Issue date | Title | Topic | |
---|---|---|---|
ML20202J824 | 1 February 1999 | Notice of Violation from Insp on 981116-1204.Violation Noted:On 981204 There Were Two Instances Where PECO Had Failed to Properly Translate Design Info Into Procedures Used for safety-related Activities | Stroke time |
ML20202J536 | 29 January 1999 | Notice of Violation from Insp on 980309-1222.Violation Noted:Three Licensee Operators Failed to Successfully Complete Requalification Program for Facility for Which License Being Sought | |
ML20206N682 | 11 December 1998 | Notice of Violation from Insp on 980922-1109.Violation Noted:On 980810,chemistry Technicians Failed to Properly Perform Required Actions of Step 4.4.3 When D Detector, RIS-2-17-458D Went Downscale During Test | |
ML20155D414 | 28 October 1998 | Notice of Violation from Insp on 980811-0921.Violation Noted:Prior to 980912,PECO Failed to Properly Maintain Sys Operation Procedure 12.1.A-3,rev 19,resulting in Two RWCU Sys Events in August 1998 | |
ML20236R751 | 16 July 1998 | Notice of Violations from Insp on 980505-0622.Violations Noted:On 980515,inoperable B Channel Had Not Been Placed in Tripped Condition for Approx 28 H | |
ML20249A484 | 11 June 1998 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:During Eecs Suction Strainer Replacement Mod in Oct 1997,licensee Did Not Establish Instructions & Procedures to Prevent Foreign Matl | |
ML20249A078 | 9 June 1998 | Notice of Violation from Insp on 980315-0504.Violation Noted:Radiation Area Signs Were Not Visible Nor Conspicuous | High Radiation Area |
ML20247L279 | 14 May 1998 | Notice of Violation from Insp on 980309-13 & 0330-0403. Violation Noted:From January 1998 to 980313,facility Licensee Administered Annual Operating Test to Operators in Manner That Sample Not Sufficiently Comprehensive | Maintenance Rule Program |
ML20217P728 | 1 May 1998 | Notice of Violation from Insp on 980118-0314.Violation Noted:Nrc Identified That Control Room Supervisor Did Not Visually or Verbally Communicate Alarm Ack of an Expected Alarm That Come in on Unit 3 | |
ML20217N365 | 30 March 1998 | Notice of Violation from Insp on 980212-0303.Violation Noted:Nrc Identified That as of 980303,LER Had Not Been Submitted for Event of 970401,involving Condition Prohibited by TS Section 3.3.2.2 | |
ML20203E360 | 20 February 1998 | Notice of Violation from Insp on 971123-980117.Violation Noted:In Nov 1997,operations Personnel Did Not Fully Adhere to Routine Test Procedure RT-O-040-620-2,Rev 4, Outstanding HVAC & Outer Screen Insp for Winter Operation | |
ML20197H043 | 16 December 1997 | Notice of Violation from Insp on 970921-1122.Violation Noted:Peco Did Not Properly Implement Written Procedures on Three Separate Occasions.Specifically,Between July 1997 & 0922,personnel Did Not Follow Instructions for Work Order | |
ML20217A646 | 12 September 1997 | Notice of Violation from Insp on 970608-0809.Violation Noted:Licensee Did Not Properly Maintain Written Procedures for Bypass of MCR Ventilation Sys When Div 1 MCR Radiation Monitor Was Inoperable | |
ML20149L291 | 24 July 1997 | Notice of Violation from Insp on 970504-0607.Violation Noted:Between mid-1993 & Nov 1996,grand Master Keys That Could Be Used to Open Locked High Radiation Areas Not Maintained Under Administrative Control | Locked High Radiation Area |
ML20140D184 | 4 June 1997 | Notice of Violation from Insp on 970308-0503.Violation Noted:Between 970321-26,PECO Failed to Maintain Measures to Assure That Design Quality Std Deviations for safety-related Rhr,Hpci & HPSW Were Controlled | Scaffolding |
ML20138P257 | 10 February 1997 | Notice of Violation from Insp on 961208-970131.Violation Noted:From 960718-29,during Mod to Turbine Bldg,Licensee Did Not Assure That Turbine Bldg Atmosphere Exhausted Through Penetrations in Bldg Wall | Offsite Dose Calculation Manual |
ML20134F905 | 3 February 1997 | Notice of Violation from Insp on 960305 & 0506 & Between 1003 & 1127.Violation Noted:Electronic Copy of Limerick Physical Security Plan,Located on PECO Nuclear Local Area Network & Document Not Under Control | |
ML20133E219 | 3 January 1997 | Notice of Violation from Insp on 960805-09.Violation Noted: on 960809,PECO Nuclear Was Not Adequately Monitoring Performance or Condition of Numerous Sys & Components Against Established Goals | Probabilistic Risk Assessment |
ML20138H794 | 27 December 1996 | Notice of Violation from Insp on 960707-0907.Violation Noted:Between June 1995 & July 1996,evaluation of Effects of Design Changes on Overall Design Were Not Made to Verify Adequacy of Mod P-0231 | |
ML20132E919 | 18 December 1996 | Notice of Violation from Insp on 960908-1109.Violation Noted:Peco Did Not Establish & Maintain Systems Approach to Training Program for Plant Contractor Electrical & Mechanical Maintenance Personnel Including Mastery of Tasks | |
ML20138G261 | 10 October 1996 | Notice of Violation from Insp on 960707-960907.Violation Noted:Failure to Prepare or Maintain Written Safety Evaluation That Provide Vases for Operation of Standby Gas Treatments Sys Prior to Jan 1996 | |
ML20058D421 | 22 November 1993 | Notice of Violation from Insp on 930914-1030.Violation Noted:Failure to Perform Adequate Technical Review of Temporary Change to Routine Test Procedure | |
ML20127L822 | 21 January 1993 | Notice of Violation from Insp on 921019-23 & 921130. Violation Noted:Licensee Measures Established for Assurance of Quality Inadequate or Untimely as Evidenced by Listed Examples | |
