|
---|
Category:Letter
MONTHYEARML24304B0512024-10-30030 October 2024 Cycle 26 Core Operating Limits Report IR 05000498/20244022024-10-23023 October 2024 Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402 05000499/LER-2024-003, Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function2024-10-22022 October 2024 Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24290A1162024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan ML24255A0322024-09-30030 September 2024 The Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test 05000499/LER-2024-001, Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators 05000498/LER-2024-003, Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump2024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump 05000498/LER-2024-002-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function 05000498/LER-2023-003-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24137A0882024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report 05000498/LER-2023-004-01, Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water2024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 05000498/LER-2024-001, Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update ML24081A3972024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance NOC-AE-240040, Nuclear Liability Certificates of Insurance2024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) IR 05000498/20240132024-02-27027 February 2024 Design Basis Assurance Inspection (Programs) Commercial Grade Dedication IR 05000498/2024013 and 05000499/2024013 ML24022A2252024-02-20020 February 2024 Issuance of Amendment Nos. 227 and 212 to Authorize the Revision of the Alternative Source Term Dose Calculation ML24050A0082024-02-19019 February 2024 Evidence of Financial Protection ML24045A0922024-02-16016 February 2024 Response to STP FOF Move Letter (2024) 2024-09-30
[Table view] Category:Report
MONTHYEARNOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) ML23243B0562023-08-31031 August 2023 Supplemental Information to Application for Order Approving Indirect Transfer of Control of Licenses ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) ML21266A4262021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report ML21182A2412021-06-30030 June 2021 Commitment Change Summary Report ML17019A0032017-07-11011 July 2017 Attachment 2 to Safety Evaluation - In-Vessel Thermal-Hydraulic Analysis, Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 NOC-AE-17003468, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2017-05-10010 May 2017 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML16302A0152016-10-20020 October 2016 South Texas Project, Units 1 & 2 - Supplement 3 to Revised Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Address Generic Safety Issue (GSl)-191 and Respond to Generic Letter (GL) 2004-02 NOC-AE-16003345, LTR-PAFM-16-11-NP, Revision 0, Technical Justification to Support Extended Volumetric Examination Interval for South Texas, Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds.2016-03-31031 March 2016 LTR-PAFM-16-11-NP, Revision 0, Technical Justification to Support Extended Volumetric Examination Interval for South Texas, Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds. NOC-AE-15003249, Submittal of 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes and Annual Report2015-06-0909 June 2015 Submittal of 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes and Annual Report ML14357A1362015-01-22022 January 2015 Review of Analysis of Capsule Withdrawal Schedule from Reactor Vessel Radiation Surveillance Program NOC-AE-14003190, Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application2014-10-30030 October 2014 Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application ML14344A5462014-10-30030 October 2014 Attachment 1 to NOC-AE-14003190 - Alion REP-STP-8998-13, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application Executive Summary NOC-AE-14003178, Update Foreign Ownership, Control, or Influence (FOCI)2014-09-17017 September 2014 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-14003161, Engineering Report 1060, Rev. 1, Meter Factor Calculation & Accuracy Assessment for South Texas Project Units 1 & 2.2014-08-31031 August 2014 Engineering Report 1060, Rev. 1, Meter Factor Calculation & Accuracy Assessment for South Texas Project Units 1 & 2. ML14260A4382014-08-31031 August 2014 Engineering Report ER-1059, Rev. 1, Bounding Uncertainty Analysis for Thermal Power Determination at South Texas Project Units 1 & 2 Using LEFM System. NOC-AE-14003101, Enclosure 1 to Enclosure 6 Concerning Second Set of Responses to April 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Application2014-06-25025 June 2014 Enclosure 1 to Enclosure 6 Concerning Second Set of Responses to April 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Application