ML22119A172
ML22119A172 | |
Person / Time | |
---|---|
Site: | North Anna ![]() |
Issue date: | 04/13/2022 |
From: | Hilbert L Virginia Electric & Power Co (VEPCO) |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
22-118 | |
Download: ML22119A172 (3) | |
Similar Documents at North Anna | |
---|---|
Category:Letter
MONTHYEARML24032A1112024-02-0101 February 2024
[Table view]Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01 Category:Report MONTHYEARML24032A1112024-02-0101 February 2024
[Table view]Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML23214A1942023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information - Report ML23103A2282023-04-12012 April 2023 Stations Units 1 and 2; Millstone Power Station Units 2 and 3, DOM-NAF-2-P/NP-A, Revision 0.4, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML22353A6202022-12-19019 December 2022 Request for Approval of Appendix F Fleet Report DOM-NAF-2-P, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code ML22255A0102022-06-28028 June 2022 Owner'S Activity Report ML22263A2852022-05-23023 May 2022 Alert and Notification System Evaluation Report_Ans Evaluation_Redacted Page 1-65 ML22119A1722022-04-13013 April 2022 Post-Accident Monitoring (PAM) Report ML21333A2842021-11-29029 November 2021 Requal Notification Letter ML21175A2472021-06-24024 June 2021 2020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....- ML21036A0772021-02-23023 February 2021 Review of Steam Generator Tube Inspection Report for the Cycle 26 Spring 2019 Refueling Outage ML21042B3212021-02-11011 February 2021 Stations, Units 1 & 2; Millstone Power Station, Units 2 & 3 - Request for Approval of Fleet Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML20254A3472020-09-0808 September 2020 Supplement to Operator License Examination Comments ML20247J6162020-09-0303 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20246G7062020-08-24024 August 2020 Enclosure 4: Attachment 1 - PWROG-18005-NP, Revision 2, Determination of Unirradiated Rt and Upper-Shelf Values of the North Anna Units 1 and 2 Reactor Vessel Materials ML20203M1602020-07-20020 July 2020 VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status ML20149K6712020-05-31031 May 2020 PWROG-19047-NP, Revision 0, North Anna, Units 1 and 2, Reactor Vessels Low Upper-Shelf Fracture Toughness Equivalent Margin Analysis ML20140A2392020-05-18018 May 2020 ASME Section XI Inservicee Inspection Program Proposed Inservice Inspection Alternative N1-15-NDE-002 ML20246G7012020-03-31031 March 2020 Enclosure 4: Attachment 3 - WCAP-18364-NP, Rev. 1, North Anna Units 1 and 2 Time-Limited Aging Analysis on Reactor Vessel Integrity for Subsequent License Renewal (SLR) ML20090B3972020-03-26026 March 2020 Revised License Renewal Commitment Pressurizer Surge Line Weld Inspection Frequency ML20246G7072020-01-31031 January 2020 Enclosure 4: Attachment 4 - WCAP-11164-NP, Rev. 2, Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for North Anna Units 1 and 2 Nuclear Power Plants for the Subsequent License Renewal ML19347A4212019-11-26026 November 2019 Owner'S Activity Report ML19249B7742019-08-29029 August 2019 Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated) ML19249B7682019-08-29029 August 2019 Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated) ML19249B7782019-08-29029 August 2019 Enclosure 6 - Millstone Power Station, Unit 2, Comparison Matrix RCS Pot. Loss A.1 ML19249B7722019-08-29029 August 2019 Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated) ML19106A3562019-04-23023 April 2019 Review of Steam Generator Tube Inspection Report for the Cycle 26 Spring 2018 Refueling Outage ML19011A1722019-01-0404 January 2019 Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up) ML19011A1732019-01-0404 January 2019 Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting Documents ML19011A1742019-01-0404 January 2019 Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting Documents ML20246G7092018-10-31031 October 2018 Enclosure 4: Attachment 