Category:Report
MONTHYEARNOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) ML23243B0562023-08-31031 August 2023 Supplemental Information to Application for Order Approving Indirect Transfer of Control of Licenses ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) ML21266A4262021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report ML21182A2412021-06-30030 June 2021 Commitment Change Summary Report ML17019A0032017-07-11011 July 2017 Attachment 2 to Safety Evaluation - In-Vessel Thermal-Hydraulic Analysis, Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 NOC-AE-17003468, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2017-05-10010 May 2017 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML16302A0152016-10-20020 October 2016 South Texas Project, Units 1 & 2 - Supplement 3 to Revised Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Address Generic Safety Issue (GSl)-191 and Respond to Generic Letter (GL) 2004-02 NOC-AE-16003345, LTR-PAFM-16-11-NP, Revision 0, Technical Justification to Support Extended Volumetric Examination Interval for South Texas, Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds.2016-03-31031 March 2016 LTR-PAFM-16-11-NP, Revision 0, Technical Justification to Support Extended Volumetric Examination Interval for South Texas, Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds. NOC-AE-15003249, Submittal of 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes and Annual Report2015-06-0909 June 2015 Submittal of 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes and Annual Report ML14357A1362015-01-22022 January 2015 Review of Analysis of Capsule Withdrawal Schedule from Reactor Vessel Radiation Surveillance Program NOC-AE-14003190, Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application2014-10-30030 October 2014 Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application ML14344A5462014-10-30030 October 2014 Attachment 1 to NOC-AE-14003190 - Alion REP-STP-8998-13, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application Executive Summary NOC-AE-14003178, Update Foreign Ownership, Control, or Influence (FOCI)2014-09-17017 September 2014 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-14003161, Engineering Report 1060, Rev. 1, Meter Factor Calculation & Accuracy Assessment for South Texas Project Units 1 & 2.2014-08-31031 August 2014 Engineering Report 1060, Rev. 1, Meter Factor Calculation & Accuracy Assessment for South Texas Project Units 1 & 2. ML14260A4382014-08-31031 August 2014 Engineering Report ER-1059, Rev. 1, Bounding Uncertainty Analysis for Thermal Power Determination at South Texas Project Units 1 & 2 Using LEFM System. NOC-AE-14003101, Enclosure 1 to Enclosure 6 Concerning Second Set of Responses to April 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Application2014-06-25025 June 2014 Enclosure 1 to Enclosure 6 Concerning Second Set of Responses to April 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Application ML14168A2682014-05-0101 May 2014 Texas Pollutant Discharge Elimination System Major Amendment with Renewal Application for a Major Facility Tpdes Permit No. WQ000190800 NOC-AE-14003103, University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 12014-04-18018 April 2014 University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 1 ML14087A0782014-04-15015 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident (TAC MF0178 & MF0179) NOC-AE-14003114, Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai..2014-03-31031 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai.. NOC-AE-14003082, Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 32014-03-11011 March 2014 Alternate Source Term Dose Analysis: an Estimate of Risk Attributed to GSI-191, Attachment 3 NOC-AE-13003067, Supplement to Seismic Walkdown Summary Report of Items Classified as Inaccessible2014-02-27027 February 2014 Supplement to Seismic Walkdown Summary Report of Items Classified as Inaccessible ML14072A0832014-02-24024 February 2014 CHLE-010, Chle Tank Test Results for Blended and NEI Fiber Beds with Aluminum Addition, Revision 3 ML14072A0872014-02-24024 February 2014 CHLE-016, Calculated Material Release to Estimate Chemical Effects, Revision 3 ML14072A0862014-02-24024 February 2014 CHLE-015, Summary of Chemical Effects Testing in 2012 for STP GSI-191 License Submittal, Revision 4 ML14072A0802014-02-24024 February 2014 CHLE-006, STP Material Calculations, Revision 2 ML14072A0822014-02-23023 February 2014 CHLE-008, Debris Bed Preparation & Formation Test Results, Revision 4 ML14072A0792014-02-22022 February 2014 CHLE-020, Test Results for 10-Day Chemical Effects Test Simulating LBLOCA Condition (T5), Revision 3 ML14072A0882014-02-22022 February 2014 CHLE-018, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions, Revision 3 ML14072A0852014-02-22022 February 2014 CHLE-014, T2 LBLOCA Test Report, Revision 3 ML14072A0842014-02-18018 February 2014 CHLE-012, T1 Mbloca Test Report, Revision 4 ML14072A0772014-02-18018 February 2014 