ML14168A2682014-05-0101 May 2014 Texas Pollutant Discharge Elimination System Major Amendment with Renewal Application for a Major Facility Tpdes Permit No. WQ000190800 NOC-AE-14003103, University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 12014-04-18018 April 2014 University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 1 ML14087A0782014-04-15015 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident (TAC MF0178 & MF0179) NOC-AE-14003114, Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai..2014-03-31031 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai.. NOC-AE-14003082, Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 32014-03-11011 March 2014 Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3 NOC-AE-13003067, Supplement to Seismic Walkdown Summary Report of Items Classified as Inaccessible2014-02-27027 February 2014 Supplement to Seismic Walkdown Summary Report of Items Classified as Inaccessible ML14072A0832014-02-24024 February 2014 CHLE-010, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition, Revision 3 ML14072A0872014-02-24024 February 2014 CHLE-016, Calculated Material Release to Estimate Chemical Effects, Revision 3 ML14072A0862014-02-24024 February 2014 CHLE-015, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal, Revision 4 ML14072A0802014-02-24024 February 2014 CHLE-006, STP Material Calculations, Revision 2 ML14072A0822014-02-23023 February 2014 CHLE-008, Debris Bed Preparation & Formation Test Results, Revision 4 ML14072A0792014-02-22022 February 2014 CHLE-020, Test Results for 10-Day Chemical Effects Test Simulating LBLOCA Condition (T5), Revision 3 ML14072A0882014-02-22022 February 2014 CHLE-018, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions, Revision 3 ML14072A0852014-02-22022 February 2014 CHLE-014, T2 LBLOCA Test Report, Revision 3 ML14072A0842014-02-18018 February 2014 CHLE-012, T1 Mbloca Test Report, Revision 4 ML14072A0772014-02-18018 February 2014 CHLE-005, Determination of the Initial Pool Chemistry for the Chle Test, Revision 2 ML14149A4352014-02-14014 February 2014 Project, Units 1 and 2 - ALION-REP-STP-8998-02, Rev. 0, STP Casa Grande Analysis and LAR Enclosure 4-3 RAI Response, Enclosure 1 to Attachment 1 ML14072A0812014-02-13013 February 2014 CHLE-007, Debris Bed Requirements & Preparation Procedures, Revision 4 ML13339A7362014-01-29029 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13354B8332014-01-23023 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for South Texas Project, Units 1 and 2, TAC Nos.: MF0825 and MF0826 NOC-AE-13003070, Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application2013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application ML13323A1862013-11-12012 November 2013 Enclosure 4-1 - Risk-Informed Closure of GSI-191, Volume 1 ML13323A1912013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Page 212 of 1-122 ML13323A1902013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Cover - Page 211 of 248 ML13323A1892013-10-22022 October 2013 Enclosure 4-2 - Risk-Informed Closure of GSI-191, Volume 2 Probabilistic Risk Analysis ML13323B2092013-10-0404 October 2013 Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5). ML13323B2082013-09-23023 September 2013 Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions. NOC-AE-13003019, Submittal of Commitment Change Summary Report for the Period June 21, 2011 Through June 21, 20132013-07-18018 July 2013 Submittal of Commitment Change Summary Report for the Period June 21, 2011 Through June 21, 2013 ML13175A2122013-06-18018 June 2013 Project, Units 1 and 2, Enclosure 4-1 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 1 Project Summary NOC-AE-13002986, Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 161 of 260 Through End2013-06-0606 June 2013 Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 161 of 260 Through End 2023-08-31
[Table view] Category:Miscellaneous
MONTHYEARML23243B0562023-08-31031 August 2023 Supplemental Information to Application for Order Approving Indirect Transfer of Control of Licenses ML21182A2412021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report ML17019A0032017-07-11011 July 2017 Attachment 2 to Safety Evaluation - In-Vessel Thermal-Hydraulic Analysis, Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 NOC-AE-17003468, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2017-05-10010 May 2017 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-15003249, Submittal of 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes and Annual Report2015-06-0909 June 2015 Submittal of 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes and Annual Report ML14357A1362015-01-22022 January 2015 Review of Analysis of Capsule Withdrawal Schedule from Reactor Vessel Radiation Surveillance Program