Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24032A111 | 1 February 2024 | Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval | |
ML24032A466 | 16 January 2024 | Response to Comments on Draft Vpdes Permit No. VA0052451 | |
ML23214A194 | 5 September 2023 | Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information - Report | Probabilistic Risk Assessment Fukushima Dai-Ichi Earthquake |
ML23167B007 | 31 May 2023 | Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary | Subsequent License Renewal |
ML23103A228 | 12 April 2023 | Stations Units 1 and 2; Millstone Power Station Units 2 and 3, DOM-NAF-2-P/NP-A, Revision 0.4, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code | Shutdown Margin Anticipated operational occurrence Post Accident Monitoring B.5.b Exemption Request Fuel cladding Fire Protection Program |
ML23054A192 | 22 February 2023 | ASME OM Code Inservice Testing Program Alternative Request V-01, Use of Mechanical Agitation Process for Pressure Isolation Valve 1-SI-241 Seat Leakage Testing Supplemental Information | |
ML22353A620 | 19 December 2022 | Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code | |
ML22255A010 | 28 June 2022 | Owner'S Activity Report | Through Wall Leak |
ML22263A364 | 23 May 2022 | Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 1 - 95 | |
ML22263A285 | 23 May 2022 | Alert and Notification System Evaluation Report_Ans Evaluation_Redacted Page 1-65 | |
ML22263A369 | 1 May 2022 | Alert and Notification System Evaluation Report - ANS Evaluation Redacted Pages 96-190 | |
ML22119A172 | 13 April 2022 | Post-Accident Monitoring (PAM) Report | Post Accident Monitoring |
ML21333A284 | 29 November 2021 | Requal Notification Letter | Job Performance Measure |
ML21175A247 | 24 June 2021 | 2020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....- | |
ML20091L985 | 4 May 2021 | Record of Decision | Incorporated by reference License Renewal Subsequent License Renewal Environmental Justice |
ML20091L983 | 4 May 2021 | SLR License | Safe Shutdown Internal Flooding Probabilistic Risk Assessment Cyber Security Fire Protection Program GOTHIC |
ML21036A077 | 23 February 2021 | Review of Steam Generator Tube Inspection Report for the Cycle 26 Spring 2019 Refueling Outage | |
ML21042B321 | 11 February 2021 | Stations, Units 1 & 2; Millstone Power Station, Units 2 & 3 - Request for Approval of Fleet Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code | |
ML20296A680 | 22 October 2020 | ASME Section XI Inservice Inspection Program Request for NRC Approval of Proposed Alternative S1-I5-ISL-05 and S2-15-ISL-06 | Finite Element Analysis Weak link |
ML20254A347 | 8 September 2020 | Supplement to Operator License Examination Comments | |
ML20247J616 | 3 September 2020 | Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
ML20246G706 | 24 August 2020 | Enclosure 4: Attachment 1 - PWROG-18005-NP, Revision 2, Determination of Unirradiated Rt and Upper-Shelf Values of the North Anna Units 1 and 2 Reactor Vessel Materials | |
ML20203M160 | 20 July 2020 | VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status | Anchor Darling |
ML20149K671 | 31 May 2020 | PWROG-19047-NP, Revision 0, North Anna, Units 1 and 2, Reactor Vessels Low Upper-Shelf Fracture Toughness Equivalent Margin Analysis | Incorporated by reference Finite Element Analysis |
ML20076A576 | 28 May 2020 | Staff Assessment of Flood Hazard Focused Evaluation and Integrated Assessment | Safe Shutdown High winds Internal Flooding FLEX Fukushima Dai-Ichi Earthquake Minimum staff Backfit |
ML20140A239 | 18 May 2020 | ASME Section XI Inservicee Inspection Program Proposed Inservice Inspection Alternative N1-15-NDE-002 | Boric Acid High Radiation Area Non-Destructive Examination Finite Element Analysis EVT-1 Pressure Boundary Leakage |
ML20246G701 | 31 March 2020 | Enclosure 4: Attachment 3 - WCAP-18364-NP, Rev. 1, North Anna Units 1 and 2 Time-Limited Aging Analysis on Reactor Vessel Integrity for Subsequent License Renewal (SLR) | Incorporated by reference Exemption Request |
ML20090B397 | 26 March 2020 | Revised License Renewal Commitment Pressurizer Surge Line Weld Inspection Frequency | Weld Overlay Operating Basis Earthquake Finite Element Analysis License Renewal Subsequent License Renewal |
ML20246G707 | 31 January 2020 | Enclosure 4: Attachment 4 - WCAP-11164-NP, Rev. 2, Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for North Anna Units 1 and 2 Nuclear Power Plants for the Subsequent License Renewal | Safe Shutdown Earthquake Weld Overlay Hydrostatic Pressure Boundary Leakage Pressure boundary leak Dissimilar Metal Weld |
ML19347A421 | 26 November 2019 | Owner'S Activity Report | |
ML19249B768 | 29 August 2019 | Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated) | Safe Shutdown Boric Acid Time of Discovery High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Internal Flooding Reserve Station Service Transformer Operating Basis Earthquake Operator Manual Action Emergency Lighting FLEX Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
ML19249B772 | 29 August 2019 | Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated) | Safe Shutdown Time of Discovery High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Internal Flooding Reserve Station Service Transformer Operating Basis Earthquake Operator Manual Action FLEX Design basis earthquake Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
ML19249B774 | 29 August 2019 | Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated) | Safe Shutdown Time of Discovery High winds Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Safe Shutdown Earthquake Internal Flooding Reserve Station Service Transformer Operating Basis Earthquake Operator Manual Action FLEX Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
ML19249B778 | 29 August 2019 | Enclosure 6 - Millstone Power Station, Unit 2, Comparison Matrix RCS Pot. Loss A.1 | |
ML19235A080 | 19 August 2019 | Thermo-Lag Website | Coatings |
ML19235A079 | 19 August 2019 | Pyrocrete Website | |
ML19235A078 | 19 August 2019 | Mineral Wool Website | |
ML19235A077 | 19 August 2019 | Micarta Website | |
ML19235A076 | 19 August 2019 | Marinite Website | Coatings |
ML19235A068 | 19 August 2019 | 3M Interam Website | Fire Barrier Coatings Earthquake |
ML19235A069 | 19 August 2019 | Bio K-10 Website | |
ML19235A070 | 19 August 2019 | Cera Blanket Website | |
ML19235A071 | 19 August 2019 | Cerafiber Website | |
ML19235A072 | 19 August 2019 | Duxseal Website | |
ML19235A073 | 19 August 2019 | Gypsum Website | |
ML19235A074 | 19 August 2019 | Kbs Sealbags Website | |
ML19235A075 | 19 August 2019 | Marinite Slide Plates Products - Piping Tech | |
ML19204A358 | 30 June 2019 | WCAP-18258-NP, Revision 1, Flaw Tolerance Evaluation for Susceptible Reactor Coolant Loop Cast Austenitic Stainless Steel Elbow Components for Surry Units 1 and 2. | Safe Shutdown Earthquake Aging Management Earthquake |
ML19163A154 | 6 June 2019 | SLRA - Attachment 4D Letter - Draft to Dominion | Packing leak Aging Management |
ML19140A276 | 20 May 2019 | Essential Fish Habitat Mapper Results for Surry Power Station |