code Case N-8532021-10-28028 October 2021 Response to Second Request for Additional Information (RAI) Regarding Relief Request to Utilize an Alternative Acceptance Criteria for Code Case N-853 RA-21-0242, Response to Request for Additional Information, Regarding Relief Request to Utilize an Alternative Acceptance Criteria for Code Case N-853, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection2021-08-31031 August 2021 Response to Request for Additional Information, Regarding Relief Request to Utilize an Alternative Acceptance Criteria for Code Case N-853, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection RA-21-0219, Response to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Intervals2021-08-0505 August 2021 Response to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Intervals RA-21-0063, 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan2021-03-11011 March 2021 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan RA-21-0032, Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(42021-02-11011 February 2021 Duke Energy - Response to Requests for Additional Info for Request to Use a Provision of Later Edition & Addenda of the ASME Boiler & Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)( RA-20-0267, Proposed License Amendment Request to Revise Oconee Nuclear Station Current Licensing Basis for High Energy Line Breaks Outside of Containment Building - Responses to Request for Additional Information2020-09-17017 September 2020 Proposed License Amendment Request to Revise Oconee Nuclear Station Current Licensing Basis for High Energy Line Breaks Outside of Containment Building - Responses to Request for Additional Information RA-19-0281, Response to NRC Request for Additional Information for the Fall 2018 Oconee Unit 1 Steam Generator Tube Rupture Inspection Report (RA-19-0093)2019-07-31031 July 2019 Response to NRC Request for Additional Information for the Fall 2018 Oconee Unit 1 Steam Generator Tube Rupture Inspection Report (RA-19-0093) RA-19-0301, Proposed Amendment to Renewed Facility Operating Licenses Regarding Revisions to Final Safety Analysis Report Sections Associated with Oconee Tornado Licensing Basis -Responses to Request for Additional Information2019-07-31031 July 2019 Proposed Amendment to Renewed Facility Operating Licenses Regarding Revisions to Final Safety Analysis Report Sections Associated with Oconee Tornado Licensing Basis -Responses to Request for Additional Information RA-19-0134, Duke Energy Response to NRC Request for Additional Information (RAI) Related to Oconee License Amendment Request 2018-052019-03-0707 March 2019 Duke Energy Response to NRC Request for Additional Information (RAI) Related to Oconee License Amendment Request 2018-05 RA-19-0116, Duke Energy Response to NRC Request for Additional Information (RAI) Related to Oconee License Amendment Request 2017-052019-02-26026 February 2019 Duke Energy Response to NRC Request for Additional Information (RAI) Related to Oconee License Amendment Request 2017-05 RA-19-0026, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001)2019-02-11011 February 2019 Response to Request for Additional Information (RAI) Regarding Proposed Alternative to the Depth Sizing Qualification Requirement of Appendix Viii, Supplements 2 and 10 (18-GO-001) 2023-07-07
[Table view] |
Text
Cecil Fletcher
( ~ DUKE General Manager (Acting)
ENERGY Nuclear Regulatory Affairs, Policy &
Emergency Preparedness Duke Energy CN03CH l 4800 Concord Rd York, SC 29745 704.382.4534 Cecil.Fletcher@duke-energy.com RA-23-0104 April 26, 2023 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Oconee Nuclear Station, Unit 3 Docket No. 50-287 Renewed License No. DPR-55
Subject:
Response to Request for Additional Information (RAI) Regarding Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report
References:
- 1. Duke Energy letter, Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report, dated November 21, 2022 (ADAMS Accession No. ML22325A362).
- 2. NRC e-mail, Oconee Unit 3 - Request for Additional Information RE: Steam Generator Tube Inspection Report (O3R31) (EPID: L-2022-LRO-0152), dated March 27, 2023 (ADAMS Accession No. ML23086C036).