NOC-AE-14003190, Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application2014-10-30030 October 2014 Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application ML14344A5462014-10-30030 October 2014 Attachment 1 to NOC-AE-14003190 - Alion REP-STP-8998-13, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application Executive Summary NOC-AE-14003178, Update Foreign Ownership, Control, or Influence (FOCI)2014-09-17017 September 2014 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-14003101, Enclosure 1 to Enclosure 6 Concerning Second Set of Responses to April 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Application2014-06-25025 June 2014 Enclosure 1 to Enclosure 6 Concerning Second Set of Responses to April 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Application ML14168A2682014-05-0101 May 2014 Texas Pollutant Discharge Elimination System Major Amendment with Renewal Application for a Major Facility Tpdes Permit No. WQ000190800 NOC-AE-14003103, University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 12014-04-18018 April 2014 University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 1 ML14087A0782014-04-15015 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident (TAC MF0178 & MF0179) NOC-AE-14003114, Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai..2014-03-31031 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai.. NOC-AE-13003067, Supplement to Seismic Walkdown Summary Report of Items Classified as Inaccessible2014-02-27027 February 2014 Supplement to Seismic Walkdown Summary Report of Items Classified as Inaccessible ML13323A1862013-11-12012 November 2013 Enclosure 4-1 - Risk-Informed Closure of GSI-191, Volume 1 ML13323A1912013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Page 212 of 1-122 ML13323A1902013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Cover - Page 211 of 248 ML13323A1892013-10-22022 October 2013 Enclosure 4-2 - Risk-Informed Closure of GSI-191, Volume 2 Probabilistic Risk Analysis NOC-AE-13003019, Submittal of Commitment Change Summary Report for the Period June 21, 2011 Through June 21, 20132013-07-18018 July 2013 Submittal of Commitment Change Summary Report for the Period June 21, 2011 Through June 21, 2013 NOC-AE-13003004, Revised Phase 1 Staffing Assessment Submitted in Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights2013-06-0303 June 2013 Revised Phase 1 Staffing Assessment Submitted in Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights ML13141A2852013-04-25025 April 2013 License Amendment Request, Proposed Revision to Technical Specification 5.0, Design Features NOC-AE-12002912, Submittal of 10 CFR 50.46 ECCS Evaluation Model Significant Change/Error Report2012-10-17017 October 2012 Submittal of 10 CFR 50.46 ECCS Evaluation Model Significant Change/Error Report ML12234A6042012-08-21021 August 2012 Email - Documents for NRC Public Meeting on Corrosion Head Loss Experiments (Chle) Part 1 and 2 ML1130606152011-10-31031 October 2011 LOCA Frequencies for STP Nuclear Operating Company GSI-191 ML1130506232011-10-26026 October 2011 Alion- Expected Impact of Chemical Effects on GSI-191 Risk Informed Evaluation for South Texas Project NOC-AE-11002708, 10CFR50.59 Summary Report2011-10-10010 October 2011 10CFR50.59 Summary Report ML11256A0582011-08-31031 August 2011 Documents to Support Review of the South Texas Project License Renewal Application, WR-5, Tceq Id No. 1610103/1610051 (Operation of Public Potable Water System) ML11196A0052011-08-0404 August 2011 Summary of Site Audit Related to the Review of the License Renewal Application for South Texas Project, Units 1 and 2 ML11217A0162011-07-27027 July 2011 Commitment Change Summary Report NOC-AE-09002457, Nuclear Decommissioning Trust Fund Agreements (Updated)2009-09-15015 September 2009 Nuclear Decommissioning Trust Fund Agreements (Updated) NOC-AE-09002445, Submittal of Commitment Change Summary Report for July 31, 2008 Through July 30, 20092009-07-30030 July 2009 Submittal of Commitment Change Summary Report for July 31, 2008 Through July 30, 2009 NOC-AE-09002424, Submittal of Description and Summary of the 10CFR50.59 Evaluations of Changes, Tests and Experiments Report2009-04-28028 April 2009 Submittal of Description and Summary of the 10CFR50.59 Evaluations of Changes, Tests and Experiments Report NOC-AE-08002325, Commitment Change Summary Report2008-08-11011 August 2008 Commitment Change Summary Report ML0807006992008-02-28028 February 2008 Evidence of Financial Protection NOC-AE-07002231, Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46)2007-11-0707 November 2007 Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46) NOC-AE-07002177, Proposed Alternative to ASME Section XI Requirements for Weld Overlay Hold-Time (RR-ENG-2-48)2007-06-19019 June 2007 Proposed Alternative to ASME Section XI Requirements