2 - WCAP-18353-NP, Rev. 0, Reactor Internals Fluence Evaluation for a Westinghouse 3-Loop Plant with Two Units - Subsequent License Renewal ML18198A1192018-05-31031 May 2018 Attachment 5 to 18-233, ANP-3467NP, Rev. 0, North Anna Fuel-Vendor Independent Small Break LOCA Analysis Licensing Report ML17186A0842017-06-29029 June 2017 Flooding Focused Evaluation Summary ML16187A3232016-06-24024 June 2016 Submittal of Owner'S Activity Report (Form OAR-1), for Refueling Outage N2R24 ML15253A4102016-03-11011 March 2016 Enclosure 2 Screening Analysis Report ML15238A8442015-09-25025 September 2015 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML15259A3422015-08-24024 August 2015 10 CFR 71.95 Report Evaluation Form; Submitted by Fenok, Erwin Resin Solutions, North Anna Power Stations, Et Al ML15232A8112015-08-24024 August 2015 Evaluation of Information Related to Commitments 6 and 8 from Confirmatory Action Letter No. NRR-2011-002 ML15238B5922015-08-17017 August 2015 Review of Commitment Action Completion Confirmation Action Letter Regarding Earthquake in 2011 ML15175A1902015-06-17017 June 2015 Owner'S Activity Report ML15057A2492015-04-20020 April 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Relating to Recommendation 2.1 ML15058A0342015-02-23023 February 2015 Summary of Facility Changes, Tests and Experiments ML14133A0112014-05-0707 May 2014 March 12, 2012 Information Request Phase 2 Staffing Assessment Report ML14092A4162014-03-31031 March 2014 Response to March 12, 2012 Information Request Seismic Hazard and Screening Report (CEUS Sites)For Recommendation 2.1 ML14080A0022014-03-31031 March 2014 PNNL-22553, Final Assessment of Manual Ultrasonic Examinations Applied to Detect Flaws in Primary System Dissimilar Metal Welds at North Anna Power Station. ML14084A3272014-03-27027 March 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14084A2122014-03-27027 March 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14283A0462014-02-28028 February 2014 MRP-375, Technical Basis for Reexamination Interval Extension for Alloy 690 PWR Reactor Vessel Top Head Penetration Nozzles (EPRI 3002002441), Attachment 1 ML13338A4482014-01-29029 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14006A1712014-01-23023 January 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for North Anna Power Station, Units 1 and 2, TAC Nos.: MF0998 and MF0999 2024-02-01 Category:Technical MONTHYEARML24032A4662024-01-16016 January 2024
[Table view]Response to Comments on Draft Vpdes Permit No. VA0052451 ML23214A1942023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information - Report ML23103A2282023-04-12012 April 2023 Stations Units 1 and 2; Millstone Power Station Units 2 and 3, DOM-NAF-2-P/NP-A, Revision 0.4, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML22263A2852022-05-23023 May 2022 Alert and Notification System Evaluation Report_Ans Evaluation_Redacted Page 1-65 ML22119A1722022-04-13013 April 2022 Post-Accident Monitoring (PAM) Report ML21175A2472021-06-24024 June 2021 2020 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the....- ML21042B3212021-02-11011 February 2021 Stations, Units 1 & 2; Millstone Power Station, Units 2 & 3 - Request for Approval of Fleet Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML20246G7062020-08-24024 August 2020 Enclosure 4: Attachment 1 - PWROG-18005-NP, Revision 2, Determination of Unirradiated Rt and Upper-Shelf Values of the North Anna Units 1 and 2 Reactor Vessel Materials ML20203M1602020-07-20020 July 2020 VA Elec. & Power Co., Dominion Energy Nuclear Co. Inc., Dominion Energy Sc Inc., Millstone Power Station 2, N. Anna & Surry Power Stations 1 & 2, Virgil C. Summer Station 1, Updated Anchor Darling Double Disc Gate Valve Information & Status ML20149K6712020-05-31031 May 2020 PWROG-19047-NP, Revision 0, North Anna, Units 1 and 2, Reactor Vessels Low Upper-Shelf Fracture Toughness Equivalent Margin Analysis ML20140A2392020-05-18018 May 2020 ASME Section XI Inservicee Inspection Program Proposed