Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23345A1886 December 2023Fws to NRC Crystal River Species List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project
ML23290A12517 October 2023NEI - NEI 99-02, Rev. 8, Draft Regulatory Assessment Performance Indicator GuidelineSafe Shutdown
Boric Acid
Time of Discovery
High winds
Shutdown Margin
High Radiation Area
Half scram
Ultimate heat sink
Mission time
Offsite Dose Calculation Manual
Stroke time
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Coatings
Locked High Radiation Area
Significance Determination Process
Operability Determination
Frazil ice
Nonconservative Technical Specifications
Fuel cladding
Through-Wall Leakage
Scaffolding
Grace period
Power change
Downpower
Unidentified leakage
Integrated Public Alert and Warning System
Siren
ML23290A14717 October 2023NEI 99-02 Rev 8 Draft 9 29 2023 Redline VersionSafe Shutdown
Boric Acid
Time of Discovery
High winds
Shutdown Margin
High Radiation Area
Half scram
Ultimate heat sink
Mission time
Offsite Dose Calculation Manual
Stroke time
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Coatings
Locked High Radiation Area
Residual transfer
Significance Determination Process
Operability Determination
Frazil ice
Nonconservative Technical Specifications
Exemption Request
Fuel cladding
Through-Wall Leakage
Scaffolding
Grace period
Power change
Downpower
Unidentified leakage
Integrated Public Alert and Warning System
Siren
ML23270B83626 September 2023Code Case N-752 Audit September 26, 2023, E-mail Providing Additional Information Regarding the Use of Owner'S Requirements and Engineering Judgment in Lieu of Code and StandardsNondestructive Examination
Aging Management
License Renewal
Operational leakage
1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation29 June 2023Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation
1CAN062302, Enclosure 2: ANO-1 SAR Amendment 31 - Redacted Version20 June 2023Enclosure 2: ANO-1 SAR Amendment 31 - Redacted Version
ML23180A10820 June 2023ANO Unit 1 SAR Amendment 31, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary ReportCyber Security
Aging Management
Turbine Missile
ML23160A2969 June 2023Response to Crystal River, Unit 3 Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan
ML23160A2979 June 2023CR3 Site Characterization Survey Report (CHAR-01) Impacted Open Land Survey Areas
ML23160A2989 June 2023Site Characterization SurveysTritium Exit Sign
High Radiation Area
Locked High Radiation Area
3F0623-02, Maintenance Support Building9 June 2023Maintenance Support Building
ML23107A2737 June 2023Orise Independent Survey Report Dcn 5366-SR-01-0
ML23157A1066 June 2023NEI 19-01, Rev 1, Safety and Economic Benefits of Accident Tolerant FuelUltimate heat sink
Probabilistic Risk Assessment
Coatings
Cyber Security
FLEX
Significance Determination Process
Fuel cladding
Fire Watch
Power change
ML23129A0282 May 202320230502, NEI Issues for Event Notification Implementation WorkshopsTime of Discovery
Contraband
ML23110A67618 April 202304-18-23_NRC_NEI 23-03 Review + EndorseSafe Shutdown
High Radiation Area
Anticipated operational occurrence
Probabilistic Risk Assessment
Aging Management
Exemption Request
Commercial Grade
Pandemic
Fuel cladding
ML23073A39831 March 2023TMI-2 ISFSI Biennial Update Report for 2023Coatings
Incorporated by reference
Aging Management
Fire Watch
Scaffolding
Grace period
ML23138A16624 March 2023Transmittal of NEI 22-05 Revision a, Technology Inclusive Risk Informed Change Evaluation (Tirice) Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07Safe Shutdown
High winds
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Probabilistic Risk Assessment
Incorporated by reference
License Renewal
Earthquake
Turbine Missile
Fuel cladding
Fire Protection Program
Scaffolding
Fatality
Power Uprate
Overspeed trip
ML23083B46224 March 2023Transmittal of NEI 22-05 Revision a, Technology Inclusive Risk Informed Change Evaluation (Tirice) Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07Safe Shutdown
