RA24-008, Post-Outage Inservice Inspection (ISI) Summary Report20 June 2024Post-Outage Inservice Inspection (ISI) Summary Report
RS-24-014, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors22 February 2024Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and ErrorsGNF3
ML23181A15230 June 2023Attachment 2 - LaSalle County Station Units 1 and 2, Pressure and Temperature Limits Report (PTLR) Up to 54 Effective Full-Power Years (Efpy), Revision 3Hydrostatic
Pressure and Temperature Limits Report
RS-23-066, Containment Post-Tensioning System Inservice Inspection Basis for Proposed Extension of Examination Interval Technical Report3 May 2023Containment Post-Tensioning System Inservice Inspection Basis for Proposed Extension of Examination Interval Technical ReportIncorporated by reference
Fuel cladding
RA22-060, Regulatory Commitment Change Summary Report30 November 2022Regulatory Commitment Change Summary ReportAnchor Darling
ML22332A45410 November 2022Attachment 6 - LaSalle County Generating Station Units 1 and 2 Pressure and Temperature Limits Report (PTLR) for 54 Effective Full-Power Years (EFPY) (Non-Proprietary)Hydrostatic
Pressure and Temperature Limits Report
ML22332A45510 November 2022Attachment 7 - BWRVIP-135, Revision 4: BWR Vessel Internals Project Integrated Surveillance Program (ISP) Data Source Book and Plant Evaluations (Non-Proprietary Version)
NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits30 June 2022Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air SuitsMururoa
RS-22-018, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station22 February 2022Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station
RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.54 November 2021Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5Earthquake
Affidavit
GNF3
Water rod
ML21265A55830 June 2021Attachment 5: Appendix C, NEI 12-16 Criticality Analysis ChecklistAging Management
GNF3
RA21-016, Netco Rack Insert 10-year Surveillance Report15 April 2021Netco Rack Insert 10-year Surveillance Report
RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping4 January 2021Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel PipingNondestructive Examination
ML20303A17523 October 2020Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting
RS-20-133, Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.6916 October 2020Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.69Safe Shutdown
Mission time
Probabilistic Risk Assessment
Squib
Incorporated by reference
Seismically rugged
Large early release frequency
Earthquake
Failure to Scram
ML20085F86124 March 2020Corrected Drawing for One-Line Electric Power Supply for Lasalle Hardened Containment Vent System (HCVS) Final Integrated Plan (FIP)
RA20-015, Triennial Chlorine Survey Report20 March 2020Triennial Chlorine Survey Report
RS-20-024, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors9 March 2020Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors
ML19228A02315 August 2019Proposed Alternative to Utilize Code Case N-879Affidavit
RA19-005, Regulatory Commitment Change Summary Report14 January 2019Regulatory Commitment Change Summary ReportAnchor Darling
RA18-110, Submittal of 2017 Regulatory Commitment Change Summary Report27 December 2018Submittal of 2017 Regulatory Commitment Change Summary Report
RS-18-131, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions14 December 2018Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident ConditionsHigh winds
Ultimate heat sink
Tornado Missile
Hydrostatic
FLEX
Design basis earthquake
Severe Accident Management Guideline
Hardened vent
ML18024A27716 August 2018Lessons Learned from Us NRC Response to the February 2017 LaSalle County Station Unit 2 High Pressure Core Spray Injection Valve FailurePast operability
Enforcement Discretion
Probabilistic Risk Assessment
Anchor Darling
Functionality Assessment
RA17-072, Post Accident Monitoring Report2 August 2017Post Accident Monitoring ReportPost Accident Monitoring
RA17-069, Post Accident Monitoring Report21 July 2017Post Accident Monitoring ReportPost Accident Monitoring
RS-17-025, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal8 March 2017Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary SubmittalSafe Shutdown
Internal Flooding
Hydrostatic
FLEX
Fukushima Dai-Ichi
Flooding Focused Evaluation
ML16355A41811 January 2017Flood Hazard Mitigation Strategies AssessmentUltimate heat sink
FLEX
Fukushima Dai-Ichi
Flood Hazard Mitigation Strategies Assessment
RA16-092, Regulatory Commitment Change Summary Report27 December 2016Regulatory Commitment Change Summary Report
RS-16-182, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal28 October 2016Mitigating Strategies Flood Hazard Assessment (Msfha) SubmittalUltimate heat sink
Hydrostatic
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Hardened vent
ML16305A29627 October 20160000-0163-8881-R0-NP, Revision 0, Exelon Nuclear LaSalle County Generating Station Units 1 & 2 Pool Swell Response.