Inservice Inspection Alternative N1-15-NDE-002 ML20246G7012020-03-31031 March 2020 Enclosure 4: Attachment 3 - WCAP-18364-NP, Rev. 1, North Anna Units 1 and 2 Time-Limited Aging Analysis on Reactor Vessel Integrity for Subsequent License Renewal (SLR) ML20090B3972020-03-26026 March 2020 Revised License Renewal Commitment Pressurizer Surge Line Weld Inspection Frequency ML20246G7072020-01-31031 January 2020 Enclosure 4: Attachment 4 - WCAP-11164-NP, Rev. 2, Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for North Anna Units 1 and 2 Nuclear Power Plants for the Subsequent License Renewal ML19249B7682019-08-29029 August 2019 Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated) ML19249B7722019-08-29029 August 2019 Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated) ML19249B7742019-08-29029 August 2019 Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated) ML19249B7782019-08-29029 August 2019 Enclosure 6 - Millstone Power Station, Unit 2, Comparison Matrix RCS Pot. Loss A.1 ML19106A3562019-04-23023 April 2019 Review of Steam Generator Tube Inspection Report for the Cycle 26 Spring 2018 Refueling Outage ML19011A1722019-01-0404 January 2019 Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up) ML19011A1732019-01-0404 January 2019 Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting Documents ML19011A1742019-01-0404 January 2019 Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting Documents ML20246G7092018-10-31031 October 2018 Enclosure 4: Attachment 2 - WCAP-18353-NP, Rev. 0, Reactor Internals Fluence Evaluation for a Westinghouse 3-Loop Plant with Two Units - Subsequent License Renewal ML18198A1192018-05-31031 May 2018 Attachment 5 to 18-233, ANP-3467NP, Rev. 0, North Anna Fuel-Vendor Independent Small Break LOCA Analysis Licensing Report ML14133A0112014-05-0707 May 2014 March 12, 2012 Information Request Phase 2 Staffing Assessment Report ML14080A0022014-03-31031 March 2014 PNNL-22553, Final Assessment of Manual Ultrasonic Examinations Applied to Detect Flaws in Primary System Dissimilar Metal Welds at North Anna Power Station. ML14092A4162014-03-31031 March 2014 Response to March 12, 2012 Information Request Seismic Hazard and Screening Report (CEUS Sites)For Recommendation 2.1 ML14283A0462014-02-28028 February 2014 MRP-375, Technical Basis for Reexamination Interval Extension for Alloy 690 PWR Reactor Vessel Top Head Penetration Nozzles (EPRI 3002002441), Attachment 1 ML13338A4482014-01-29029 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14006A1712014-01-23023 January 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for North Anna Power Station, Units 1 and 2, TAC Nos.: MF0998 and MF0999 ML13179A0152013-05-31031 May 2013 Units I and 2, Qualification of the ABB-NV and Wlop CHF Correlations in the Dominion VIPRE-D Computer Code ML12200A2162012-06-30030 June 2012 PNNL-21546 Evaluation of Manual Ultrasonic Examinations Applied to Detect Flaws in Primary System Dissimilar Metal Welds at North Anna Power Station ML12143A1352012-05-0808 May 2012 NDE Results for Steam Generator Hot Leg Nozzle Full Structural Weld Overlays. Part 1 of 2 ML12143A1362012-05-0808 May 2012 NDE Results for Steam Generator Hot Leg Nozzle Full Structural Weld Overlays. Part 2 of 2 ML11290A1702011-10-12012 October 2011 Root Cause Evaluation Re Dual Unit Trip Following August 23, 2011 Earthquake ML1023904192010-08-31031 August 2010 DOM-NAF-2, Rev. 0.2-A, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code. ML11187A3242010-06-30030 June 2010 Justification for Extension of Temper Bead Limit to 1000 Square Inches for WOL of P1 and P3 Materials ML1016203012010-06-30030 June 2010 Radial-Hydride-Induced Embrittlement of High-Burnup Zirlo Cladding Exposed to Simulated Cask Drying Conditions ML1026002162010-05-13013 May 2010 Engineering Transmittal, ET-CEP-10-0006, Revision 0, Evaluation of Aluminum Conduit Seal Penetration Fire Tests, Dated May 13, 2010, North Anna and Surry Power Stations Units 1 and 2 (Redacted Version), Enclosure 