Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24012A049 | 11 January 2024 | Request for Additional Information Regarding Final Response to Generic Letter 2004-02 | Coatings |
ML23339A045 | 5 December 2023 | Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000546/2024010 | Aging Management License Renewal |
ML23312A130 | 7 November 2023 | Final Rci/Rai - Constellation R. E. Ginna Nuclear Power Plant - Exemption from Security Rule (EPID L-2023-LLE-0029) (Email) | Time of Discovery Fitness for Duty Contraband |
ML23297A235 | 26 October 2023 | Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection | Cyber Security |
ML23219A166 | 16 August 2023 | Request for Additional Information Regarding Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping (EPID: L-2023-LLR-0006) - Non-proprietary | Ultimate heat sink |
ML23209A724 | 31 July 2023 | Request for Information on the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000454/2024010 and 05000455/2024010 | Stroke time Probabilistic Risk Assessment Temporary Modification Aging Management Large early release frequency COVID-19 |
ML23198A037 | 17 July 2023 | Information Request to Support Upcoming Problem Identification and Resolution (PIR) Inspection at Byron Nuclear Plant | Temporary Modification Aging Management Maintenance Rule Program |
ML23191A844 | 10 July 2023 | 05000456; 05000457 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information | Job Performance Measure |
ML23172A117 | 22 June 2023 | Notification of NRC Fire Protection Team Inspection Request for Information | Safe Shutdown Fire Barrier Probabilistic Risk Assessment Fire impairment Job Performance Measure Fire Protection Program |
ML23160A022 | 6 June 2023 | NRR E-mail Capture - Calvert Cliffs - Long Term Coupon Surveillance Program RAI | |
ML23156A010 | 4 June 2023 | NRR E-mail Capture - Calvert Cliffs - RAI License Amendment Request for Emergency Desiel Generator | |
ML23110A320 | 21 April 2023 | Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection | |
ML23094A135 | 4 April 2023 | Request for Information for Nrc Commercial Grade Dedication Inspection Inspection Report 05000456/2023010 05000457/2023010 | Commercial Grade Dedication Large early release frequency |
ML23069A033 | 6 March 2023 | Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 | |
ML23069A034 | 6 March 2023 | Unit 1 Lr Commitment 10 RAI Set 1 - (Non-Proprietary) | |
ML23115A241 | 20 January 2023 | NRR E-mail Capture - Preliminary RAIs Related to L-2022-LLA-0131 - Byron, Unit 2, Reinsertion of an Accident Tolerant Fuel Lead Test Assembly | |
ML23018A163 | 18 January 2023 | Notification of NRC Baseline Inspection and Request for Information | Boric Acid Non-Destructive Examination Aging Management Foreign Material Exclusion Dissimilar Metal Weld Scaffolding |
ML22241A052 | 29 August 2022 | Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000456/2022004 05000457/2022004 | Boric Acid Non-Destructive Examination Aging Management Foreign Material Exclusion Scaffolding |
ML22237A027 | 25 August 2022 | Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information | Job Performance Measure |
ML22179A211 | 28 June 2022 | Notification of Conduct of a Fire Protection Team Inspection | Safe Shutdown Probabilistic Risk Assessment Temporary Modification Pandemic Fire Protection Program |
ML22160A396 | 9 June 2022 | R. E. Ginna Nuclear Power Plant, LLC - Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2022010 | Temporary Modification |
ML22271A077 | 6 May 2022 | NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request | |
ML22129A013 | 6 May 2022 | NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 | Hydrostatic Incorporated by reference |
ML22116A127 | 26 April 2022 | Unit 2 RFI for an NRC Triennial Heat Exchanger/Sink Performance Inspection and RFI IR 05000454/2022002 05000455/2022002 | Ultimate heat sink Temporary Modification Flow Induced Vibration |
ML22091A239 | 1 April 2022 | NRR E-mail Capture - Calvert Cliffs - Formal RAI for Proposed Alternative for Examinations of Certain Pressurizer Welds | Probabilistic Risk Assessment Incorporated by reference |
ML22091A085 | 1 April 2022 | NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) | Probabilistic Risk Assessment Incorporated by reference |
ML22041B536 | 10 February 2022 | NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 | |
ML22034A986 | 4 February 2022 | Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000456/2022402 05000457/2022402 | Cyber Security |
ML21350A437 | 16 December 2021 | Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team) Inspection Report 05000456/2022010 and 05000457/2022010 | Stroke time Temporary Modification Aging Management Job Performance Measure Large early release frequency Coronavirus |
ML21308A559 | 4 November 2021 | NRR E-mail Capture - NRC Request for Additional Information for Ginna Biennial EP Exercise Exemption Request | Exemption Request |
ML21287A032 | 13 October 2021 | Request for Additional Information Re Proposed Alternative for Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds | |
ML21287A093 | 5 October 2021 | Request for Additional Information: Calvert Cliffs 1 & 2 LAR to Revise Spent Fuel Pool Cooling - Shutdown Cooling Systems Licensing Basis (EPID L-2021-LLA-0112) (Email) | Earthquake |
ML21273A331 | 4 October 2021 | Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Byron Station | Temporary Modification Aging Management Maintenance Rule Program |
ML21256A190 | 10 September 2021 | NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application | |
ML21228A235 | 17 August 2021 | Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000457/2021004 | Boric Acid Nondestructive Examination Aging Management Dissimilar Metal Weld |
ML21187A223 | 29 July 2021 | Temporary Instruction 2515/194 Inspection Documentation Request | Open Phase Condition Time Critical Operator Action |
ML21203A311 | 21 July 2021 | NRR E-mail Capture - Final Byron Permanently Defueled Technical Specifications (PDTS) - Second Round RAI | |
ML21193A094 | 12 July 2021 | Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information | Job Performance Measure |
ML21189A160 | 8 July 2021 | NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs | Anticipated operational occurrence |
ML21189A161 | 8 July 2021 | NRR E-mail Capture - Second Round Request for Additional Information - Byron Permanently Defueled Technical Specification Amendment | |
ML21180A156 | 28 June 2021 | Request for Additional Information Regarding License Amendment Request Concerning Containment Sump | Probabilistic Risk Assessment |
ML21144A213 | 24 May 2021 | NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application | |
ML21130A038 | 21 May 2021 | Memo to File - Draft Request for Additional Information Relief Request CISI-03-01 Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements | |
ML21117A034 | 5 May 2021 | Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 | Boric Acid |
ML21119A108 | 27 April 2021 | Ti 2515/194 Inspection Documentation Request | Open Phase Condition Time Critical Operator Action |
ML21076A515 | 17 March 2021 | R. E. Ginna Nuclear Power Plant - RAI Steam Generator LAR to Revise Technical Specifications for Steam Generator Tube Inspection Frequency (EPID L-2020-LLA-0207) (e-mail) | |
ML21062A065 | 1 March 2021 | NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting | Incorporated by reference |
ML21057A102 | 25 February 2021 | Notification of NRC Fire Protection Team Inspection Request for Information; Inspection Report 05000456/2021010; 05000457/2021010 | Safe Shutdown Fire Barrier Probabilistic Risk Assessment Fire impairment Job Performance Measure Fire Protection Program |
ML21053A314 | 22 February 2021 | Information Request for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000317/2021010 and 05000318/2021010 | Commercial Grade Dedication Probabilistic Risk Assessment Temporary Modification Aging Management |
ML21049A257 | 18 February 2021 | Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) |