Issue date | Title | Topic | |
---|---|---|---|
ML23235A172 | 23 August 2023 | Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report | |
ML21350A114 | 16 December 2021 | Annual Commitment Change Notification | |
ML21316A051 | 12 November 2021 | Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections | EVT-1 |
ML21263A186 | 20 September 2021 | Proposed Alternative Concerning Pressure Testing of ASME Section XI Class 2 Portions of the Auxiliary Feedwater System | Safe Shutdown VT-2 Through-Wall Leakage |
ML21013A530 | 13 January 2021 | Reactor Vessel Level Monitoring System Special Report | |
ML20303A175 | 23 October 2020 | Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting | |
ML17345A990 | 21 December 2017 | R. E. Ginna Nuclear Power Plant Flood Hazard Mitigation Strategies Assessment | High winds FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Flood Hazard Mitigation Strategies Assessment |
ML17324B369 | 20 December 2017 | Flood Hazard Mitigation Strategies Assessment | Internal Flooding FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Flood Hazard Mitigation Strategies Assessment |
ML17214A118 | 27 July 2017 | Transmittal of 2017 Owner'S Activity Report for the Plant | |
RS-16-181, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal | 9 November 2016 | Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal | Boric Acid Shutdown Margin Ultimate heat sink FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation |
ML16061A016 | 26 February 2016 | ISFSI - Report of Changes, Tests, and Experiments - 10 CFR 50.59 and 10 CFR 72-48 | Tornado Missile |
ML16057A002 | 25 February 2016 | Report Concerning Dissimilar Metal Weld Flaw in Pressurizer Safety Relief Nozzle-to-Safe-End Weld | Weld Overlay Finite Element Analysis Dissimilar Metal Weld DM weld |
ML16076A352 | 24 February 2016 | Plants, Units 1 and 2 - E-mail Re. Draft Report Concerning Dissimilar Metal Weld Indication on Pressurizer Safety Relief Nozzel to Safe End Weld | Finite Element Analysis Dissimilar Metal Weld DM weld |
ML15350A108 | 19 January 2016 | Review of the 2015 Steam Generator Tube Inspections | |
ML15281A218 | 21 October 2015 | Supplement to Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood Causing Mechanism Reevaluation | Fukushima Dai-Ichi |
ML15167A505 | 11 June 2015 | (Redacted Version) Response to Request for Additional Information Regarding the License Amendment Request (LAR) to Adopt NFPA 805, Attachment 3 | Hot Short Safe Shutdown Fire Barrier Coatings Hemyc Earthquake Fire Protection Program Fire Watch |
ML15153A026 | 11 June 2015 | Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insight | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
RS-15-095, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 30 April 2015 | Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | Spent Fuel Pool Instrumentation |
ML15062A043 | 27 February 2015 | Report of Changes, Tests, and Experiments - 10 CFR 50.59 and 10 CFR 72.48 | |
L-14-036, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 17 December 2014 | Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Boric Acid Shutdown Margin FLEX Fukushima Dai-Ichi Earthquake Power-Operated Valves Power Operated Valves |
ML14170B022 | 26 June 2014 | Staff Assessment of Flooding Walkdown Reports Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Accident | Safe Shutdown Unanalyzed Condition Time of Discovery Hydrostatic Operator Manual Action Locked High Radiation Area Fukushima Dai-Ichi Earthquake |
ML14206B009 | 12 May 2014 | Considerations for Using Zinc in Refined GSI-191 Chemical Effects Testing. CCNPP-CHLE-008, Revision 4 | Coatings |
ML14099A196 | 31 March 2014 | Constellation Energy Nuclear Group, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task. | Safe Shutdown Unanalyzed Condition Mission time Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Fukushima Dai-Ichi Design basis earthquake Operability Determination Earthquake Operability Assessment Seismic Walkdown Report |
ML13225A566 | 17 December 2013 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049(Mitigation Strategies) | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Mission time Time to boil Safe Shutdown Earthquake Internal Flooding Emergency Lighting FLEX Tornado Generated Missile Fukushima Dai-Ichi Seismically rugged Frazil ice Battery sizing B.5.b Mitigating Strategies Earthquake |