2 ML0930701642009-10-15015 October 2009 Technical Report No. EE-0116, Revision 5 ML0823304742008-08-13013 August 2008 Summary of Two Additional Facility Changes, Tests and Experiments, Not Included in Previous 03/28/2008 Submittal ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0809802292008-04-0404 April 2008 Stations - Request for Approval of Appendix C of Fleet Report DOM-NAF-2 Qualification of the Westinghouse WRB-2M CHF Correlation in the Dominion VIPRE-D Computer Code ML0806505632008-02-29029 February 2008 Supplemental Response to NRC GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML0727404002007-11-15015 November 2007 Corrective Actions for Generic Letter 2004-02 ML0716905022007-06-15015 June 2007 Order - EA 03-009 Sixty Day Report, Reactor Pressure Vessel (RPV) Head Inspection Results ML0731706782007-05-19019 May 2007 SCS-00684, Rev. Draft-2, Design Report, ASME Bp&V Section III, Class 3, SS-45S8-18622-NSR Ball Valve, SS-45XS8-18623-NSR Ball Valve, Enclosure 2 ML0611005122006-04-20020 April 2006 Virginia Electric and Power Company North Anna and Surry Power Stations 30-Day Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.26 ML0331700242003-10-13013 October 2003 American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI Relief Request CMP-020 ML0321104652003-07-18018 July 2003 Realistic Large Break Loss of Coolant Accident Analysis Results for Proposed TS Changes & Exemption Request for Use of Framatome Anp Advanced Mark-BW Fuel 2024-01-16 |
Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 13, 2022 U.S. Nuclear Regulatory Commission Serial No.22-118 Attention: Document Control Desk NAPS: RAP Washington, D.C. 20555 . Docket No. 50-338 License No. NPF-4 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGY VIRGINIA)
NORTH ANNA POWER STATION UNIT 1 POST ACCIDENT MONITORING (PAM) REPORT On March 6, 2022, with Unit 1 in Mode 1, the Channel 1 Wide Range Ex-Core Neutron Monitor, 01-NM-NFl-190~ 1, was found failed high, indicating 200% .. There was also a loss of trending noted on the Plant Computer System (PCS) and the indication on the Remote Monitoring Panel, 01-NM-NFl-190B2, located in the Fuel Building was also at 200%.
The cause of the inoperable neutron monitor is currently unknown. Troubleshooting to determine the cause of the failure will occur after the Unit 2 refueling outage has been completed and resources become available to support the effort. The associated repairs will occur at the nearest maintenance* opportunity. Technical Specification (TS) 3.3.3 Condition A requires restoration of the neutron monitor to operable within thirty days. If the neutron monitor is not returned to service within thirty days, a Post Accident Monitoring Report is required in accordance with TS 5.6.6. This letter provides the required report including our plan and schedule for restoring the neutron monitor to service.
Continued operation w,ith the neutron monitor inoperable is permitted because there is another train of wide range neutron monitoring that is operable. Both trains of the source range neutron monitors are operable if they become necessary. Additionally, the normal power range nuclear instruments (PRNI) are operable to provide power indication during normal plant operation:,*
- This report has been r~viewed and approved by the Facility Safety Review Committee.
If you have any quest.ions or require additional information, please contact Mr. Marcus Hofmann (540) 894-2190.
Serial No.22-118 Docket No. 50-338 PAM Report Page 2 of 3 Sincerely, Lisa Hilbert Site Vice President Commitments made in this letter: Repair and restoration to operability for 01-NM-NFl-190B1 at the nearest maintenance opportunity.
Serial No.22-118 Docket No. 50-338 PAM Report Page 3 of 3 cc: U.S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 NRC Senior Resident Inspector North Anna Power Station Mr. G.E. Miller NRC Senior Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 0-8 G9A 11555. Rockville Pike Rockville, Maryland 20852-2738