By letter dated November 21, 2022 (Reference 1), Duke Energy Carolinas, LLC (Duke Energy) submitted the steam generator tube inspection report to the U.S. Nuclear Regulatory Commission (NRC) for Oconee Unit 3, refueling outage 31 (O3R31) in accordance with plant Technical Specifications (TS). Specifically, TS 5.6.8 requires that a report be submitted within 180 days after the initial entry into hot shutdown (i.e., MODE 4) following completion of a steam generator tube inspection performed in accordance with TS 5.5.10. TS 5.5.10 requires that a SG Program be established and implemented to ensure SG tube integrity is maintained.
By electronic mail correspondence dated March 27, 2023 (Reference 2), the NRC staff requested additional information from Duke Energy to complete its review of the O3R31 steam generator tube inspection report.
The enclosure to this letter provides Duke Energys response to the NRC RAI regarding the O3R31 steam generator tube inspection report.
There are no regulatory commitments contained in this submittal.
U.S. Nuclear Regulatory Commission Page 2 RA-23-0104 Please refer any questions regarding this submittal to Ryan Treadway, Director - Nuclear Fleet Licensing, at 980-373-5873.
Sincerely, Cecil Fletcher General Manager (Acting) - Nuclear Regulatory Affairs, Policy & Emergency Preparedness
Enclosure:
Response to NRC Request for Additional Information
U.S. Nuclear Regulatory Commission Page 3 RA-23-0104 cc: (w/ Enclosure)
Ms. Laura Dudes Administrator, Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, GA 30303-1257 Mr. Shawn Williams NRC Project Manager Oconee Nuclear Station Mr. Jared Nadel NRC Senior Resident Inspector Oconee Nuclear Station
U.S. Nuclear Regulatory Commission Enclosure to RA-23-0104 Enclosure Response to NRC Request for Additional Information
[7 pages follow this cover page]
U.S. Nuclear Regulatory Commission Enclosure to RA-23-0104 By letter dated November 21, 2022 (Agencywide Documents Access and Management Systems Accession No. ML22325A362), Duke Energy submitted information summarizing the results of the spring 2022 steam generator (SG) inspections performed at Oconee Nuclear Station, Unit 3.
The inspections were performed during refueling outage (RFO) 31. Technical Specification (TS)
Section 5.5.10 requires that a SG Program be established and implemented to ensure SG tube integrity is maintained. TS Section 5.6.8 requires that a report be submitted within 180 days after the initial entry into hot shutdown (MODE 4) following completion of an inspection of the SGs.
Some information about the classification, tracking, and reporting of tube-to-tube wear indications for the Oconee Unit 3 steam generators is unclear to the U.S. Nuclear Regulatory Commission (NRC) staff. Specifically, The Unit 3 reports from the most recent inspections, 2022 (RFO 31, ML22325A362) and 2018 (RFO 29, ML18235A502), appear to use the code VTW for tube-to-tube wear in the listing of indications. The 2018 report also includes indications classified as HNC, but the 2022 report does not have any indications classified as HNC.
The 2018 and 2022 reports for Unit 3 do not define the abbreviations VTW or HNC, but the staff understands HNC to be an abbreviation for Historical No Change based on Unit 3 and Unit 2 steam generator tube inspection reports.
All tube-to-tube wear indications in the 2021 inspection report for Unit 2 appear to be classified as TTW (Tube-to-Tube Wear), ADI (Absolute Drift Indication), or VTW. The text in the 2021 Unit 2 report describes the meaning of TTW and ADI, but not VTW.
Therefore, to complete its review of the inspection report, the NRC staff requests the following additional information:
- 1. Please clarify whether the HNC code is used as a basis for omitting tube-to-tube wear indications from SG tube inspection reports. The 2018 report for Oconee Unit 3 appears to include tube-to-tube wear indications classified as HNC that were not included in the 2022 report (e.g., SG 3A, tubes R91C51 and R92C51). If indications are excluded based on classification as HNC, please discuss the apparent discepancy with Technical Specification 5.6.8.d, which requires the reporting of the Location, orientation (if linear),
and measured sizes (if available) of service induced indications.