ML13294A023 | 16 October 2013 | Snubber Program Plan | High Radiation Area Nondestructive Examination |
ML13224A103 | 8 August 2013 | CCNPP-CHLE-007, Revision 0c, Coatings Bench-Top Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant. | Boric Acid Coatings |
ML13078A010 | 12 March 2013 | Flood Hazard Reevaluation Report | Safe Shutdown Unanalyzed Condition Internal Flooding Hydrostatic Fukushima Dai-Ichi Earthquake |
ML13066A171 | 28 February 2013 | R.E. Gina, Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Tornado Missile Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Emergency Lighting FLEX Tornado Generated Missile Fukushima Dai-Ichi Design basis earthquake Spent Fuel Pool Instrumentation B.5.b Mitigating Strategies Earthquake Pressure Boundary Leakage Fire Protection Program |
ML12362A451 | 21 December 2012 | Supplemental Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3. Seismic, Attachment (1) Supplemental Seismic Walkdown Report, Table of Contents Through Attachment (2) Seismic Walkdown Checklists, Page B-90 | Safe Shutdown Unanalyzed Condition Boric Acid Locked High Radiation Area Fukushima Dai-Ichi Seismically rugged License Renewal Earthquake Seismic Walkdown Report |
ML12362A452 | 21 December 2012 | Supplemental Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3. Seismic, Attachment (3) Area Walk-By Checklists Through End | Boric Acid Aging Management Scaffolding |
ML12277A174 | 28 September 2012 | R. E. Ginna - License Renewal Aging Management, Submit Revised Reactor Vessel Internals Program Document in Accordance with RIS 2011-07 | Boric Acid Nondestructive Examination Functionality Assessment Aging Management EVT-1 |
ML12055A048 | 22 February 2012 | Independent Spent Fuel Storage Installation, Report of Changes, Tests, and Experiments - 10 CFR 50.59 and 10 CFR 72.48 | |
ML12027A012 | 24 January 2012 | Core Operating Limits Report for Unit 1, Cycle 20 | Shutdown Margin Coatings |
ML11343A679 | 6 December 2011 | Report of Facility Changes. Tests, and Experiments Conducted Without Prior Commission Approval | |
ML110940039 | 31 March 2011 | 10 CFR 50.46 30-day Report for Changes to the Emergency Core Cooling System Performance Analysis | |
ML102730623 | 22 September 2010 | R. E. Ginna - Transmittal of RCS Pressure and Temperature Limits Report (PTLR) | Pressure and Temperature Limits Report |
ML102430202 | 27 August 2010 | Reactor Vessel Water Level Monitoring System Special Report | Reactor Vessel Water Level |
ML101270439 | 5 May 2010 | Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants | |
ML100920057 | 29 March 2010 | Report of Facility Changes, Tests, and Experiments Conducted Without Prior Commission Approval | |
ML093520540 | 25 November 2009 | Submittal of Updated List of Facility Emission Inventory Registration | |
ML091190158 | 24 April 2009 | Post-Accident Monitoring Report | Reactor Vessel Water Level |
ML090641103 | 27 February 2009 | R. E. Ginna Nuclear Power Plant - License Renewal Aging Management Reactor Vessel Internals Program | Boric Acid Non-Destructive Examination Nondestructive Examination Functionality Assessment Aging Management EVT-1 |
ML12220A101 | 24 November 2008 | Constellation Energy Group, Inc. Definitive Proxy Statement Schedule 14A | Incorporated by reference Grace period Stolen |
ML082760283 | 1 October 2008 | Attachments 1 & 2, Calvert Cliffs Nuclear Power Plant Inc., Proposed Alternative ISI-020, and Proposed Alternative ISI-021 | Probabilistic Risk Assessment |
ML082740495 | 30 September 2008 | Calvert Cliffs Nuclear Plant, Attachment 1, Supplemental Response to Generic Letter 2004-02 | Mission time Fire Barrier Stroke time Coatings Operating Basis Earthquake Foreign Material Exclusion Exemption Request Earthquake Maintenance Rule Program Scaffolding |
ML082740497 | 30 September 2008 | Calvert Cliffs Nuclear Plant, Attachment 2, ECCS and CS System Figures | |
ML082740268 | 23 September 2008 | Transmittal of Steam Generator Examination Report for the R.E. Ginna Nuclear Power Plant Conducted in 2008 | |
ML080740227 | 12 March 2008 | Response to Request for Additional Information Control Room Habitability | |
ML080710041 | 29 February 2008 | R.E. Ginna, Supplement Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors | Safe Shutdown Boric Acid Mission time Coatings Design basis earthquake Foreign Material Exclusion Exemption Request |
ML080500445 | 14 February 2008 | Report of Changes, Tests, and Experiments - 10 CFR 50.59 and 10 CFR 72.48 |