ML19224B50912 August 2019Notice of Violation, NRC Investigation Report 4-2019-004Fitness for Duty
IR 05000298/201500722 June 2015IR 05000298/2015007; on 04/06/2015 - 05/08/2015; Cooper Nuclear Station; Component Design Basis Inspection and Notice of ViolationSafe Shutdown
Stroke time
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Condition Adverse to Quality
Aging Management
Tornado Generated Missile
Significance Determination Process
Job Performance Measure
Tornado Missile Protection
Large early release frequency
Operability Determination
Time Critical Operator Action
Earthquake
Failure to Scram
ML15173A45022 June 2015IR 05000298/2015007; on 04/06/2015 - 05/08/2015; Cooper Nuclear Station; Component Design Basis Inspection and Notice of ViolationSafe Shutdown
Stroke time
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Condition Adverse to Quality
Aging Management
Tornado Generated Missile
Significance Determination Process
Job Performance Measure
Tornado Missile Protection
Time Critical Operator Action
Earthquake
IR 05000298/20130099 May 2013IR 05000298-13-009; March 11-28, 2013; Cooper Nuclear Station, Biennial Baseline Inspection of the Identification and Resolution of Problems and Notice of ViolationSafe Shutdown
Internal Flooding
Temporary Modification
Significance Determination Process
Operability Determination
Fatigue Rule
Operability Assessment
ML13130A0379 May 2013IR 05000298-13-009; March 11-28, 2013; Cooper Nuclear Station, Biennial Baseline Inspection of the Identification and Resolution of Problems and Notice of ViolationSafe Shutdown
Internal Flooding
Temporary Modification
Significance Determination Process
Fatigue Rule
ML12314A3729 November 2012IR 05000298-12-004; 06/27/2012 - 09/26/2012; Cooper Nuclear Station, Integrated Resident and Regional Report; Equipment Alignment, Licensed Operator Requalification Program and Licensed Operator Performance, Maintenance Risk Assessments andSafe Shutdown
Mission time
Stroke time
Safe Shutdown Earthquake
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Functionality Assessment
Condition Adverse to Quality
Corrosion bonding
Significance Determination Process
Earthquake
Maintenance Rule Program
Fuel cladding
Scaffolding
Power change
Coast down
NLS2012020, Response to Integrated Inspection Report No. 05000298/2011005, Denial of Non-Cited Level IV Violation No. 05000298/2011005-07, Cooper Nuclear Station, Docket No. 50-298, DPR-0468 March 2012Response to Integrated Inspection Report No. 05000298/2011005, Denial of Non-Cited Level IV Violation No. 05000298/2011005-07, Cooper Nuclear Station, Docket No. 50-298, DPR-046
IR 05000298/20110068 August 2011IR 05000298-11-006; 6/6/2011 - 6/24/2011; Cooper Nuclear Station, Biennial Baseline Inspection of the Identification and Resolution of ProblemsUltimate heat sink
Mission time
Tornado Missile
Condition Adverse to Quality
Significance Determination Process
Operability Determination
ML1122014998 August 2011IR 05000298-11-006; 6/6/2011 - 6/24/2011; Cooper Nuclear Station, Biennial Baseline Inspection of the Identification and Resolution of ProblemsUltimate heat sink
Mission time
Temporary Modification
Condition Adverse to Quality
Tornado Generated Missile
Significance Determination Process
IR 05000298/201100910 June 2011EA-11-204, Cooper Nuclear Station, Final Significance Determination of White Finding and Notice of Violation, NRC Inspection Report 05000298/2011009
ML1112306533 May 2011IR 05000298-11-002 and Notice of Violation, on 01/01/11 - 03/24/11, CooperSafe Shutdown
Water Inventory Control
Probabilistic Risk Assessment
Temporary Modification
Cyber Security
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Earthquake
Offsite Circuit
Power change
Coast down
IR 05000298/20110023 May 2011IR 05000298-11-002 and Notice of Violation, on 01/01/11 - 03/24/11, CooperSafe Shutdown
Water Inventory Control
Probabilistic Risk Assessment
Temporary Modification
Cyber Security
Significance Determination Process
Job Performance Measure
Foreign Material Exclusion
Earthquake
Offsite Circuit
Fire Protection Program
Power change
Coast down
IR 05000298/201000510 February 2011IR 05000298-10-005; 09/24/2010 - 12/31/2010; Cooper Nuclear Station; Integrated Resident and Regional Report; Fire Protection, Maintenance Risk Assessments and Emergent Work Control, and Exercise EvaluationPast operability
Probabilistic Risk Assessment
Temporary Modification
Significance Determination Process
Earthquake
Fire Protection Program
Fire Watch
Incremental Core Damage Probability Deficit
ML0821405181 August 20082008-02 Final Significance Determination for a White Finding and Notice of ViolationHot Short
Safe Shutdown
Mission time
Emergency Lighting
Significance Determination Process
Large early release frequency
Earthquake
Preliminary White Finding
IR 05000298/200800813 June 2008IR 05000298-08-008, on 03/19/2008 - 06/13/2008, for Cooper, Triennial Fire Protection Follow-up InspectionSafe Shutdown
Enforcement Discretion
Probabilistic Risk Assessment
Significance Determination Process
Fire Protection Program
Fire Watch
ML08165009013 June 2008IR 05000298-08-008, on 03/19/2008 - 06/13/2008, for Cooper, Triennial Fire Protection Follow-up InspectionSafe Shutdown
Enforcement Discretion
Probabilistic Risk Assessment
Significance Determination Process
Fire Protection Program
Fire Watch
IR 05000298/200700723 October 2007Acceptance of White Finding and Notice of Violation - NRC Special IR 05000298-07-007 - Cooper Nuclear StationCondition Adverse to Quality
ML07229016717 August 2007Final Significance Determination for a White Finding and Notice of Violation - NRC Special Inspection Report 05000298/2007007Hot Short
Safe Shutdown
Mission time
Probabilistic Risk Assessment
Emergency Lighting
Condition Adverse to Quality
Significance Determination Process
Large early release frequency
Earthquake
Preliminary White Finding
ML02086017426 March 2002EA-01-298, Cooper Nuclear Station-Final Significance Determination for a White Finding and Notice of Violation (NRC Inspection Report No. 50-298/01-12)Significance Determination Process
Preliminary White Finding
ML0206002701 March 2002EA-01-231 Nebraska Public Power District, Final Significance Determination for Two White Findings and Notice of Violation (NRC Inspection Report 50-298/01-09)