Duke Energy Response to RAI 1 The NRC staff correctly understands the HNC to be an abbreviation for Historical No Change.
The HNC code was used as a basis for omitting historic tube-to-tube wear from the indication list of the SG tube inspection reports. The HNC code tube-to-tube wear indications were discussed in the body of the 2022 Unit 3 SG tube inspection report. The HNC code is used for tracking historical indications that have not changed from their historical (HNC) conditions during the current inspection. Prior to HNC classification, the tube-to-tube wear indications have been reported in the indication list of previous SG tube inspection reports. Duke Energy understands the need for the HNC code associated with service induced indications to be included in the indication list of the SG tube inspection reports. Therefore, attached are the service induced HNC codes that were not included in the O3R31 steam generator tube inspection report.
U.S. Nuclear Regulatory Commission Enclosure to RA-23-0104
- 2. Please define eddy current three-letter Code VTW and discuss the difference between Codes VTW and TTW assigned to tube-to-tube wear indications within the Oconee units.
Duke Energy Response to RAI 2 The VTW (Volumetric Tube Wear) code is an Array reporting code for tube-to-tube wear. The TTW (Tube-to-Tube Wear) code is a Bobbin reporting code used on subsequent inspections after the diagnostic probe has determined the indication is tube-to-tube wear.
SG - 3A Attachment - Service Induced Indications Oconee 3 O3R31 BOCO3 20220501 04/17/2023 12:42:05
+-----------+----+----+---------+----+----+----+-----+----+---------+---------+---------+---------+-------+----+-------+----+----+------+------+------+--+-----+
l INSPDATE ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 UTIL1 UTIL2 CRLEN CEG CRWID BEGT ENDT PDIA PTYPE CAL L IDXl
+-----------+----+----+---------+----+----+----+-----+----+---------+---------+---------+---------+-------+----+-------+----+----+------+------+------+--+-----+
l 2022/05/01 91 51 1.79 94 HNC P8 007 15.55 24.57 CTR 9.02 UTE LTE .510 ZBAHS 50 C 242l l l l 2022/05/01 92 51 1.60 97 HNC P8 007 15.48 23.97 CTR 8.49 UTE LTE .510 ZBAHS 51 C 220l l l l 2022/05/01 91 52 2.20 95 HNC P8 007 15.05 26.30 CTR 11.25 UTE LTE .510 ZBAHS 50 C 226l l l l 2022/05/01 92 54 .52 106 HNC P8 007 15.66 23.17 CTR 7.51 UTE LTE .510 ZBAHS 51 C 203l l l l 2022/05/01 93 54 1.09 105 HNC P8 007 15.23 24.09 CTR 8.86 UTE LTE .510 ZBAHS 51 C 202l l l l 2022/05/01 78 55 .89 120 HNC P8 007 16.89 25.52 CTR 8.63 UTE LTE .510 ZBAHS 51 C 281l l l l 2022/05/01 92 55 1.84 96 HNC P8 007 