CHLE-005, Determination of the Initial Pool Chemistry for the Chle Test, Revision 2 ML14149A4352014-02-14014 February 2014 Project, Units 1 and 2 - ALION-REP-STP-8998-02, Rev. 0, STP Casa Grande Analysis and LAR Enclosure 4-3 RAI Response, Enclosure 1 to Attachment 1 ML14072A0812014-02-13013 February 2014 CHLE-007, Debris Bed Requirements & Preparation Procedures, Revision 4 ML13339A7362014-01-29029 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13354B8332014-01-23023 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for South Texas Project, Units 1 and 2, TAC Nos.: MF0825 and MF0826 NOC-AE-13003070, Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application2013-12-23023 December 2013 Response to NRC Request for Reference Document for STP Risk-Informed GSI-191 Application ML13323A1862013-11-12012 November 2013 Enclosure 4-1 - Risk-Informed Closure of GSI-191, Volume 1 ML13323A1912013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Page 212 of 1-122 ML13323A1902013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Cover - Page 211 of 248 ML13323A1892013-10-22022 October 2013 Enclosure 4-2 - Risk-Informed Closure of GSI-191, Volume 2 Probabilistic Risk Analysis ML13323B2092013-10-0404 October 2013 Attachment 12: CHLE-020, Rev. 2, Test Results for a 10-day Chemical Effects Test Simulating LBLOCA Conditions (T5). ML13323B2082013-09-23023 September 2013 Attachment 11: CHLE-019, Rev. 2, Test Results for Chemical Effect Tests Stimulating Corrosion and Precipitation (T3 & T4) ML13323B2072013-09-16016 September 2013 Attachment 10: CHLE-018, Rev. 2, Results of Bench Tests to Assess Corrosion of Aluminum in STP Containment Conditions. NOC-AE-13003019, Submittal of Commitment Change Summary Report for the Period June 21, 2011 Through June 21, 20132013-07-18018 July 2013 Submittal of Commitment Change Summary Report for the Period June 21, 2011 Through June 21, 2013 ML13175A2122013-06-18018 June 2013 Project, Units 1 and 2, Enclosure 4-1 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 1 Project Summary NOC-AE-13002986, Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 161 of 260 Through End2013-06-0606 June 2013 Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 161 of 260 Through End 2023-08-31
[Table view] Category:Miscellaneous
MONTHYEARML23243B0562023-08-31031 August 2023 Supplemental Information to Application for Order Approving Indirect Transfer of Control of Licenses ML21182A2412021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report ML17019A0032017-07-11011 July 2017 Attachment 2 to Safety Evaluation - In-Vessel Thermal-Hydraulic Analysis, Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 NOC-AE-17003468, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2017-05-10010 May 2017 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-15003249, Submittal of 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes and Annual Report2015-06-0909 June 2015 Submittal of 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes and Annual Report ML14357A1362015-01-22022 January 2015 Review of Analysis of Capsule Withdrawal Schedule from Reactor Vessel Radiation Surveillance Program NOC-AE-14003190, Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application2014-10-30030 October 2014 Attachment 2 to NOC-AE-14003190 - ALION-REP-STP-8998-14, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application ML14344A5462014-10-30030 October 2014 Attachment 1 to NOC-AE-14003190 - Alion REP-STP-8998-13, Strainer Test Plan in Support of STP Pilot Risk-Informed GSI-191 Pilot Licensing Application Executive Summary NOC-AE-14003178, Update Foreign Ownership, Control, or Influence (FOCI)2014-09-17017 September 2014 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-14003101, Enclosure 1 to Enclosure 6 Concerning Second Set of Responses to April 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Application2014-06-25025 June 2014 Enclosure 1 to Enclosure 6 Concerning Second Set of Responses to April 2014, Requests for Additional Information Regarding STP Risk-Informed GSI-191 Application ML14168A2682014-05-0101 May 2014 Texas Pollutant Discharge Elimination System Major Amendment with Renewal Application for a Major Facility Tpdes Permit No. WQ000190800 NOC-AE-14003103, University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 12014-04-18018 April 2014 University of Texas White Paper, Means of Aggregation and NUREG-1829: Geometric and Arithmetic Means, Rev. 3, Enclosure 2 to Attachment 1 ML14087A0782014-04-15015 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident (TAC MF0178 & MF0179) NOC-AE-14003114, Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai..2014-03-31031 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai.. NOC-AE-13003067, Supplement to Seismic Walkdown Summary Report of Items Classified as Inaccessible2014-02-27027 February 2014 Supplement to Seismic Walkdown Summary Report of Items Classified as Inaccessible ML13323A1862013-11-12012 November 2013 Enclosure 4-1 - Risk-Informed Closure of