Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23243B05631 August 2023Supplemental Information to Application for Order Approving Indirect Transfer of Control of Licenses
ML21182A24130 June 2021Commitment Change Summary Report
NOC-AE-21003816, Commitment Change Summary Report30 June 2021Commitment Change Summary Report
ML17019A00311 July 2017Attachment 2 to Safety Evaluation - In-Vessel Thermal-Hydraulic Analysis, Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191Mission time
Probabilistic Risk Assessment
Coatings
Fuel cladding
NOC-AE-17003468, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes10 May 201710 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes
NOC-AE-15003249, Submittal of 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes and Annual Report9 June 2015Submittal of 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes and Annual Report
ML14357A13622 January 2015Review of Analysis of Capsule Withdrawal Schedule from Reactor Vessel Radiation Surveillance Program
NOC-AE-14003190, Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application30 October 2014Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing ApplicationBoric Acid
Reactor Vessel Water Level
Mission time
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
ML14344A54630 October 2014Attachment 1 to NOC-AE-14003190 - Alion REP-STP-8998-13, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application Executive SummaryGrab sample
Coatings
NOC-AE-14003178, Update Foreign Ownership, Control, or Influence (FOCI)17 September 2014Update Foreign Ownership, Control, or Influence (FOCI)
NOC-AE-14003101, Enclosure 1 to Enclosure 6 Concerning Second Set of Responses to April 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Application25 June 2014Enclosure 1 to Enclosure 6 Concerning Second Set of Responses to April 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 ApplicationBoric Acid
High winds
Reactor Vessel Water Level
Weld Overlay
Probabilistic Risk Assessment
Large early release frequency
Exemption Request
ML14168A2681 May 2014Texas Pollutant Discharge Elimination System Major Amendment with Renewal Application for a Major Facility Tpdes Permit No. WQ000190800Coatings
NOC-AE-14003103, University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 118 April 2014University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 1High Radiation Area
Coatings
Scaffolding
ML14087A07815 April 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident (TAC MF0178 & MF0179)Unanalyzed Condition
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
NOC-AE-14003114, Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai..31 March 2014Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai..Safe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
NOC-AE-13003067, Supplement to Seismic Walkdown Summary Report of Items Classified as Inaccessible27 February 2014Supplement to Seismic Walkdown Summary Report of Items Classified as InaccessibleSafe Shutdown
Unanalyzed Condition
Boric Acid
Reactor Vessel Water Level
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
FLEX
Fukushima Dai-Ichi
Earthquake
Scaffolding
ML13323A18612 November 2013Enclosure 4-1 - Risk-Informed Closure of GSI-191, Volume 1Boric Acid
High winds
Reactor Vessel Water Level
Ultimate heat sink
Non-Destructive Examination
Grab sample
Probabilistic Risk Assessment
Coatings
Large early release frequency
Control of Heavy Loads
Fuel cladding
ML13323A1916 November 2013Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Page 212 of 1-122Boric Acid
Coatings
ML13323A1906 November 2013Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Cover - Page 211 of 248Grab sample
Weld Overlay
Hydrostatic
Probabilistic Risk Assessment
Coatings
Large early release frequency
Fuel cladding
ML13323A18922 October 2013Enclosure 4-2 - Risk-Informed Closure of GSI-191, Volume 2 Probabilistic Risk AnalysisHigh winds
Mission time
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Fuel cladding
NOC-AE-13003019, Submittal of Commitment Change Summary Report for the Period June 21, 2011 Through June 21, 201318 July 2013Submittal of Commitment Change Summary Report for the Period June 21, 2011 Through June 21, 2013
NOC-AE-13003004, Revised Phase 1 Staffing Assessment Submitted in Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights3 June 2013Revised Phase 1 Staffing Assessment Submitted in Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of InsightsSafe Shutdown