15.28 23.80 CTR 8.52 UTE LTE .510 ZBAHS 51 C 204l l l l 2022/05/01 93 55 .87 104 HNC P8 007 12.90 23.91 CTR 11.01 UTE LTE .510 ZBAHS 50 C 209l l l l 2022/05/01 78 56 1.45 97 HNC P8 007 16.44 24.54 CTR 8.10 UTE LTE .510 ZBAHS 51 C 282l l l l 2022/05/01 79 56 .84 93 HNC P8 007 17.38 23.89 CTR 6.51 UTE LTE .510 ZBAHS 51 C 279l l l l 2022/05/01 92 56 .88 112 HNC P8 007 16.50 23.10 CTR 6.60 UTE LTE .510 ZBAHS 50 C 211l l l l 2022/05/01 79 57 1.57 100 HNC P8 007 15.43 25.82 CTR 10.39 UTE LTE .510 ZBAHS 50 C 292l l l l 2022/05/01 80 57 1.01 95 HNC P8 007 15.82 24.62 CTR 8.80 UTE LTE .510 ZBAHS 50 C 290l l l l 2022/05/01 87 57 .67 105 HNC P8 007 13.94 26.08 CTR 12.14 UTE LTE .510 ZBAHS 51 C 247l l l l 2022/05/01 88 57 .59 102 HNC P8 007 15.47 22.98 CTR 7.51 UTE LTE .510 ZBAHS 50 C 267l l l l 2022/05/01 95 57 .66 128 HNC P8 007 14.44 21.63 CTR 7.19 UTE LTE .510 ZBAHS 51 C 187l l l l 2022/05/01 79 58 .83 96 HNC P8 007 17.00 24.83 CTR 7.83 UTE LTE .510 ZBAHS 50 C 307l l l l 2022/05/01 81 58 .82 104 HNC P8 007 17.58 23.76 CTR 6.18 UTE LTE .510 ZBAHS 50 C 289l l l l 2022/05/01 89 58 .55 119 HNC P8 007 15.47 23.10 CTR 7.63 UTE LTE .510 ZBAHS 50 C 281l l l l 2022/05/01 92 58 .96 105 HNC P8 007 14.67 23.71 CTR 9.04 UTE LTE .510 ZBAHS 51 C 193l l l l 2022/05/01 86 59 .80 107 HNC P8 007 15.09 23.65 CTR 8.71 UTE LTE .510 ZBAHS 51 C 250l l l l 2022/05/01 86 60 .77 102 HNC P8 007 16.33 23.46 CTR 7.13 UTE LTE .510 ZBAHS 50 C 283l l l l 2022/05/01 87 66 .53 92 HNC P8 007 16.71 22.69 CTR 5.98 UTE LTE .510 ZBAHS 58 C 45l l l l 2022/05/01 72 67 .64 94 HNC P8 007 13.63 25.17 CTR 11.54 UTE LTE .510 ZBAHS 53 C 253l l l l 2022/05/01 73 67 .70 87 HNC P8 007 14.25 24.52 CTR 7.44 UTE LTE .510 ZBAHS 53 C 249l l l l 2022/05/01 74 67 .58 78 HNC P8 007 13.97 23.35 CTR 9.38 UTE LTE .510 ZBAHS 53 C 246l l l l 2022/05/01 73 68 .96 86 HNC P8 007 14.14 25.08 CTR 10.94 UTE LTE .510 ZBAHS 53 C 250l l l
+-----------+----+----+---------+----+----+----+-----+----+---------+---------+---------+---------+-------+----+-------+----+----+------+------+------+--+-----+
l INSPDATE ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 UTIL1 UTIL2 CRLEN CEG CRWID BEGT ENDT PDIA PTYPE CAL L IDXl
+-----------+----+----+---------+----+----+----+-----+----+---------+---------+---------+---------+-------+----+-------+----+----+------+------+------+--+-----+
1 ST Max
SG - 3A Attachment - Service Induced Indications Oconee 3 O3R31 BOCO3 20220501 04/17/2023 12:42:05
+-----------+----+----+---------+----+----+----+-----+----+---------+---------+---------+---------+-------+----+-------+----+----+------+------+------+--+-----+
