ML20136C20523 March 1979Summary Work List Re Various Instruments & Sys. Radiological Ref 130
ML20125D89220 February 1979on 780329,reactor Tripped on Pump Power Trip,Followed by Rapid Depressurization of Rcs.Caused by De Energizing of Vital Power Supply 2-4.Review Underway Re Isolation, Surveillance & Operating Procedures
ML20136C06520 February 1979Site Problem Rept 198 Re Inability to Adjust Delta Flux Difference Amplifiers to Obtain K Factors Greater than Five Per Results of Tp 800/18,power Imbalance Detector Correlation Test.Old & New Wiring Diagrams Encl
ML20136C08715 October 1978Site Problem Rept 191 Re a & B Makeup Pump Gear Lube Oil Sys.Bearing Pressure Not Obtainable Due to Installed Pressure Gauge Located Downstream of Spray Throttle Valve. Addl Gauges Installed Per Attached Diagram
ML20136C03812 July 1978Site Problem Rept 174 Re Zero Ground Condition Discovered in 2A Reactor Coolant Pump Motor Between Upper & Lower Bearing Housings & Motor Casing.Caused by Positioning of Burns & Roe Oil Spill Retainer Housing
ML20136C69916 May 1978Work Request Approval for Calibr & Installation of Probes for Reactor Coolant Pump
ML20136C66710 May 1978Application to Remove Auxiliary Bldg Sump Pump WDL-T-5 from Svc for Replacement of Ruptured Disc
ML20125B45328 April 1978Startup Problem Rept 2690:on 780222,WDL-C-1A/B Tube Side Did Not Have Proper Overpressure Protection.Burns & Roe Proposed Solution on 780405.Action Completed Satisfactorily on 780428
ML19212A47616 March 1978Chronological Summary of safety-related Maint & Operating Experience for 12-month Period Ending 771231Packing leak
ML20125B45815 March 1978Startup Problem Rept 5314:on 780314,radwaste Gas Release Rate of 90 Scfm Could Not Be Obtained.On 780317,flow Rate of 65 Scfm Determined Acceptable by Burns & Roe
ML19252A29220 January 1978Responds to NRC 780105 Questionnaire Re Standby Diesel Generator Unit Reliability
ML20136C0616 January 1978Site Problem Rept 152,Revision 1,re Failure of Makeup Pump Gear Oil Cooler to Meet Spec CS3-113 Paragraph 3.5 of Tubular Exchanger Manufacturers Association Stds.Spec Incomplete & Will Be Revised.Supporting Matl Encl
ML20136C04221 December 1977Site Problem Rept 161:during Ultrasonic Insp of 1A Flywheel, Insp Cover Bolt Was Trapped Between Flywheel & Shroud Covering Flywheel,Preventing Shaft Rotation.Bolt Removed & Flywheel Inspected
ML20136C04613 December 1977Site Problem Rept 157 Re Bump on Stuffing Box Seating Surface Formed by Depression of Lower Gasket Seating Surface During Disassembly of 1A Reactor Coolant Pump.Caused by Pressure Used to Break 1B & 2B Pumps Free
ML20125B47817 November 1977Startup Problem Rept Re Condensate
ML20136C0488 November 1977Site Problem Rept 149 Re Difference in Actual Range Between Hot & Cold Marks in Constant Load Supports of Reactor Coolant Pumps & Specified Range.Startup Problem Repts 2299 & 2436 Re Reactor Coolant Sys Encl
ML20136C67726 October 1977Surveillance Rept of RCS Valve RC-RV-2 from Mechanical Maint Dept.Work Requests Encl
ML20136C09629 September 1977Site Problem Rept 125,Revision 1,re Failure of Matl in Makeup Pump Stretched Studs to Meet Requirements of Certificate of Conformance.Ke Moore 790712 Memo to RP Williamson Re Necked Makeup Pump Case Stud Encl
ML20136C0921 September 1977Site Problem Rept 135 Re Malfunctioning of Tektro Pressure Control Valve for High Pressure Lube Oil Sys on Reactor Coolant Pump Motor 1A.Valve Disassembled & Cleaned,But Will Not Hold Pressure & Will Not Relieve
ML20136C73330 August 1977TMI Startup Problem Rept on 770830:valve RC-V2 Cracked Off Seat & RC-R2 Started Relieving Pressure.Solenoid Plunger Realigned & New Springs Installed.Work Requests & Notes Encl
ML20136C07811 August 1977Site Problem Rept 111 Re Corrections to Computer Point Listing.Bailey 855 Startup Problem Rept 2084 Encl
ML20136C08424 June 1977Site Problem Rept 109 Re Reactor Protection Sys & Resistance Temp Detector Re Test Data.Resistance Temp Detector Retested & Reworked W/Design Improvement Retested.Results Encl
ML20136C05720 June 1977Site Problem Rept 127 Re Standpipe Gasket Interference W/ Shaft in 2B Reactor Coolant Pump Motor.Pan Was Dropped,New Gaskets & New O-ring Installed.Motor Subsequently Was Successfully no-load Run.No Further Action Required
ML20136C03520 June 1977Site Problem Rept 127 Re Standpipe Gasket Interfering w/2B Reactor Coolant Pump Shaft on 770516.Pan Dropped & New Gaskets & New O-ring Installed.Motor Subsequently Successful During no-load Run.No Further Action Required
ML20136C06728 February 1977Site Problem Rept 113 Re Reactor Protection Sys Inputs. Startup Problem Rept 2089 & Response Encl
ML20136C0757 February 1977Site Problem Rept 112 Re Safety Features Actuation Sys & Reactor Protection Sys Errors.Startup Problem Repts 2087 & 2088 Encl
ML19249F17513 August 1975Energy Absorption in Size 24 Figure 607 Valve Seat & Disk.
ML19276H2136 September 1973Rept on Containment Bldg Vertical Tendon Upper Bearing Plates.Design basis earthquake
Scaffolding
ML19276H21130 June 1972Containment Bldg Ring Girder Const & Repair,Addendum 2.Scaffolding
ML19276H1099 May 1969Summary of Factory Tests,Reactor Bldg Fan Assemblies, Prepared by American Air Filter Co