 Issue dateTitleTopic
ML20198M4208 July 2020William Bill Sprinkle, Response to Apparent Violation, IA-20-018Stroke time
Hydrostatic
COVID-19
CNL-15-047, Submittal of Pre-Operational Test Instruction, 2-PTI-062-03, Rev 0, Hft - Charging and Letdown.5 March 2015Submittal of Pre-Operational Test Instruction, 2-PTI-062-03, Rev 0, Hft - Charging and Letdown.Boric Acid
Temporary Modification
CNL-15-026, Submittal of Pre-operational Test Instruction5 February 2015Submittal of Pre-operational Test InstructionGrab sample
Temporary Modification
Scaffolding
CNL-15-024, Submittal of Pre-operational Test Instruction 2-PTI-043-02, Rev. 0, Primary Sampling System5 February 2015Submittal of Pre-operational Test Instruction 2-PTI-043-02, Rev. 0, Primary Sampling SystemBoric Acid
Grab sample
Stroke time
Temporary Modification
CNL-15-025, Submittal of Pre-operational Test Instruction 2-PTI-999-01, Rev. 0, Operational Vibration Testing5 February 2015Submittal of Pre-operational Test Instruction 2-PTI-999-01, Rev. 0, Operational Vibration Testing
CNL-14-230, Submittal of Pre-operational Test Instruction, 2-PTI-074-02B, Rev. 0, RHR Hft Heatup/Cooldown7 January 2015Submittal of Pre-operational Test Instruction, 2-PTI-074-02B, Rev. 0, RHR Hft Heatup/CooldownTemporary Modification
CNL-14-219, Submittal of Pre-operational Test Instruction, 2-PTI-999-02, Rv. 0, Thermal Expansion7 January 2015Submittal of Pre-operational Test Instruction, 2-PTI-999-02, Rv. 0, Thermal ExpansionTemporary Modification
Scaffolding
ML14080A02311 March 2014Submittal of Pre-Operational Test InstructionReactor Vessel Water Level
Temporary Modification
ML14055A27618 February 2014Pre-Operational Test Instruction 2-PTI-063-01, Safety Injection System SIS Integrated Test.Reactor Vessel Water Level
Temporary Modification
Arc flash
ML14016A47416 January 2014Request for Additional Information Concerning Material Control and Accounting Regarding Part 70 License Renewal (TAC No. L33242)
ML14015A0317 January 2014Watts Bar Nuclear Plant, Unit 2, Submittal of Pre-op Test Instructions
ML13226A1307 August 2013Submittal of Pre-Op Test InstructionsStroke time
Temporary Modification
Scaffolding
ML14055A27719 June 2013Pre-Operational Test Instruction 2-PTI-068-11, Cross Calibration of RCS Temperature Sensors.Temporary Modification
ML13091A03726 March 2013Submittal of Pre-op Test Instructions for Condenser Vacuum and Flood Mode BorationArc flash
ML13071A3246 March 2013Submittal of Pre-op Test InstructionPressure and Temperature Limits Report
ML12320A2959 November 2012Submittal of Pre-op Test Instructions 2-PTI-003B-04, Auxiliary Feedwater Pumps & Valves Logic Test and 2-PTI-092-01, Power Range Nuclear InstrumentationStroke time
Arc flash
ML12234A40415 August 2012Submittal of Pre-Op Test InstructionStroke time
ML12163A3715 June 2012Submittal of Pre-op Test Instruction, 2-PTI-067-01, Revision 0Stroke time
Arc flash
ML12041A3937 February 2012Submittal of Pre-op Test InstructionsScaffolding
ML12019A27217 January 20122-PTI-030L-01, Rev. 0, Watts Bar Nuclear Plant (WBN) Unit 2 - Submittal of Pre-op Test Instruction.
ML11363A01022 December 2011Submittal of Pre-op Test Instruction No. 2-PTI-099-04, Rev 0, Safeguards System
ML11294A43819 October 2011Submittal of Pre-op Test InstructionStroke time
Arc flash
ML11279A1324 October 2011Submittal of Pre-op Test Instruction
ML11256A0498 September 2011Submittal of Pre-op Test Instruction No. 2-PTI-067-03, Rev. 0, ERCW Valve Logic Test.Stroke time
ML11088044925 March 2011Submittal of Pre-Op Test Instruction
ML1106912157 March 2011Submittal of Pre-op Test InstructionsStroke time
Scaffolding
ML10361011421 December 2010Submittal of Pre-op Test InstructionStroke time
ML10203013112 July 2010Submittal of Preoperational Test InstructionsStroke time
ML1109604472 July 2009Technical Instruction TI-137, Revision 0, Control of Portable Two-Way Radios.
ML0834601779 December 2008Unit 2 - Licensing Basis Preservation and Construction Refurbishment Program for Structures, Systems and Components (Sscs)Safe Shutdown
Boric Acid
Fitness for Duty
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Coatings
Nondestructive Examination
Emergency Lighting
Condition Adverse to Quality
Tornado Missile Protection
Scram Discharge Volume
Process Control Program
Safeguards Contingency Plan
Hemyc
License Renewal
Earthquake
Maintenance Rule Program
Control of Heavy Loads
Turbine Missile
Fuel cladding
Offsite Circuit
Fire Protection Program
Brachytherapy
Fire Watch
Backfit
Flow Induced Vibration
Uranium Hexafluoride
ML08326067130 April 2008Package of Nuclear Safety Review Staff Repts for Which Complete Resolution of safety-related Issues Not Achieved. W/One Oversize Drawing. Continuation of Nuclear Safety Review Staff ReptsSafe Shutdown
Pressure Boundary Leakage
Pressure boundary leak
Scaffolding
ML06270002727 September 2006Enclosure 1 Written Examination Performance Analysis with Recommended Substance Changes
ML05215003322 July 2005NPDES Permit No. TN0020168 - Phase II 316(b) Rule for Existing Facilities - Proposal for Information Collection for Supplemental Condenser Cooling Water System