ML20059K734 | 6 September 1990 | Notice of Violation from Insp on 900723-27.Violation Noted: Work Activities Not Accomplished Per Procedure MP-052-001 | |
ML20056A505 | 30 July 1990 | Notice of Violation from Insp on 900516-0702.Violation Noted:Electrical Splices Performed Under Maint Request Form 9061750 on Emergency Diesel Generator Solenoid Valves of Configuration Not Approved for Class IE Applications | |
ML20246A021 | 26 June 1989 | Notice of Violation from Insp on 890507-0617.Violation Noted:On 890505,Mod 5061 for Installation of Analog Isolator on HPCI Sys Flow Controller Not Installed Per Const Installation Procedure Cd 5.3 & Error Not Detected | |
ML20247J179 | 24 March 1989 | Notice of Violation from Insp on 890130-0210.Violation Noted:Deficiency Identified in Calculation 18247-008-E, Attachment D Not Corrected | |
ML20206L418 | 21 November 1988 | Notice of Violation from Insp on 880926-30.Violation Noted: Wire Crimps Inside Limitorque Valve Actuator Housings Not Grounded & Qualification of Raychem Splices,Ideal Wire Nuts Amp Butt Splices Not Established | |
ML20206G126 | 15 November 1988 | Partially Withheld Notice of Violation & Proposed Imposition of Civil Penalties (Ref 10CFR73.21) | |
ML20207L386 | 11 October 1988 | Notice of Violation from Insp on 880711-22.Violations Noted: Required Preparatory Work for Hydrostatic Testing of E-2 Emergency Diesel Generator Water Jacket,Such as Removal of Heat Shields,Performed W/O Written Procedures | Hydrostatic |
ML20153D069 | 26 August 1988 | Notice of Violation from Insp on 880815-19.Violations Noted: Out of Sample of 47 Concrete Expansion anchors,22 Failed to Indicate Specified Min Torque Value for Size of Anchor Bolts Tested | |
ML20151U770 | 10 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $1,250,000.Violations Noted:Control Room Operators Observed Sleeping While on Duty,Reading Matls Not Directly Job Related & Failure to Rept Items to NRC | |
ML20151V437 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $1,000.Violation Noted:Senior Reactor Operator Inattentive to Instrumentations & Controls & Allowed Personnel to Be Distracted During Period Prior to 870324 | |
ML20151V452 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Violation Noted:Operator Observed to Be Inattentive to Instrumentations & Controls & Distracted by Activities That Violated Procedure A.7 | |
ML20151V460 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Violations Noted:Dw Duane Observed to Be Inattentive to Instrumentations & Controls & Distracted by Activities That Violated Procedure A.7 | |
ML20151V428 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Violations Noted:Operator Observed to Be Inattentive to Instrumentations & Controls & Distracted by Activities That Violated Procedure A.7 | |
ML20151V416 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Violations Noted:Operator Observed to Be Inattentive to Instrumentations & Controls & Distracted by Activities That Violated Procedure A.7 | |
ML20151V402 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Violation Noted:Inattentiveness to Instrumentations & Controls | Inattentive |
ML20151V738 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $800.Violation Noted:Senior Operator Inattentive to Instrumentations & Controls & Allowed Personnel to Be Distracted During Period Prior to 870324 | |
ML20151V469 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $1,000.Violations Noted:Operator Observed to Be Inattentive to Instrumentations & Controls & Distracted by Activities That Violated Procedure A.7 | |
ML20151V491 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Violations Noted:Operator Observed Being Inattentive to Instrumentations & Controls & Distracted by Activities That Violated Procedure A.7 | |
ML20151V502 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $1,000.Violation Noted:Senior Reactor Operator Was Inattentive to Instrumentations & Controls & Allowed Distraction of Personnel for Period Prior to 870324 | |
ML20151V506 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $1,000.Violation Noted:Senior Reactor Operator Found Inattentive to Instrumentations & Controls & Allowed Personnel to Be Distracted During Period Prior to 870324 | |
ML20151V525 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Violation Noted:Operator Inattentive to Instrumentations & Controls & Reading nonjob-related Matls While on Duty | |
ML20151V535 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $1,000.Noncompliance Noted:Control Room Operator Sleeping at Station | |
ML20151V555 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Noncompliance Noted:Control Room Operator Sleeping at Station | |
ML20151V711 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Noncompliance Noted:Inattentiveness to Instrumentations & Controls During Various Shifts | |
ML20151V723 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Noncompliance Noted:Inattentiveness to Instrumentations & Controls During Various Shifts | |
ML20151V742 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Noncompliance Noted:Control Room Operator Sleeping at Station | |
ML20151V759 | 9 August 1988 | Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $500.Violation Noted:Operator Inattentive to Instrumentation & Controls & Reading non-job-related Matls While on Duty |