for Weld Overlay Hold-Time (RR-ENG-2-48) NOC-AE-07002168, Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43)2007-05-29029 May 2007 Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43) NOC-AE-06002049, Commitment Change Summary Report2006-08-21021 August 2006 Commitment Change Summary Report NOC-AE-06001977, Submittal of Nuclear Insurance Protection2006-02-0909 February 2006 Submittal of Nuclear Insurance Protection NOC-AE-05001919, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Ecw Train 1A)2005-09-0808 September 2005 Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Ecw Train 1A) NOC-AE-05001874, Transmittal of the 10CFR50.59 Summary Report2005-04-28028 April 2005 Transmittal of the 10CFR50.59 Summary Report ML0532204612004-06-14014 June 2004 Power Reactor Status Report for 6/14/04 ML0319800132003-07-18018 July 2003 Misc Report ,Stars, 6/10-11/2003 Licensing Workshop Held in Overland Park, Kansas with Strategic Teaming and Resource Sharing-Integrated Regulatory Affairs Group for Licensees of Callaway, Comanche Peak, Diablo Canyon, Palo Verde, So Texas NOC-AE-03001532, Request for One-Time Approval of an Alternative Approach for Containment Tendon Surveillances2003-05-15015 May 2003 Request for One-Time Approval of an Alternative Approach for Containment Tendon Surveillances NOC-AE-03001509, Special Report Re Power-Operated Relief Valve Actuation to Mitigate Reactor Coolant System Pressure Transient2003-04-25025 April 2003 Special Report Re Power-Operated Relief Valve Actuation to Mitigate Reactor Coolant System Pressure Transient NOC-AE-02001277, Project Comprehensive Cultural Assessment2002-04-17017 April 2002 Project Comprehensive Cultural Assessment 2023-08-31
[Table view] |
Text
Nuclear Operating Company South Texs Pmoject Electric Gencrab'n$Station 0. Box 289 Wadsworth, Texas 77483 ,
February 28, 2008 NOC-AE- 08002271 File No.: G20 1 OCFR1 40.11 (a)(4) 1 OCFR1 40.1 5 10CFR1 40.17 1 0CFR1 40.21 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 South Texas Project Units 1 and 2 Docket Nos.: STN 50-498, STN 50-499 Evidence of Financial Protection Pursuant to the requirements of 1 OCFR1 40.11 (a)(4), 1 OCFR1 40.1 5, 1 OCFR1 40.1 7, and 1 OCFR1 40.21, STP Nuclear Operating Company submits the attached Nuclear Energy Liability Insurance policy endorsements from American Nuclear Insurers (ANI). This submittal contains the following endorsements:
Nuclear Energy Liability Facility Form (NF-0307)
Master Worker Form (NW-0657)
Secondary Financial Protection (N-0113 / N-0116)
There are no commitments associated with this letter. Should you have any questions, concerns, or require additional information on this matter, please contact Karen Dudley at (361) 972-8698 or Cheryl Glover at (361) 972-71 48.
Ronald G. Hyde Manager, Financial Services KMD Attachments: Endorsements:
Facility Form (NF-0307) - (5)
Master Worker Form (NW-0657) - (2)
Secondary Financial Protection (N-0113) - (1)
Secondary Financial Protection (N-01 6) - (1)
G:\HUMANRESOURCES\INSURAN*cE\ANNUAL MST DOS\2008\NRCUABIUTY INS NOTICE (A*--2008).DOC STI No.: 32272844
STP Nuclear Operating Company NOC-AE- 08002271 Page 2 cc:
(paper copy) (electronic copy)
Regional Administrator, Region IV A. H. Gutterman, Esquire U. S. Nuclear Regulatory Commission Morgan, Lewis & Bockius LLP 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mohan C. Thadani U. S. Nuclear Regulatory Commission Mohan C. Thadani Senior Project Manager Thad Hill U. S. Nuclear Regulatory Commission Catherine Callaway One White Flint North (MS 7 D1) Eddy Daniels 11555 Rockville Pike Steve Winn Rockville, MD 20852 Brad Porlier Staney Rostad Senior Resident Inspector NRG South Texas LP U. S. Nuclear Regulatory Commission P. 0. Box 289, Mail Code: MN1 16 Ed Alarcon Wadsworth, TX 77483 J.J. Nesrsta R. K. Temple U. S. Nuclear Regulatory Commission Kevin Polio Attention: Document Control Desk City Public Service One White Flint North 11555 Rockville Pike Jon C. Wood Rockville, MD 20852 Cox Smith Matthews C. M. Canady C. Kirksey City of Austin City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 Richard A. Ratliff Bureau of Radiation Control Texas Department of State Health Services 1100 West 49th Street Austin, TX 78756-3189 M. K. Kistler, w/o Electronic RMS N2002 G:\UMANRESOURCES\INSURANCE\ANNUAL MUST DOS\2008\NRCLIABILITY INS NOTICE (ANI-2008).DOC STINo.: 32272844
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION CHANGES IN SUBSCRIBING COMPANIES AND IN THEIR PROPORTIONATE LIABILITY ENDORSEMENT CALENDAR YEAR 2006
- 1. It is agreed that with respect to bodily injury, property damage, environmental damage or evacuation of the public caused, during the effective period of this endorsement, by the nuclear energy hazard:
- a. The word "companies" wherever used in the policy means the subscribing companies listed below.