ML16167A5026 September 2016UFSAR, Rev 22, Chap 09 Figures Part 12 of 14 - Redacted
ML16167A4466 September 2016MF7633 and MF7634, UFSAR, Las Fpr Rev._Redacted
RS-16-125, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident31 August 2016Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentSafe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
ML16224A78626 August 2016Notice of Availability of the Final Plant-Specific Supplement 57 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding LaSalle County Station, Units 1 and 2 (TAC Nos. MF5567 and MF5568)License Renewal
ML16200A15618 July 2016Report on the Safety Aspects of the License Renewal Application of the LaSalle County Station, Units 1 and 2Coatings
Nondestructive Examination
Aging Management
Stress corrosion cracking
License Renewal
EVT-1
RS-15-300, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident..16 December 2015Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident..High winds
Tornado Missile
FLEX
Tornado Missile Protection
Design basis earthquake
Hardened vent
Scaffolding
GOTHIC
Power Uprate
RA15-075, Transmittal of the 2014 Regulatory Commitment Change Summary Report20 November 2015Transmittal of the 2014 Regulatory Commitment Change Summary ReportCyber Security
ML15107A15421 April 2015Final Accident Sequence Precursor Analysis for the April 17, 2013, Dual Unit Loss of Offsite PowerMission time
Anticipated operational occurrence
Significance Determination Process
Pressure Boundary Leakage
Through-Wall Leak
RS-15-004, County Station Introduction of Lead Use Assemblies20 January 2015County Station Introduction of Lead Use AssembliesShutdown Margin
Anticipated operational occurrence
Channel-control blade interference
ML14352A19018 December 20147491-318563-HAO-1, Rev. 2, LaSalle Requested DocumentsPower Uprate
Affidavit
RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 124 September 2014Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1Through-Wall Leak
ML14177A85930 June 2014Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant AccidentUnanalyzed Condition
High Radiation Area
Operator Manual Action
Fukushima Dai-Ichi
Earthquake
ML14176A96124 June 2014Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014Fire Barrier
Coatings
Foreign Material Exclusion
ML14057A54926 February 2014Supplemental Information Supporting License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature (Pit) CurvesLicense Renewal
Power Uprate
RS-14-054, LaSalle, Unit 1, Supplemental Information Supporting License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature (Pit) Curves26 February 2014LaSalle, Unit 1, Supplemental Information Supporting License Amendment Request to Revise Reactor Coolant System (RCS) Pressure and Temperature (Pit) CurvesLicense Renewal
Power Uprate
ML14030A22321 February 2014Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
B.5.b
Fukushima Dai-Ichi
Frazil ice
Battery sizing
Earthquake
Hardened vent
GOTHIC
ML14042A32519 February 2014Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for LaSalle County Station, Units 1 and 2, TAC Nos.: MF1121 and MF1122Safe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Operating Basis Earthquake
Emergency Lighting
FLEX
B.5.b
Fukushima Dai-Ichi
Frazil ice
Battery sizing
Earthquake
Hardened vent
GOTHIC
ML13358A36520 December 2013Attachment 5: LaSalle County Station, Unit 1, Pressure/Temperature Limits ReportHydrostatic
ML13344A9829 December 20132012 Regulatory Commitment Change Summary ReportB.5.b
ML13282A3504 October 2013Final Report, Assessment of Wind Speeds Over the LaSalle County Station Ultimate Heat Sink.Ultimate heat sink