GSI-191, Volume 1 ML13323A1912013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Page 212 of 1-122 ML13323A1902013-11-0606 November 2013 Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Cover - Page 211 of 248 ML13323A1892013-10-22022 October 2013 Enclosure 4-2 - Risk-Informed Closure of GSI-191, Volume 2 Probabilistic Risk Analysis NOC-AE-13003019, Submittal of Commitment Change Summary Report for the Period June 21, 2011 Through June 21, 20132013-07-18018 July 2013 Submittal of Commitment Change Summary Report for the Period June 21, 2011 Through June 21, 2013 NOC-AE-13003004, Revised Phase 1 Staffing Assessment Submitted in Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights2013-06-0303 June 2013 Revised Phase 1 Staffing Assessment Submitted in Response to Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 9.3 of the Near-Term Task Force Review of Insights ML13141A2852013-04-25025 April 2013 License Amendment Request, Proposed Revision to Technical Specification 5.0, Design Features NOC-AE-12002912, Submittal of 10 CFR 50.46 ECCS Evaluation Model Significant Change/Error Report2012-10-17017 October 2012 Submittal of 10 CFR 50.46 ECCS Evaluation Model Significant Change/Error Report ML12234A6042012-08-21021 August 2012 Email - Documents for NRC Public Meeting on Corrosion Head Loss Experiments (Chle) Part 1 and 2 ML1130606152011-10-31031 October 2011 LOCA Frequencies for STP Nuclear Operating Company GSI-191 ML1130506232011-10-26026 October 2011 Alion- Expected Impact of Chemical Effects on GSI-191 Risk Informed Evaluation for South Texas Project NOC-AE-11002708, 10CFR50.59 Summary Report2011-10-10010 October 2011 10CFR50.59 Summary Report ML11256A0582011-08-31031 August 2011 Documents to Support Review of the South Texas Project License Renewal Application, WR-5, Tceq Id No. 1610103/1610051 (Operation of Public Potable Water System) ML11196A0052011-08-0404 August 2011 Summary of Site Audit Related to the Review of the License Renewal Application for South Texas Project, Units 1 and 2 ML11217A0162011-07-27027 July 2011 Commitment Change Summary Report NOC-AE-09002457, Nuclear Decommissioning Trust Fund Agreements (Updated)2009-09-15015 September 2009 Nuclear Decommissioning Trust Fund Agreements (Updated) NOC-AE-09002445, Submittal of Commitment Change Summary Report for July 31, 2008 Through July 30, 20092009-07-30030 July 2009 Submittal of Commitment Change Summary Report for July 31, 2008 Through July 30, 2009 NOC-AE-09002424, Submittal of Description and Summary of the 10CFR50.59 Evaluations of Changes, Tests and Experiments Report2009-04-28028 April 2009 Submittal of Description and Summary of the 10CFR50.59 Evaluations of Changes, Tests and Experiments Report NOC-AE-08002325, Commitment Change Summary Report2008-08-11011 August 2008 Commitment Change Summary Report ML0807006992008-02-28028 February 2008 Evidence of Financial Protection NOC-AE-07002231, Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46)2007-11-0707 November 2007 Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46) NOC-AE-07002177, Proposed Alternative to ASME Section XI Requirements for Weld Overlay Hold-Time (RR-ENG-2-48)2007-06-19019 June 2007 Proposed Alternative to ASME Section XI Requirements for Weld Overlay Hold-Time (RR-ENG-2-48) NOC-AE-07002168, Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43)2007-05-29029 May 2007 Summary Assessment of Pressurizer Nozzle Safe End Weld Overlays: Shrinkage and Fatigue Crack Growth (RR-ENG-2-43) NOC-AE-06002049, Commitment Change Summary Report2006-08-21021 August 2006 Commitment Change Summary Report NOC-AE-06001977, Submittal of Nuclear Insurance Protection2006-02-0909 February 2006 Submittal of Nuclear Insurance Protection NOC-AE-05001919, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Ecw Train 1A)2005-09-0808 September 2005 Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Ecw Train 1A) NOC-AE-05001874, Transmittal of the 10CFR50.59 Summary Report2005-04-28028 April 2005 Transmittal of the 10CFR50.59 Summary Report ML0532204612004-06-14014 June 2004 Power Reactor Status Report for 6/14/04 ML0319800132003-07-18018 July 2003 Misc Report ,Stars, 6/10-11/2003 Licensing Workshop Held in Overland Park, Kansas with Strategic Teaming and Resource Sharing-Integrated Regulatory Affairs Group for Licensees of Callaway, Comanche Peak, Diablo Canyon, Palo Verde, So Texas NOC-AE-03001532, Request for One-Time Approval of an Alternative Approach for Containment Tendon Surveillances2003-05-15015 May 2003 Request for One-Time Approval of an Alternative Approach for Containment Tendon Surveillances NOC-AE-03001509, Special Report Re Power-Operated Relief Valve Actuation to Mitigate Reactor Coolant System Pressure Transient2003-04-25025 April 2003 Special Report Re Power-Operated Relief Valve Actuation to Mitigate Reactor Coolant System Pressure Transient NOC-AE-02001277, Project Comprehensive Cultural Assessment2002-04-17017 April 2002 Project Comprehensive Cultural Assessment 2023-08-31
[Table view] |