High winds
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Probabilistic Risk Assessment
Incorporated by reference
License Renewal
Earthquake
Turbine Missile
Fuel cladding
Fire Protection Program
Scaffolding
Fatality
Power Uprate
Overspeed trip
TMI-23-005, Updated Spent Fuel Management Plan21 March 2023Updated Spent Fuel Management Plan
ML23125A3201 March 2023Guidance for the Evaluation of Changes to Facilities Utilizing NEI 18-04 and NEI 21-07 Revision a 5-4-23 Tirice Response to NRC CommentsSafe Shutdown
High winds
Ultimate heat sink
Stroke time
Probabilistic Risk Assessment
Incorporated by reference
License Renewal
Earthquake
Turbine Missile
Fuel cladding
Fire Protection Program
Scaffolding
Power change
Downpower
Fatality
Power Uprate
Overspeed trip
ML23088A21731 December 2022Relief Request for Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 - Technical Report, ANP-4023NP, Revision 0, December 2022Boric Acid
Nondestructive Examination
Liquid penetrant
ML22335A4631 December 2022Chronology of Significant Events in Operator Licensing Since the Three Mile Island Accident (1979)Significance Determination Process
Job Performance Measure
Generic Fundamentals Examination
License Renewal
Earthquake
Pandemic
Coronavirus
COVID-19
ML22298A22825 October 2022NEI 15-09, Rev. 1, Cybersecurity Event NotificationsSafe Shutdown
Time of Discovery
High Radiation Area
Cyber Security
ML22297A24820 October 2022NEI Comments on 10-20-2022 CCF Meeting Feedback and Comments
ML23072A06330 September 2022(Draft) NEI White Paper Remediation of Vulnerabilities Identified in CDAs - 08302022R0Cyber Security
ML22269A3887 September 202202-Gamma Spectroscopy of Concrete Pucks
ML22195A16931 July 2022NEI, Draft G of NEI 99-01, Development of Emergency Action Levels for Non-Passive Reactors, Revision 7 - Change SummaryHigh winds
Internal Flooding
Earthquake
ML22195A16714 July 2022NEI, Draft G of NEI 99-01, Development of Emergency Action Levels for Non-Passive Reactors, Revision 7Safe Shutdown
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Incorporated by reference
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Safeguards Contingency Plan
Battery sizing
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Backfit
ML22195A16814 July 2022NEI, Marked-Up to Draft G of NEI 99-01, Development of Emergency Action Levels for Non-Passive Reactors, Revision 7Safe Shutdown
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Incorporated by reference
FLEX
Fukushima Dai-Ichi
Process Control Program
Spent Fuel Pool Instrumentation
Safeguards Contingency Plan
Battery sizing
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Backfit
Unidentified leakage
3F0522-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 202217 May 2022Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2022High Radiation Area
Non-Destructive Examination
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Process Control Program
Commercial Grade
Fire Protection Program
Grace period
Overexposure
ML22109A2088 April 2022April 8, 2022, NEI White Paper on Digital Instrumentation and Control Common Cause Policy Considerations Version 2.0
ML22101A07923 March 2022TMI2-EN-RPT-0001, Revision 1, Determination of the Safe Fuel Mass Limit for DecommissioningGrab sample
TMI-22-008, 2021 Aircraft Movement Data Annual Report for TMI-128 February 20222021 Aircraft Movement Data Annual Report for TMI-1
2CAN022202, Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods24 February 2022Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third PeriodsVT-2
Large early release frequency
Liquid penetrant
ML22048A58116 February 2022NEI 22-02: Guidelines for Weather-Related Administrative Controls for Short Duration Outdoor Dry Cask Storage OperationsHigh winds
Tornado Missile
Very Low Safety Significance Issue Resolution
ML22019A29212 January 2022NEI, Submittal of Proposed Revisions to Aging Management Programs XI.M33, Selective Leaching and XI.E3, Inaccessible Power Cables Not Subject to 10 CFR 50.49 Environmental Qualification RequirementsCoatings