- b. The policy shall be binding on such companies only.
- c. Each such company shall be liable for its proportion of any obligation assumed or expense incurred under the policy because of such bodily injury, property damage, environmental damage or evacuation of the public as designated below.
- 2. It is agreed that the effective period of this endorsement is from the beginning of the effective date of this endorsement stated below to the close of December 31, 2006 or to the time of the termination or cancellation of the policy, if sooner.
American Commerce Insurance Company 11.472860%
AXIS Reinsurance Company 12.747623%
Employers Mutual Casualty Company 2.549525%
Federal Insurance Company 31.869055%
Motors Insurance Corporation 0.568544%
National Union Fire Ins Co of Pitts, PA 12.747623%
State Farm Mutual Automobile Insurance Company 15.297147%
Zurich American Insurance Company 12.747623%
Total 100.000000 % NE-2006 This is to certify that this is a true copy of the original Endorsement having the endorsement number and being made part of the Nuclear Energy Liability Policy (Facility Form) as designated hereon. No insurance is afforded hereunder.
John L. Quattrocchi, Senior Vice President, Underwriting, American Nuclear Insurers Effective Date of this Endorsement: January 1, 2006 To form a part of Policy No. NF -0307 (12:01 A.M. Standard Time)
Issued to: STP Nuclear Operating Company, Texas Genco, LP, City Public Service Board of San Antonio, City of Austin Date of Issue: March 24, 2006 For the subscribing companies By President (1/ cl President Endorsement No.: 99 Countersigned by
-A -/
CERTIFIED COPY
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION CHANGES IN SUBSCRIBING COMPANIES AND IN THEIR PROPORTIONATE LIABILITY ENDORSEMENT CALENDAR YEAR 2007 I. It is agreed that with respect to bodily injury, property damage, environmental damage or evacuation of the public caused, during the effective period of this endorsement, by the nuclear energy hazard:
- a. The word "companies" wherever used in the policy means the subscribing companies listed below.
- b. The policy shall be binding on such companies only.
- c. Each such company shall be liable for its proportion of any obligation assumed or expense incurred under the policy because of such bodily injury, property damage, environmental damage or evacuation of the public as designated below.
- 2. It is agreed that the effective period of this endorsement is from the beginning of the effective date of this endorsement stated below to the close of December 31, 2007 or to the time of the termination or cancellation of the policy, if sooner.
American Commerce Insurance Company 12.651531 %
AXIS Reinsurance Company 13.801670%
Employers Mutual Casualty Company 4.600557%
Federal Insurance Company 28.753479%
Motors Insurance Corporation 0.512962%
National Union Fire Ins Co of Pitts, PA 12.651531 %
State Farm Mutual Automobile Insurance Company 13.801670%
Zurich American Insurance Company Total 13.226600%
1N0 000000%0/ NP-2007 NE-2007 This is to certify that this is a true copy of the original Endorsement having the endorsement, number and being made part of the Nuclear Energy Liability Policy (Facility Form) as designated hereon. No insurance is afforded hereunder.