l INSPDATE ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 UTIL1 UTIL2 CRLEN CEG CRWID BEGT ENDT PDIA PTYPE CAL L IDXl
+-----------+----+----+---------+----+----+----+-----+----+---------+---------+---------+---------+-------+----+-------+----+----+------+------+------+--+-----+
l 2022/05/01 60 69 1.49 94 HNC P8 007 13.89 24.88 CTR 10.99 UTE LTE .510 ZBAHS 53 C 202l l l l 2022/05/01 60 70 1.21 85 HNC P8 007 15.73 23.35 CTR 7.62 UTE LTE .510 ZBAHS 53 C 203l l l l 2022/05/01 72 70 .73 85 HNC P8 007 16.01 22.70 CTR 6.69 UTE LTE .510 ZBAHS 53 C 269l l l l 2022/05/01 71 71 .80 85 HNC P8 007 15.86 24.88 CTR 9.02 UTE LTE .510 ZBAHS 53 C 271l l l l 2022/05/01 79 71 .83 92 HNC P8 007 13.00 26.15 CTR 13.75 UTE LTE .510 ZBAHS 59 C 15l l l l 2022/05/01 83 71 .57 86 HNC P8 007 11.85 23.82 CTR 13.16 UTE LTE .510 ZBAHS 58 C 59l l l l 2022/05/01 71 72 .81 95 HNC P8 007 13.71 26.75 CTR 13.04 UTE LTE .510 ZBAHS 53 C 272l l l l 2022/05/01 79 72 .74 85 HNC P8 007 12.96 24.15 CTR 9.29 UTE LTE .510 ZBAHS 59 C 16l l l l 2022/05/01 60 73 .56 117 HNC P8 007 16.91 23.09 CTR 6.18 UTE LTE .510 ZBAHS 31 C 202l l l l 2022/05/01 72 73 .70 94 HNC P8 007 16.67 25.26 CTR 8.59 UTE LTE .510 ZBAHS 27 C 275l l l l 2022/05/01 80 73 .50 82 HNC P8 007 15.40 23.19 CTR 7.79 UTE LTE .510 ZBAHS 27 C 246l l l l 2022/05/01 84 73 .68 108 HNC P8 007 16.02 22.95 CTR 6.93 UTE LTE .510 ZBAHS 28 C 185l l l l 2022/05/01 85 73 .56 104 HNC P8 007 16.01 22.74 CTR 6.73 UTE LTE .510 ZBAHS 27 C 230l l l l 2022/05/01 60 74 .43 99 HNC P8 007 17.54 22.77 CTR 5.23 UTE LTE .510 ZBAHS 31 C 201l l l l 2022/05/01 72 74 .84 103 HNC P8 007 14.55 26.82 CTR 12.27 UTE LTE .510 ZBAHS 28 C 228l l l l 2022/05/01 79 74 .89 92 HNC P8 007 12.95 24.69 CTR 11.74 UTE LTE .510 ZBAHS 27 C 250l l l l 2022/05/01 80 74 .70 86 HNC P8 007 13.68 22.52 CTR 8.84 UTE LTE .510 ZBAHS 28 C 202l l l l 2022/05/01 94 74 .72 117 HNC P8 007 13.47 25.87 CTR 12.40 UTE LTE .510 ZBAHS 27 C 197l l l l 2022/05/01 95 74 .68 110 HNC P8 007 15.22 23.58 CTR 8.36 UTE LTE .510 ZBAHS 27 C 194l l l l 2022/05/01 70 75 1.25 89 HNC P8 007 13.79 26.58 CTR 12.79 UTE LTE .510 ZBAHS 28 C 232l l l l 2022/05/01 71 76 1.32 96 HNC P8 007 14.49 26.37 CTR 11.88 UTE LTE .510 ZBAHS 28 C 224l l l l 2022/05/01 86 76 .61 117 HNC P8 007 14.52 23.78 CTR 9.26 UTE LTE .510 ZBAHS 28 C 187l l l l 2022/05/01 87 76 .50 122 HNC P8 007 15.27 24.21 CTR 8.94 UTE LTE .510 ZBAHS 27 C 224l l l l 2022/05/01 82 78 .69 123 HNC P8 007 15.58 24.11 CTR 8.53 UTE LTE .510 ZBAHS 31 C 134l l l l 2022/05/01 85 78 .64 115 HNC P8 007 11.72 25.63 CTR 13.91 UTE LTE .510 ZBAHS 28 C 191l l l l 2022/05/01 92 78 1.71 96 HNC P8 007 14.41 26.33 CTR 11.92 UTE LTE .510 ZBAHS 28 C 169l l l l 2022/05/01 68 79 1.32 113 HNC P8 007 15.54 23.60 CTR 8.06 UTE LTE .510 ZBAHS 28 C 240l l l
