Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23235A172 | 23 August 2023 | Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report | |
ML21350A114 | 16 December 2021 | Annual Commitment Change Notification | |
ML21316A051 | 12 November 2021 | Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections | EVT-1 |
ML20303A175 | 23 October 2020 | Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting | |
ML17345A990 | 21 December 2017 | R. E. Ginna Nuclear Power Plant Flood Hazard Mitigation Strategies Assessment | High winds FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Flood Hazard Mitigation Strategies Assessment |
ML17214A118 | 27 July 2017 | Transmittal of 2017 Owner'S Activity Report for the Plant | |
ML15153A026 | 11 June 2015 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insight | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML15167A505 | 11 June 2015 | (Redacted Version) Response to Request for Additional Information Regarding the License Amendment Request (LAR) to Adopt NFPA 805, Attachment 3 | Hot Short Safe Shutdown Fire Barrier Coatings Hemyc Earthquake Fire Protection Program Fire Watch |
ML14170B022 | 26 June 2014 | Staff Assessment of Flooding Walkdown Reports Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Accident | Safe Shutdown Unanalyzed Condition Time of Discovery Hydrostatic Operator Manual Action Locked High Radiation Area Fukushima Dai-Ichi Earthquake |
ML14099A196 | 31 March 2014 | Constellation Energy Nuclear Group, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task. | Safe Shutdown Unanalyzed Condition Mission time Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Fukushima Dai-Ichi Design basis earthquake Operability Determination Earthquake Operability Assessment Seismic Walkdown Report |
ML13294A023 | 16 October 2013 | Snubber Program Plan | High Radiation Area Nondestructive Examination |
ML13066A171 | 28 February 2013 | R.E. Gina, Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Tornado Missile Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Emergency Lighting FLEX Tornado Generated Missile Fukushima Dai-Ichi Design basis earthquake Spent Fuel Pool Instrumentation B.5.b Mitigating Strategies Earthquake Pressure Boundary Leakage Fire Protection Program |
ML12362A452 | 21 December 2012 | Supplemental Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3. Seismic, Attachment (3) Area Walk-By Checklists Through End | Boric Acid Aging Management Scaffolding |
ML12362A451 | 21 December 2012 | Supplemental Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3. Seismic, Attachment (1) Supplemental Seismic Walkdown Report, Table of Contents Through Attachment (2) Seismic Walkdown Checklists, Page B-90 | Safe Shutdown Unanalyzed Condition Boric Acid Locked High Radiation Area Fukushima Dai-Ichi Seismically rugged License Renewal Earthquake Seismic Walkdown Report |
ML12277A174 | 28 September 2012 | R. E. Ginna - License Renewal Aging Management, Submit Revised Reactor Vessel Internals Program Document in Accordance with RIS 2011-07 | Boric Acid Nondestructive Examination Functionality Assessment Aging Management EVT-1 |
ML11343A679 | 6 December 2011 | Report of Facility Changes. Tests, and Experiments Conducted Without Prior Commission Approval | |
ML102730623 | 22 September 2010 | R. E. Ginna - Transmittal of RCS Pressure and Temperature Limits Report (PTLR) | Pressure and Temperature Limits Report |
ML101270439 | 5 May 2010 | Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants | |
ML100920057 | 29 March 2010 | Report of Facility Changes, Tests, and Experiments Conducted Without Prior Commission Approval | |
ML090641103 | 27 February 2009 | R. E. Ginna Nuclear Power Plant - License Renewal Aging Management Reactor Vessel Internals Program | Boric Acid Non-Destructive Examination Nondestructive Examination Functionality Assessment Aging Management EVT-1 |
ML12220A101 | 24 November 2008 | Constellation Energy Group, Inc. Definitive Proxy Statement Schedule 14A | Incorporated by reference Grace period Stolen |
ML082740268 | 23 September 2008 | Transmittal of Steam Generator Examination Report for the R.E. Ginna Nuclear Power Plant Conducted in 2008 | |
ML080710041 | 29 February 2008 | R.E. Ginna, Supplement Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | Safe Shutdown Boric Acid Mission time Coatings Design basis earthquake Foreign Material Exclusion Exemption Request |
ML052920418 | 10 October 2005 | R. E. Ginna - Report of Facility Changes, Tests, and Experiments Conducted Without Prior Commission Approval | Temporary Modification |
ML072700849 | 31 January 2005 | Caldon Experience in Nuclear Feedwater Flow Measurement | Power change |
ML041480294 | 21 May 2004 | Appendix R Summary for the Proposed Control Room Emergency Air Treatment System (Creats) Modification | Safe Shutdown Fire Barrier Emergency Lighting Exemption Request Fire Protection Program Fire Watch |
ML040550270 | 11 November 2003 | to PCR 2000-0024, Control Room Emergency Air Treatment System (Creats) and Control Room Emergency Heating/Cooling System. | Safe Shutdown Tornado Missile Safe Shutdown Earthquake Coatings Operating Basis Earthquake Earthquake Fire Protection Program Power Uprate |
ML040550271 | 30 July 2003 | to Specification ME-326, Control Room Emergency Air Treatment System (Creats) and Emergency Cooling System Design, Fabrication, & Installation Specification. | Fitness for Duty Loop seal Fire Barrier Commercial Grade Dedication Safe Shutdown Earthquake Coatings Operating Basis Earthquake Foreign Material Exclusion Earthquake Fire Watch Scaffolding GOTHIC |
ML031890462 | 10 July 2003 | Relaxation of the Order, Exercising Enforcement Discretion, and Extension of the Time to Submit an Answer or Request a Hearing Regarding Order EA-03-038, Fitness-for-Duty Enhancements for Nuclear Security Force Personnel for R.E. Ginna | Enforcement Discretion |
ML031690230 | 10 June 2003 | Supplemental Response to LRA Request for Additional Information | Fire Barrier Hydrostatic Aging Management Fire Protection Program |
ML023220312 | 4 November 2002 | Attachment 3, Model 956-201 Failure History Summary | Safe Shutdown |
ML023220273 | 1 November 2002 | Attachment 1, Qualification Report 950.366, Rev. 2 for Ginna Project P. O. 450008671 | |
ML023220323 | 28 October 2002 | Software Validation Test Procedure for Prom P/N 94095603 G-M Area Monitor | |
ML022400418 | 16 August 2002 | Rochester Gas & Electric Corp., FFD Performance Data Report for January-June 2002 | Fitness for Duty |
ML020670238 | 22 February 2002 | Submittal of Fitness-For-Duty Performance Data Report for Six Months Ending 12/31/2001 for Ginna Station | Fitness for Duty |
ML18143A831 | 17 January 1973 | Monthly Report of Activity Measurements for November 26, 1972 Through December 31, 1972 | |
ML18143A834 | 15 November 1972 | Monthly Report of Activity Measurements for September 26, 1972 Through October 25, 1972 | |
ML18143A835 | 16 October 1972 | Monthly Report of Activity Measurements | Power change |
ML18143A838 | 6 September 1972 | Monthly Report of Activity Measurements for July 26, 1972 Through August 25, 1972 | Power change |