High Radiation Area
Condition Adverse to Quality
FLEX
Fukushima Dai-Ichi
Job Performance Measure
Severe Accident Management Guideline
Earthquake
ML13141A28525 April 2013License Amendment Request, Proposed Revision to Technical Specification 5.0, Design FeaturesOffsite Dose Calculation Manual
NOC-AE-12002912, Submittal of 10 CFR 50.46 ECCS Evaluation Model Significant Change/Error Report17 October 2012Submittal of 10 CFR 50.46 ECCS Evaluation Model Significant Change/Error Report
ML12234A60421 August 2012Email - Documents for NRC Public Meeting on Corrosion Head Loss Experiments (Chle) Part 1 and 2Boric Acid
Grab sample
Probabilistic Risk Assessment
Coatings
Scaffolding
ML11306061531 October 2011LOCA Frequencies for STP Nuclear Operating Company GSI-191Weld Overlay
Internal Flooding
Probabilistic Risk Assessment
Nondestructive Examination
Dissimilar Metal Weld
ML11305062326 October 2011Alion- Expected Impact of Chemical Effects on GSI-191 Risk Informed Evaluation for South Texas ProjectBoric Acid
Mission time
Probabilistic Risk Assessment
Coatings
Scaffolding
NOC-AE-11002708, 10CFR50.59 Summary Report10 October 201110CFR50.59 Summary Report
ML11256A05831 August 2011Documents to Support Review of the South Texas Project License Renewal Application, WR-5, Tceq Id No. 1610103/1610051 (Operation of Public Potable Water System)
ML11196A0054 August 2011Summary of Site Audit Related to the Review of the License Renewal Application for South Texas Project, Units 1 and 2License Renewal
ML11217A01627 July 2011Commitment Change Summary ReportFire Watch
NOC-AE-09002457, Nuclear Decommissioning Trust Fund Agreements (Updated)15 September 2009Nuclear Decommissioning Trust Fund Agreements (Updated)
NOC-AE-09002445, Submittal of Commitment Change Summary Report for July 31, 2008 Through July 30, 200930 July 2009Submittal of Commitment Change Summary Report for July 31, 2008 Through July 30, 2009
NOC-AE-09002424, Submittal of Description and Summary of the 10CFR50.59 Evaluations of Changes, Tests and Experiments Report28 April 2009Submittal of Description and Summary of the 10CFR50.59 Evaluations of Changes, Tests and Experiments ReportCyber Security
Exemption Request
NOC-AE-08002325, Commitment Change Summary Report11 August 2008Commitment Change Summary Report
ML08070069928 February 2008Evidence of Financial Protection
NOC-AE-07002231, Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46)7 November 2007Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46)Reactor Vessel Water Level
Nondestructive Examination
Pressure Boundary Leakage
NOC-AE-07002177, Proposed Alternative to ASME Section XI Requirements for Weld Overlay Hold-Time (RR-ENG-2-48)19 June 2007Proposed Alternative to ASME Section XI Requirements for Weld Overlay Hold-Time (RR-ENG-2-48)Weld Overlay
Liquid penetrant
Dissimilar Metal Weld
NOC-AE-07002168, Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43)29 May 2007Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43)Weld Overlay
NOC-AE-06002049, Commitment Change Summary Report21 August 2006Commitment Change Summary Report
NOC-AE-06001977, Submittal of Nuclear Insurance Protection9 February 2006Submittal of Nuclear Insurance ProtectionContraband
Met Tower
Earthquake
NOC-AE-05001919, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Ecw Train 1A)8 September 2005Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Ecw Train 1A)Mission time
Coatings
Nondestructive Examination
VT-2
NOC-AE-05001874, Transmittal of the 10CFR50.59 Summary Report28 April 2005Transmittal of the 10CFR50.59 Summary Report
ML05322046114 June 2004Power Reactor Status Report for 6/14/04
ML03198001318 July 2003Misc Report ,Stars, 6/10-11/2003 Licensing Workshop Held in Overland Park, Kansas with Strategic Teaming and Resource Sharing-Integrated Regulatory Affairs Group for Licensees of Callaway, Comanche Peak, Diablo Canyon, Palo Verde, So Texas
NOC-AE-03001532, Request for One-Time Approval of an Alternative Approach for Containment Tendon Surveillances15 May 2003Request for One-Time Approval of an Alternative Approach for Containment Tendon SurveillancesFinite Element Analysis
NOC-AE-03001509, Special Report Re Power-Operated Relief Valve Actuation to Mitigate Reactor Coolant System Pressure Transient25 April 2003Special Report Re Power-Operated Relief Valve Actuation to Mitigate Reactor Coolant System Pressure Transient
NOC-AE-02001277, Project Comprehensive Cultural Assessment17 April 2002Project Comprehensive Cultural Assessment