Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23235A17223 August 2023Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report
ML21350A11416 December 2021Annual Commitment Change Notification
ML21316A05112 November 2021Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational ProjectionsEVT-1
ML21263A18620 September 2021Proposed Alternative Concerning Pressure Testing of ASME Section XI Class 2 Portions of the Auxiliary Feedwater SystemSafe Shutdown
VT-2
Through-Wall Leakage
ML21013A53013 January 2021Reactor Vessel Level Monitoring System Special Report
ML20303A17523 October 2020Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting
ML17345A99021 December 2017R. E. Ginna Nuclear Power Plant Flood Hazard Mitigation Strategies AssessmentHigh winds
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Flood Hazard Mitigation Strategies Assessment
ML17324B36920 December 2017Flood Hazard Mitigation Strategies AssessmentInternal Flooding
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
Flood Hazard Mitigation Strategies Assessment
ML17214A11827 July 2017Transmittal of 2017 Owner'S Activity Report for the Plant
RS-16-181, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal9 November 2016Mitigating Strategies Flood Hazard Assessment (Msfha) SubmittalBoric Acid
Shutdown Margin
Ultimate heat sink
FLEX
Fukushima Dai-Ichi
Spent Fuel Pool Instrumentation
ML16061A01626 February 2016ISFSI - Report of Changes, Tests, and Experiments - 10 CFR 50.59 and 10 CFR 72-48Tornado Missile
ML16057A00225 February 2016Report Concerning Dissimilar Metal Weld Flaw in Pressurizer Safety Relief Nozzle-to-Safe-End WeldWeld Overlay
Finite Element Analysis
Dissimilar Metal Weld
DM weld
ML16076A35224 February 2016Plants, Units 1 and 2 - E-mail Re. Draft Report Concerning Dissimilar Metal Weld Indication on Pressurizer Safety Relief Nozzel to Safe End WeldFinite Element Analysis
Dissimilar Metal Weld
DM weld
ML15350A10819 January 2016Review of the 2015 Steam Generator Tube Inspections
ML15281A21821 October 2015Supplement to Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood Causing Mechanism ReevaluationFukushima Dai-Ichi
ML15167A50511 June 2015(Redacted Version) Response to Request for Additional Information Regarding the License Amendment Request (LAR) to Adopt NFPA 805, Attachment 3Hot Short
Safe Shutdown
Fire Barrier
Coatings
Hemyc
Earthquake
Fire Protection Program
Fire Watch
ML15153A02611 June 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of InsightSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
RS-15-095, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)30 April 2015Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)Spent Fuel Pool Instrumentation
ML15062A04327 February 2015Report of Changes, Tests, and Experiments - 10 CFR 50.59 and 10 CFR 72.48
L-14-036, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident17 December 2014Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentBoric Acid
Shutdown Margin
FLEX
Fukushima Dai-Ichi
Earthquake
Power-Operated Valves
Power Operated Valves
ML14170B02226 June 2014Staff Assessment of Flooding Walkdown Reports Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima AccidentSafe Shutdown
Unanalyzed Condition
Time of Discovery
Hydrostatic
Operator Manual Action
Locked High Radiation Area
Fukushima Dai-Ichi
Earthquake
ML14206B00912 May 2014Considerations for Using Zinc in Refined GSI-191 Chemical Effects Testing. CCNPP-CHLE-008, Revision 4Coatings
ML14099A19631 March 2014Constellation Energy Nuclear Group, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task.Safe Shutdown
Unanalyzed Condition
Mission time
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
Design basis earthquake
Operability Determination
Earthquake
Operability Assessment
Seismic Walkdown Report
ML13225A56617 December 2013Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049(Mitigation Strategies)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Mission time
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Seismically rugged
Frazil ice
Battery sizing
B.5.b Mitigating Strategies
Earthquake
ML13294A02316 October 2013Snubber Program PlanHigh Radiation Area