+-----------+----+----+---------+----+----+----+-----+----+---------+---------+---------+---------+-------+----+-------+----+----+------+------+------+--+-----+
l INSPDATE ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 UTIL1 UTIL2 CRLEN CEG CRWID BEGT ENDT PDIA PTYPE CAL L IDXl
+-----------+----+----+---------+----+----+----+-----+----+---------+---------+---------+---------+-------+----+-------+----+----+------+------+------+--+-----+
2 ST Max
SG - 3A Attachment - Service Induced Indications Oconee 3 O3R31 BOCO3 20220501 04/17/2023 12:42:05
+-----------+----+----+---------+----+----+----+-----+----+---------+---------+---------+---------+-------+----+-------+----+----+------+------+------+--+-----+
l INSPDATE ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 UTIL1 UTIL2 CRLEN CEG CRWID BEGT ENDT PDIA PTYPE CAL L IDXl
+-----------+----+----+---------+----+----+----+-----+----+---------+---------+---------+---------+-------+----+-------+----+----+------+------+------+--+-----+
l 2022/05/01 69 79 .55 100 HNC P8 007 16.10 24.25 CTR 8.15 UTE LTE .510 ZBAHS 31 C 175l l l l 2022/05/01 83 79 .73 115 HNC P8 007 13.70 25.65 CTR 11.95 UTE LTE .510 ZBAHS 31 C 131l l l l 2022/05/01 88 79 .73 110 HNC P8 007 13.76 25.72 CTR 11.96 UTE LTE .510 ZBAHS 28 C 181l l l l 2022/05/01 91 79 1.85 92 HNC P8 007 13.55 26.02 CTR 12.47 UTE LTE .510 ZBAHS 32 C 104l l l l 2022/05/01 92 79 .69 105 HNC P8 007 16.33 23.43 CTR 7.10 UTE LTE .510 ZBAHS 31 C 104l l l l 2022/05/01 69 80 1.13 100 HNC P8 007 12.79 25.16 CTR 12.37 UTE LTE .510 ZBAHS 32 C 167l l l l 2022/05/01 70 80 .56 104 HNC P8 007 16.19 22.81 CTR 6.62 UTE LTE .510 ZBAHS 32 C 165l l l l 2022/05/01 75 89 .72 100 HNC P8 007 13.91 23.21 CTR 9.30 UTE LTE .510 ZBAHS 41 C 61l l l l 2022/05/01 76 89 .71 101 HNC P8 007 14.49 23.58 CTR 9.09 UTE LTE .510 ZBAHS 45 C 9l
+-----------+----+----+---------+----+----+----+-----+----+---------+---------+---------+---------+-------+----+-------+----+----+------+------+------+--+-----+
l INSPDATE ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 UTIL1 UTIL2 CRLEN CEG CRWID BEGT ENDT PDIA PTYPE CAL L IDXl
+-----------+----+----+---------+----+----+----+-----+----+---------+---------+---------+---------+-------+----+-------+----+----+------+------+------+--+-----+
Tubes: 63 Records: 63 3 ST Max
SG - 3B Attachment - Service Induced Indications Oconee 3 O3R31 BOCO3 20220501 04/17/2023 12:46:19
