Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23178A03527 June 2023Senior Reactor and Reactor Operator Initial License Examinations
RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations16 June 2023Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations
ML23017A1125 December 2022Final QA Related FormsJob Performance Measure
ML22235A72014 June 2022Administrative FilesJob Performance Measure
ML22299A01011 May 2022Final Qa/Related FormsJob Performance Measure
RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations25 March 2022Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations
ML20115E46114 February 2022NRC Comments on Draft Licensee-Developed Operating Test (Folder 2)Stroke time
ML22045A94114 February 2022Senior Reactor and Reactor Operator Initial License Examinations
ML22025A37225 January 2022NRC Comments on Draft Licensee-Developed Operating Test (Folder 2)
ML21257A44618 August 2021Final QA Related Forms (Folder 1)Job Performance Measure
LG-21-019, 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2)9 April 202175-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2)
ML21069A14310 March 2021Senior Reactor and Reactor Operator Initial License Examinations
ML21062A1953 March 2021Revised Written Examination (Parent Questions File) (Regional Audit Corrective Action)(Folder 2)Shutdown Margin
Overtravel
ML21050A08419 February 2021Final Qa/Related Forms (Folder 1)
ML21050A11919 February 2021Final Written Examination and Operating Test Outlines (Folder 3)
ML21050A18119 February 2021Revised NRC Comments on Draft Licensee-Developed Written Exam (Regional Audit Corrective Action)(Folder 2)Half scram
ML21050A22719 February 2021Revised Final Written Examination with Answer Key (401-5 Format)(Regional Audit Corrective Action)(Folder 3)Shutdown Margin
High Radiation Area
Half scram
Squib
Locked High Radiation Area
Overtravel
Early Warning Fire Detection
Power change
ML21043A20712 February 2021Handouts to Applicants (Folder 3)
ML21043A22012 February 2021Draft Written Examination and Operating Test Outlines (Folder 2)
ML21040A4719 February 2021Revised Form ES-301-5 (Regional Audit Corrective Action)(Folder 1)
ML21040A4839 February 2021Revised Form ES-401-4 (Regional Audit Corrective Action)(Folder 2)
ML21012A26912 January 2021Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021Generic Fundamentals Examination
COVID-19
ML20261H40317 September 2020Senior Reactor and Reactor Operator Initial License Examinations
ML21056A22130 June 2020Final Qa/Related Form - Form ES-401-6 (Folder 1)
ML20184A24730 June 2020Final Operating Test (Sections a, B, and C) (Folder 3)Half scram
Job Performance Measure
Scram Discharge Volume
Overtravel
Fuel cladding
Offsite Circuit
Power change
ML20184A24830 June 2020Final Written Examination with Answer Key (401-5 Format) (Folder 3)Safe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Grab sample
Time to boil
Scram Discharge Volume
Overtravel
Fuel cladding
Offsite Circuit
Power change
Coast down
ML20260H16330 June 2020NRC Comments on Draft Licensee-Developed Written Exam (Folder 2)
ML20260H16430 June 2020NRC Comments on Draft Licensee-Developed Operating Test (Folder 2)
ML20260H16530 June 2020Draft Written Examination and Operating Test Outlines (Folder 2)
ML20260H16630 June 2020Draft Written Examination (Folder 2), Test Answer KeySafe Shutdown
Boric Acid
Offsite Circuit
Coast down
ML20260H16730 June 2020Draft Operating Test (Section a, Section B, Section C) (Folder 2)Scram Discharge Volume
Fuel cladding
Offsite Circuit
ML21056A22030 June 2020Final Qa/Related Forms (Folder 1)
ML21056A22330 June 2020Final Written Examination and Operating Test Outlines (Folder 3)Shutdown Margin
Scram Discharge Volume
ML20147A16626 May 2020Operator Licensing Examination Approval
ML19352D65716 December 2019Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020Generic Fundamentals Examination
ML19325C14319 November 2019Operator Licensing Examination Approval
ML19275E46230 September 2019Senior Reactor and Reactor Operator Initial License Examinations
RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations16 May 2019Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations
ML19107A38217 April 2019Senior Reactor and Reactor Operator Initial License Examinations
ML18323A31519 November 2018Operator Licensing Examination Approval
ML18128A0067 May 2018Senior Reactor and Reactor Operator Initial License Examinations
RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations25 April 2018Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations
ML18116A05425 April 2018Senior Reactor and Reactor Operator Initial License Examinations
ML18067A43027 March 2018NRC Comments on Draft Licensee-Developed Operating Test (Folder 2)
ML18079A54627 March 2018Final Qa/Related Forms (Folder 1)Probabilistic Risk Assessment
Job Performance Measure
ML18079A81227 March 2018Final Qa/Related Forms - Form ES-401-6 and Form ES-401-9 (Folder 1)
ML18088A66227 March 2018Draft Operating Test (Section a, Section B, Section C) (Folder 2)Half scram
Grab sample
Water Inventory Control
Probabilistic Risk Assessment
Squib
Job Performance Measure
Power change
Unidentified leakage
ML18088A66427 March 2018Final Written Examination and Operating Test Outlines (Folder 3)Half scram
Offsite Circuit
ML18067A4178 March 2018Draft Written Examination and Operating Test Outlines (Folder 2)Half scram
Offsite Circuit
ML18067A4168 March 2018Draft Written Examination (Folder 2)Reactor Vessel Water Level
Half scram
Grab sample
Water Inventory Control
Time to boil
Missed surveillance
Scram Discharge Volume
Overtravel
Offsite Circuit
Power change
Unidentified leakage
Siren