Nondestructive Examination
ML13224A1038 August 2013CCNPP-CHLE-007, Revision 0c, Coatings Bench-Top Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant.Boric Acid
Coatings
ML13078A01012 March 2013Flood Hazard Reevaluation ReportSafe Shutdown
Unanalyzed Condition
Internal Flooding
Hydrostatic
Fukushima Dai-Ichi
Earthquake
ML13066A17128 February 2013R.E. Gina, Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External EventsSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Emergency Lighting
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Design basis earthquake
Spent Fuel Pool Instrumentation
B.5.b Mitigating Strategies
Earthquake
Pressure Boundary Leakage
Fire Protection Program
ML12362A45121 December 2012Supplemental Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3. Seismic, Attachment (1) Supplemental Seismic Walkdown Report, Table of Contents Through Attachment (2) Seismic Walkdown Checklists, Page B-90Safe Shutdown
Unanalyzed Condition
Boric Acid
Locked High Radiation Area
Fukushima Dai-Ichi
Seismically rugged
License Renewal
Earthquake
Seismic Walkdown Report
ML12362A45221 December 2012Supplemental Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3. Seismic, Attachment (3) Area Walk-By Checklists Through EndBoric Acid
Aging Management
Scaffolding
ML12277A17428 September 2012R. E. Ginna - License Renewal Aging Management, Submit Revised Reactor Vessel Internals Program Document in Accordance with RIS 2011-07Boric Acid
Nondestructive Examination
Functionality Assessment
Aging Management
EVT-1
ML12055A04822 February 2012Independent Spent Fuel Storage Installation, Report of Changes, Tests, and Experiments - 10 CFR 50.59 and 10 CFR 72.48
ML12027A01224 January 2012Core Operating Limits Report for Unit 1, Cycle 20Shutdown Margin
Coatings
ML11343A6796 December 2011Report of Facility Changes. Tests, and Experiments Conducted Without Prior Commission Approval
ML11094003931 March 201110 CFR 50.46 30-day Report for Changes to the Emergency Core Cooling System Performance Analysis
ML10273062322 September 2010R. E. Ginna - Transmittal of RCS Pressure and Temperature Limits Report (PTLR)Pressure and Temperature Limits Report
ML10243020227 August 2010Reactor Vessel Water Level Monitoring System Special ReportReactor Vessel Water Level
ML1012704395 May 2010Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants
ML10092005729 March 2010Report of Facility Changes, Tests, and Experiments Conducted Without Prior Commission Approval
ML09352054025 November 2009Submittal of Updated List of Facility Emission Inventory Registration
ML09119015824 April 2009Post-Accident Monitoring ReportReactor Vessel Water Level
ML09064110327 February 2009R. E. Ginna Nuclear Power Plant - License Renewal Aging Management Reactor Vessel Internals ProgramBoric Acid
Non-Destructive Examination
Nondestructive Examination
Functionality Assessment
Aging Management
EVT-1
ML12220A10124 November 2008Constellation Energy Group, Inc. Definitive Proxy Statement Schedule 14AIncorporated by reference
Grace period
Stolen
ML0827602831 October 2008Attachments 1 & 2, Calvert Cliffs Nuclear Power Plant Inc., Proposed Alternative ISI-020, and Proposed Alternative ISI-021Probabilistic Risk Assessment
ML08274049530 September 2008Calvert Cliffs Nuclear Plant, Attachment 1, Supplemental Response to Generic Letter 2004-02Mission time
Fire Barrier
Stroke time
Coatings
Operating Basis Earthquake
Foreign Material Exclusion
Exemption Request
Earthquake
Maintenance Rule Program
Scaffolding
ML08274049730 September 2008Calvert Cliffs Nuclear Plant, Attachment 2, ECCS and CS System Figures
ML08274026823 September 2008Transmittal of Steam Generator Examination Report for the R.E. Ginna Nuclear Power Plant Conducted in 2008
ML08074022712 March 2008Response to Request for Additional Information Control Room Habitability
ML08071004129 February 2008R.E. Ginna, Supplement Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water ReactorsSafe Shutdown
Boric Acid
Mission time
Coatings
Design basis earthquake
Foreign Material Exclusion
Exemption Request
ML08050044514 February 2008Report of Changes, Tests, and Experiments - 10 CFR 50.59 and 10 CFR 72.48