John L. Quattrocchi, Senior Vice President, Underwriting, American Nuclear Insurers Effective Date of this Endorsement: January 1, 2007 To form a part of Policy No. NF -0307 (12:01 A.M. Standard Time)
Issued to: STP Nuclear Operating Company, Texas Genco, LP, City Public Service Board of San Antonio, City of Austin Date of Issue: April 5, 2007 For the subscribing companies 6~)
By -*)
,1/ 'o' President Endorsement No.: 101 Countersigned by k -I.1 CERTIFIED COPY
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION AMENDATORY, ENDORSEMENT It is agreed that:
I. Item I of the Declarations, as amended by Endorsement Nos. 1, 58, 67, 84 and 97, is further amended to read:
Item 1. Named Insured: STP Nuclear Operating Company, NRG South Texas LP City Public Service Board of San Antonio, City of Austin Address: c/o STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483
- 2. Condition 17, "Authorization of Named Insured", is amended to read:
17 AUTHORIZATION OF NAMED INSURED Except with respect to compliance with the obligations imposed on the insured by Conditions 5, 6, 7, 8, 9, 10 and II of this policy, STP Nuclear Operating Company is authorized to act for every other insured in all matters pertaining to this insurance.
This is to certify that this is a true copy of the original Endorsement having the endorsement number and being made part of the Nuclear Energy Liability Policy (Facility Form) as designated hereon. No insurance is afforded hereunder.
Gary S. Urlcchlo, Vice President - Underwriting American Nuclear Insurers Effective Date of this Endorsement: February 2, 2006 To form a part of Policy No. NF -0307 (12:01 A.M. Standard Time)
Issued to: STP Nuclear Operating Company, NRG South Texas LP, City Public ServiceBoard of San Antonio, City of Austin Date of Issue: January 18, 2008 For the subscribing companies C)
By
" President Endorsement No,: 104 Countersigned by ,.
CERTIFIED COPY
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ADDRESS OF NUCLEAR ENERGY LIABIUTY INSURANCE ASSOCIATION ENDORSEMENT It is agreed that the address of the Nuclear Energy Liability Insurance Association appearing in the "Company Representation" condition of the policy is amended to read:
95 Glastonbury Boulevard Suite 300 Glastonbury, CT 06033-4453 This is to certify that this is a true copy of the original Endorsement having the endorsement number and being made part of the Nuclear Energy Liability Policy (Facility Form) as designated hereon. No Insurance is afforded hereunder.
Gary S. Uricchio, Vice President - Underwriting American Nuclear Insurers Effective Date of this Endorsement: January 1, 2008 To form a part of Policy No. NF -0307 (12:01 A.M. Standard Time)
Issued to: STP Nuclear Operating Company, Texas Genco, LP, City Public Service Board of San Antonio, City of Austin Date of Issue: C)ecember 5, 2007 For the subscribing companp es President Endorsement No.: 103 Countersigned by_, l1 1 4A'f" CERTIFIED -COPY
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ADVANCE PREMIUM AND STANDARD PREMIUM ENDORSEMENT CALENDAR YEAR 2008 I. ADVANCE PREMIUM: it is agreed that the Advance Premium due the companies for the period designated above is: $907,035.00
- 2. STANDARD PREMIUM AND RESERVE PREMIUM: In the absence of a change in the Advance Premium indicated above, it is agreed that, subject to the provisions of the Industry Credit Rating Plan, the Standard Premium is said Advance Premuim and the Reserve Premium is: $695,902.00 This is to certify that this is a true copy of the original Endorsement having the endorsement number and being made part of the Nuclear Energy Liability Policy (Facility Form) as designated heron. No insurance is afforded hereunder.
Gary S. Vice President - Underwriting lreho.
Americ~a 'ucear Insurers Effective Date of this Endorsement: January 1, 2008 To form a part of Policy No. NF -0307 (12:01 A.M. Standard Time)
Issued To: STP Nuclear Operating Company, NRG South Texas LP, City Public Service Board of San Antonio, City of Austin Date of Issue: November 1, 2007 For the subscribing companies By cPrsdn Cl President Endorsement No: 102 Countersigned by "'f-l CERTIFIED COPY NE-36
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ADVANCE PREMIUM AND STANDARD PREMIUM ENDORSEMENT CALENDAR YEAR 2008 I. ADVANCE PREMIUM: It is agreed that the Advance Premium due the companies for the period designated above is: $85,108.00
- 2. STANDARD PREMIUM AND RESERVE PREMIUM: In the absence of a change in the Advance Premium indicated above, it is agreed that, subject to the provisions of the Industry Credit Rating Plan, the Standard Premium is said Advance Premuim and the Reserve Premium is: $65,175.00 This Is to certify that this is a true copy of the original Endorsement having the endorsement number and being made part of the Certificate of Insurance bearing the number designated heron for Insurance coverage under the Nuclear Energy Liability Policy (Facility Workers Form). No insurance is afforded hereunder.