+-----------+----+----+---------+----+----+----+-----+----+---------+---------+---------+---------+-------+----+-------+----+----+------+------+------+--+-----+
l INSPDATE ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 UTIL1 UTIL2 CRLEN CEG CRWID BEGT ENDT PDIA PTYPE CAL L IDXl
+-----------+----+----+---------+----+----+----+-----+----+---------+---------+---------+---------+-------+----+-------+----+----+------+------+------+--+-----+
l 2022/05/01 78 60 .56 104 HNC P8 007 17.40 24.10 CTR 6.70 UTE LTE .510 ZBAHS 34 C 240l l l l 2022/05/01 78 64 .88 83 HNC P8 007 15.44 24.42 CTR 8.98 UTE LTE .510 ZBAHS 55 C 144l l l l 2022/05/01 76 65 1.24 79 HNC P8 007 14.17 24.10 CTR 9.93 UTE LTE .510 ZBAHS 55 C 152l l l l 2022/05/01 77 66 1.57 76 HNC P8 007 15.11 23.48 CTR 8.37 UTE LTE .510 ZBAHS 54 C 165l l l l 2022/05/01 77 67 .62 72 HNC P8 007 15.77 23.41 CTR 7.64 UTE LTE .510 ZBAHS 55 C 135l l l l 2022/05/01 84 67 .61 80 HNC P8 007 16.44 24.05 CTR 7.61 UTE LTE .510 ZBAHS 55 C 166l l l l 2022/05/01 57 68 1.09 84 HNC P8 007 15.08 23.40 CTR 8.32 UTE LTE .510 ZBAHS 59 C 149l l l l 2022/05/01 58 69 1.10 87 HNC P8 007 13.49 24.96 CTR 11.47 UTE LTE .510 ZBAHS 58 C 209l l l l 2022/05/01 56 70 .65 113 HNC P8 007 16.05 25.26 CTR 9.21 UTE LTE .510 ZBAHS 57 C 122l l l l 2022/05/01 56 71 .92 94 HNC P8 007 15.51 23.02 CTR 7.51 UTE LTE .510 ZBAHS 57 C 123l l l l 2022/05/01 60 71 .58 84 HNC P8 007 15.36 21.71 CTR 6.35 UTE LTE .510 ZBAHS 57 C 109l l l l 2022/05/01 79 71 .76 80 HNC P8 007 14.39 25.49 CTR 11.10 UTE LTE .510 ZBAHS 55 C 124l l l l 2022/05/01 80 71 .79 79 HNC P8 007 16.42 23.06 CTR 6.64 UTE LTE .510 ZBAHS 54 C 136l l l l 2022/05/01 60 72 .87 100 HNC P8 007 15.76 23.39 CTR 7.63 UTE LTE .510 ZBAHS 57 C 110l l l l 2022/05/01 71 73 .56 110 HNC P8 007 15.30 22.65 CTR 7.35 UTE LTE .510 ZBAHS 52 C 188l l l l 2022/05/01 87 73 .73 76 HNC P8 007 15.28 22.51 CTR 7.23 UTE LTE .510 ZBAHS 52 C 86l l l l 2022/05/01 60 74 .54 81 HNC P8 007 15.67 21.81 CTR 6.14 UTE LTE .510 ZBAHS 56 C 200l l l l 2022/05/01 63 75 1.11 88 HNC P8 007 15.45 27.91 CTR 12.46 UTE LTE .510 ZBAHS 56 C 190l l l l 2022/05/01 70 75 .79 86 HNC P8 007 16.03 23.13 CTR 7.10 UTE LTE .510 ZBAHS 53 C 174l l l l 2022/05/01 63 76 1.04 78 HNC P8 007 16.50 24.40 CTR 7.90 UTE LTE .510 ZBAHS 56 C 191l l l l 2022/05/01 66 76 .95 93 HNC P8 007 15.47 23.30 CTR 7.83 UTE LTE .510 ZBAHS 52 C 206l l l l 2022/05/01 67 76 .77 94 HNC P8 007 15.67 24.39 CTR 8.72 UTE LTE .510 ZBAHS 52 C 203l l l l 2022/05/01 68 76 .82 85 HNC P8 007 15.82 24.73 CTR 8.91 UTE LTE .510 ZBAHS 53 C 187l l l l 2022/05/01 70 76 .61 85 HNC P8 007 15.68 23.45 CTR 7.77 UTE LTE .510 ZBAHS 52 C 193l l l l 2022/05/01 71 76 1.00 88 HNC P8 007 14.61 22.55 CTR 7.94 UTE LTE .510 ZBAHS 53 C 177l l l l 2022/05/01 68 77 .67 102 HNC P8 007 16.03 25.31 CTR 9.28 UTE LTE .510 ZBAHS 52 C 200l l l l 2022/05/01 69 77 .89 87 HNC P8 007 15.49 23.51 CTR 8.02 UTE LTE .510 ZBAHS 52 C 197l l l
