Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23073A39831 March 2023TMI-2 ISFSI Biennial Update Report for 2023Coatings
Incorporated by reference
Aging Management
Fire Watch
Scaffolding
Grace period
TMI-23-005, Updated Spent Fuel Management Plan21 March 2023Updated Spent Fuel Management Plan
ML22335A4631 December 2022Chronology of Significant Events in Operator Licensing Since the Three Mile Island Accident (1979)Significance Determination Process
Job Performance Measure
Generic Fundamentals Examination
License Renewal
Earthquake
Pandemic
Coronavirus
COVID-19
ML22101A07923 March 2022TMI2-EN-RPT-0001, Revision 1, Determination of the Safe Fuel Mass Limit for DecommissioningGrab sample
TMI-22-008, 2021 Aircraft Movement Data Annual Report for TMI-128 February 20222021 Aircraft Movement Data Annual Report for TMI-1
ML22105A09316 December 2021Attachment 3 - RSCS Technical Support Document (Tsd) No. 21-078 Rev 00 TMI-2 Source Term Limitations and Administrative Controls to Prevent Exceeding the 1 Rem EPA PAGFire Protection Program
ML21236A28810 August 2021TMI-2 Pdms SAR Update 14 & QA Plan (Rev 18 & 19) Biennial Submittal 08-10-21Safe Shutdown
Boric Acid
High winds
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Tornado Missile
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Emergency Lighting
Locked High Radiation Area
Condition Adverse to Quality
Decommissioning Funding Plan
Tornado Generated Missile
Earthquake
Fire Protection Program
Power change
ML21133A2645 May 2021Supplemental Information to License Amendment Request Decommissioning Technical SpecificationsGrab sample
ML21084A22917 March 2021Notification of Amended Post-Shutdown Decommissioning Activities Report Accordance with 10 CFR 50.82(a)(7), Revision 4Reactor Vessel Water Level
Anticipated operational occurrence
Met Tower
Temporary Modification
Locked High Radiation Area
Exemption Request
Fire Protection Program
Environmental Justice
ML21085A69215 March 2021Plan for Management of Debris MaterialLocked High Radiation Area
ML21056A00525 February 20212020 Aircraft Movement Data Annual Report
ML21133A2651 February 2021Calculation TMI2-EN-RPT-0002, Revision 0, MCNP Version 6.2 Bias Determination for Low Enrichment Uranium Using the ENDF/B-VIII.0 Cross Section Library
ML20108E84331 October 2019Additional Security Measures for Access Authorization and Fingerprinting at Independent Spent Fuel Storage InstallationsCyber Security
ML18107A21510 April 2018Biennial 10 CFR 50.59 and Commitment Revision Reports for 2016 and 2017Surveillance Frequency Control Program
Open Phase Condition
ML17289A05315 October 2017Case Study OverviewBoric Acid
ML17165A40914 June 2017T1R22 Refuel Outage MRP-227-A Reactor Internals Scope Deferral Review
RS-16-104, Mitigating Strategies Flood Hazard Assessment Submittal29 June 2016Mitigating Strategies Flood Hazard Assessment SubmittalFLEX
Fukushima Dai-Ichi
RS-16-087, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)29 June 2016Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)High winds
Shutdown Margin
Ultimate heat sink
Mission time
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Temporary Modification
Emergency Lighting
FLEX
B.5.b
Tornado Generated Missile
Fukushima Dai-Ichi
Tornado Missile Protection
Spent Fuel Pool Instrumentation
Earthquake
Pressure Boundary Leakage
Grace period
Unidentified leakage
ML15306A50317 December 2015Closure Evaluation for Report Pursuant to 10 CFR 50.46 Requirements Related to Thermal Conductivity Degradation
ML15223A21514 August 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the NTTF Review of InsightsSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
TMI-15-076, Submittal of TMI White Paper-TMI Bwst Cleanup Path Issue22 June 2015Submittal of TMI White Paper-TMI Bwst Cleanup Path IssueSafe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML15043A14413 February 2015Review of Steam Generator Tube Inspection Report for Fall 2013 Outage
ML14297A41119 December 2014Letter and Non-Proprietary Safety Evaluation of Reactor Vessel Internals Inspection PlanFunctionality Assessment
Aging Management
EVT-1
Flow Induced Vibration
RS-14-301, Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.17 December 2014Expedited Seismic Evaluation Process Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima.Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Seismically rugged
Earthquake
Power-Operated Valves
Power Operated Valves
RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 124 September 2014Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1Through-Wall Leak
ML14163A02410 June 2014Response to Request for Additional Information - Review of the Cycle 20 Core Operating Limits ReportBoric Acid
Shutdown Margin
ML14189A28530 April 2014Topical Report 213, 40th Year Reactor Building Tendon Surveillance (Period 10), (Rev 0)Safe Shutdown
Fire Barrier
Past operability
Coatings
Nondestructive Examination
Incorporated by reference
Tornado Generated Missile
ML14189A28617 April 2014Final Report for the 40th Year (10th Period) Tendon Surveillance at Three Mile Island, Unit 1Coatings
Foreign Material Exclusion
TMI-14-053, Biennial 10 CFR 50.59 and Commitment Revision Report for 2012 and 201316 April 2014Biennial 10 CFR 50.59 and Commitment Revision Report for 2012 and 2013License Renewal
Dissimilar Metal Weld
ML13225A55217 December 2013Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Seismically rugged
Frazil ice
Battery sizing
Earthquake
ML13338A6719 December 2013Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Three Mile Island, Unit 1, TAC MF0803Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Seismically rugged
Frazil ice
Battery sizing
Earthquake
ML14189A28712 November 2013TMI 40TH Year Tendon Surveillance, Tendon No. 1-146-34, Tendon End Buddress 4Safe Shutdown
Time of Discovery
Commercial Grade Dedication
Coatings
Nondestructive Examination
Aging Management
Foreign Material Exclusion
Moisture barrier
Scaffolding
TMI-14-061, 40th Year Tendon Surveillance Engineering Report (Topical Report 213), Precision Surveillance Corporation in-Service Inspection Quality Control Procedure, Monitoring Tendon Force (Lift-Offs)3 September 201340th Year Tendon Surveillance Engineering Report (Topical Report 213), Precision Surveillance Corporation in-Service Inspection Quality Control Procedure, Monitoring Tendon Force (Lift-Offs)Boric Acid
Commercial Grade Dedication
Nondestructive Examination
Incorporated by reference
Condition Adverse to Quality
Foreign Material Exclusion
Liquid penetrant
Scaffolding
TMI-13-107, Attachment 1 - Areva Document No. ANP-3102Q1, Response to NRC Ria Regarding License Amendment Request to Update Pressure -Temperature Limit Curves for Three-Mile Island Unit 1, Revision 0, Dated August 201331 August 2013Attachment 1 - Areva Document No. ANP-3102Q1, Response to NRC Ria Regarding License Amendment Request to Update Pressure -Temperature Limit Curves for Three-Mile Island Unit 1, Revision 0, Dated August 2013Exemption Request
ML13232A21731 July 2013Attachment 2 - Areva Document No. ANP-3102, Revision 3,Three-Mile Island Unit 1 Appendix G Pressure-Temperature Limits at 50.2 EFPY with Mur, Revision 3, Dated July 2013Hydrostatic
TMI-13-041, Post-Shutdown Decommissioning Activities Report Submittal28 June 2013Post-Shutdown Decommissioning Activities Report SubmittalReactor Vessel Water Level
Environmental Justice
TMI-12-148, Plant-Specific Path and Schedule for Resolution of Generic Letter 2004-0216 May 2013Plant-Specific Path and Schedule for Resolution of Generic Letter 2004-02Coatings
Foreign Material Exclusion
IR 05000456/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
ML13008A21931 January 2013U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000454/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000461/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000237/201320231 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000373/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000352/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000219/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000277/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000254/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000272/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
IR 05000289/201320131 January 2013Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee
RS-12-175, Report No. 12Q0108.70-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Three Mile Island Unit 1, Cover Through Page B-2097 November 2012Report No. 12Q0108.70-R-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Three Mile Island Unit 1, Cover Through Page B-209Safe Shutdown
Unanalyzed Condition
Boric Acid
Packing leak
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Arc flash
Finite Element Analysis
B.5.b
Fukushima Dai-Ichi
Design basis earthquake
Frazil ice
Earthquake
Control of Heavy Loads
Scaffolding
Weak link
Seismic Walkdown Report