eary S.% uchl, Vice President - Underwriting AmericaN uclear Insurers Effective Date of this Endorsement: January 1, 2008 To form a part of Certificate No. NW -0657 (12:01 A.M. Standard Timc)
Issued To: STP Nuclear Operating Company, NRG South Texas LP, City Public Service Board of San Antonio, City of Austin Date of Issue: October 10, 2007 For the subscribing companies By . "t i President Endorsement No: 14 Countersigned by COPY CERTIFIED
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION AMENDMENT OF NAMED INSUREDS AND ADDRESSES ENDORSEMENT It is agreed that Item I of the Declarations, as amended by Endorsement Nos. 2, 7 and 11, is further amended to read:
Item 1. Named Insureds and Addresses:
(a) STP Nuclear Ope-rating Company P.O. Box 289 Wadsworth, TX 77483 (b) NRG South Texas LP P.O. Box 4567 Houston, TX 77210 (c) City Public Service Board of San Antonio P.O. Box 1771 San Antonio, TX 78296 (d) City of Austin P.O. Box 1088 Austin, TX 78767 This is to certify that this is a true copy of the original endorsement having the endorsement number and being made part of the Certificate of Insurance bearing the number designated hereon for insurance coverage under the Nuclear Energy Liability Policy (Facility Worker Form).
No Insurance is afforded hereunder.
Gary S. Uricchio, Vice President - Underwriting American Nuclear Insurers Effective Date of this Endorsement: February 2, 2006 To form a part of Certificate No. NW -0657 (12:01 A.M. Standard Time)
Issued to: STP Nuclear Operating Company, NRG South Texas LP, City Public Service Board of San Antonio, City of Austin Date of Issue: January 17, 2008 For the subscribing companies By Pi d C/ u President Endorsement No.: 15 Countersigned by ,-,, .' ,. -'¶.
Z U,
CERTIFIED COPY
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ANNUAL PREMIUM ENDORSEMENT CALENDAR YEAR 2008
- 1. ANNUAL PREMIUM: It is agreed that the Annual Premium due the companies for the period designated above is: $9,492.00' This Is to certify that this Is a true copy of the original Certificate, bearing the number designated heron, for Insurance coverage under the Master Policy-Nuclear Energy Liability Insurance (Secondary Financial Protection). No insurance is afforded by this copy.
S. io Vice President- Underwriting eary Ammeric~a Wuclear Insurers Effective Date of this Endorsement: January 1, 2008 To form a part of Certificate No. N -0113 (12:01 A.M. Standard Time)
Issued To; STP Nuclear Operating Company, NRG South Texas LP, City Public Service Board of San Antonio, City of Austin Date of Issue: October 5, 2007 For the subscribing companies By f -se 0 6" President Endorsement No: 43 Countersigned by V 06 Z"&
CERTIFIED COPY
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ANNUAL PREMIUM ENDORSEMENT CALENDAR YEAR 2008 I. ANNUAL PREMIUM: It is agreed that the Annual Premium due the companies for the period designated above is: $9,492.00 This is to certify that this is a true copy of the original Certificate, bearing the number designated heron, for insurance coverage under the Master Policy-Nuclear Energy Liability Insurance (Secondary Financial Protection). No insurance Is afforded by this copy.
S.*ary lo, Vice P-resident - Underwriting Americaý*ucear Insurers Effective Date of this Endorsement: January 1, 2008 To form a part of Certificate No. N -0116 (12:01 A.M. Standard Time)
Issued To: STP Nuclear Operating Company, NRG South Texas LP, City Public Service Board of San Antonio, City of Austin Date of Issue: October 5, 2007 For the subscribing companies By 1 President Endorsement No: 41 Countersigned by "'f'/
CERTIFIED COPY