Nondestructive Examination
Aging Management
ML21343A28231 December 2021Redline/Strikeout Version of NEI 21-07 Rev 0-B, Technology Inclusive Guidance for Non-Light Water Reactors Safety Analysis Report Content for Applicants Using the NEI 18-04 MethodologyHigh winds
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Incorporated by reference
Design basis earthquake
Earthquake
Maintenance Rule Program
Turbine Missile
Fatality
ML22105A09316 December 2021Attachment 3 - RSCS Technical Support Document (Tsd) No. 21-078 Rev 00 TMI-2 Source Term Limitations and Administrative Controls to Prevent Exceeding the 1 Rem EPA PAGFire Protection Program
ML21343A2928 December 2021NEI, Transmittal of NEI 21-07 Revision 0-B, Technology Inclusive Guidance for Non-Light Water Reactor Safety Analysis Report: for Applicants Utilizing NEI 18-04 MethodologyHigh winds
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Incorporated by reference
Design basis earthquake
Earthquake
Maintenance Rule Program
Turbine Missile
Fatality
ML21337A3803 December 2021NEI Technical Report NEI 17-06 - Guidance on Using Iec 61508 SIL Certification to Support the Acceptance of Commercial Grade Digital Equipment for Nuclear Safety Related Applications, Revision 1Commercial Grade Dedication
Cyber Security
ML21305A00130 November 2021NEI 17-06 Rev 0 Draft B, Guidance on Using Iec 61508 SIL Certification to Support the Acceptance of Commercial Grade Digital Equipment for Nuclear Safety Related Applications (Staff Comments IncorporatedCommercial Grade Dedication
Cyber Security
ML21342A16829 October 2021Letter from W. Gross to S. Atack, Endorsement of Nuclear Energy Institute 10-04, Identifying Systems and Assets Subject to the Cyber Security Rule, Revision 3, Dated October 29, 2021Safe Shutdown
Met Tower
Cyber Security
Fire Protection Program
ML21342A20329 October 2021Letter from W. Gross to S. Atack, Endorsement of Nuclear Energy Institute 13-10, Cyber Security Control Assessments, Revision 7, Dated October 29, 2021Cyber Security
Scaffolding
0CAN102102, Units 1 and 210 CFR 50.71(e) Report Revision 20 of the ANO Fire Hazards Analysis6 October 2021Units 1 and 210 CFR 50.71(e) Report Revision 20 of the ANO Fire Hazards Analysis
CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L6 October 2021Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L
ML21274A0311 October 2021NRC Draft Detailed Comments Related to NEI 21-07, Revision 0, Technology Inclusive Guidance for Non-Light Water Reactors Safety Analysis Report Content for Applicants Using the NEI 18-04 MethodologySafe Shutdown
High winds
Anticipated operational occurrence
Probabilistic Risk Assessment
Coatings
Incorporated by reference
Design basis earthquake
Earthquake
Maintenance Rule Program
Turbine Missile
Fatality
ML21272A30330 September 2021Technology Inclusive Content of Application Project (Ticap) for Non-Light Water Reactors Westinghouse Evinci; Micro-Reactor Tabletop Exercise ReportSafe Shutdown
Ultimate heat sink
Anticipated operational occurrence
Probabilistic Risk Assessment
Tristructural Isotropic
ML21278A47230 September 2021NEI 20-07, Rev. Draft, Guidance for Addressing Common Cause Failure in High Safety-Significant Safety-Related Digital I&C SystemsSafe Shutdown
Anticipated operational occurrence
Probabilistic Risk Assessment
Incorporated by reference
Large early release frequency
ML21237A05125 August 2021Follow-on Risk Informed Performance Based Implementation Guidance Needed for Advanced Non-Light Water ReactorsNon-Destructive Examination
Safe Shutdown Earthquake
Enforcement Discretion
Probabilistic Risk Assessment
Cyber Security
Missed surveillance
Significance Determination Process
Surveillance Frequency Control Program
Large early release frequency
Time Critical Operator Action
Low Safety Significance Issue Resolution
Generic Issues Program
Fire Protection Program
ML21257A23519 August 2021Rulemaking: Proposed Rule: Advanced Reactor Physical Security, Email Exchange Between Nrc and NEI Draft Pages from NEI-20-05 Rev. E