+-----------+----+----+---------+----+----+----+-----+----+---------+---------+---------+---------+-------+----+-------+----+----+------+------+------+--+-----+
l INSPDATE ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 UTIL1 UTIL2 CRLEN CEG CRWID BEGT ENDT PDIA PTYPE CAL L IDXl
+-----------+----+----+---------+----+----+----+-----+----+---------+---------+---------+---------+-------+----+-------+----+----+------+------+------+--+-----+
1 ST Max
SG - 3B Attachment - Service Induced Indications Oconee 3 O3R31 BOCO3 20220501 04/17/2023 12:46:19
+-----------+----+----+---------+----+----+----+-----+----+---------+---------+---------+---------+-------+----+-------+----+----+------+------+------+--+-----+
l INSPDATE ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 UTIL1 UTIL2 CRLEN CEG CRWID BEGT ENDT PDIA PTYPE CAL L IDXl
+-----------+----+----+---------+----+----+----+-----+----+---------+---------+---------+---------+-------+----+-------+----+----+------+------+------+--+-----+
l 2022/05/01 71 77 1.02 84 HNC P8 007 13.46 24.39 CTR 10.93 UTE LTE .510 ZBAHS 52 C 190l l l l 2022/05/01 83 77 .59 66 HNC P8 007 16.58 21.59 CTR 5.01 UTE LTE .510 ZBAHS 52 C 101l l l l 2022/05/01 48 78 .69 111 HNC P8 007 16.73 25.89 CTR 9.16 UTE LTE .510 ZBAHS 56 C 274l l l l 2022/05/01 68 78 .52 73 HNC P8 007 15.76 22.81 CTR 7.05 UTE LTE .510 ZBAHS 52 C 218l l l l 2022/05/01 69 78 .77 86 HNC P8 007 15.80 23.44 CTR 7.64 UTE LTE .510 ZBAHS 52 C 215l l l l 2022/05/01 49 79 .70 114 HNC P8 007 15.49 23.49 CTR 8.00 UTE LTE .510 ZBAHS 56 C 272l l l l 2022/05/01 61 79 .68 70 HNC P8 007 15.25 22.98 CTR 7.73 UTE LTE .510 ZBAHS 60 C 21l l l l 2022/05/01 62 79 .70 87 HNC P8 007 14.89 22.52 CTR 7.63 UTE LTE .510 ZBAHS 61 C 17l l l l 2022/05/01 69 79 .88 91 HNC P8 007 14.22 25.20 CTR 10.98 UTE LTE .510 ZBAHS 53 C 185l l l l 2022/05/01 70 79 .89 97 HNC P8 007 14.86 22.79 CTR 7.93 UTE LTE .510 ZBAHS 53 C 182l
+-----------+----+----+---------+----+----+----+-----+----+---------+---------+---------+---------+-------+----+-------+----+----+------+------+------+--+-----+
l INSPDATE ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 UTIL1 UTIL2 CRLEN CEG CRWID BEGT ENDT PDIA PTYPE CAL L IDXl
+-----------+----+----+---------+----+----+----+-----+----+---------+---------+---------+---------+-------+----+-------+----+----+------+------+------+--+-----+
Tubes: 37 Records: 37 2 ST Max