Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23110A11220 April 2023Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G
ML23018A22018 January 2023Quality Assurance Program Manual Reduction in Commitment
ML22104A07814 April 2022Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart GSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
ML20079J09522 January 2020Emergency Implementation Procedure 2-001 Revision 28Safe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Internal Flooding
Met Tower
Operating Basis Earthquake
Cyber Security
FLEX
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Process Control Program
Earthquake
Maintenance Rule Program
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
Grace period
ML17109A48710 April 2017Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart GSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
RBG-47603, Revisions to the Technical Requirements Manual and the Technical Specifications Bases11 August 2015Revisions to the Technical Requirements Manual and the Technical Specifications BasesSafe Shutdown
Loop seal
Ultimate heat sink
Fire Barrier
Internal Flooding
FLEX
Missed surveillance
Spent Fuel Pool Instrumentation
Battery sizing
Turbine Missile
Fuel cladding
Recently irradiated fuel
ENOC-13-00029, Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096)4 November 2013Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096)
RBG-47380, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases25 July 2013Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification BasesSafe Shutdown
Reactor Vessel Water Level
Grab sample
Fire Barrier
Internal Flooding
Tornado Generated Missile
Turbine Missile
Pressure Boundary Leakage
Offsite Circuit
CNRO-2013-00007, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G26 April 2013Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart GSafe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
ML13022A1957 November 2012Abb Model 27H Under-Voltage Relays in Calc G13.18.6.2-ENS*006
RBG-47169, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases3 August 2011Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification BasesShutdown Margin
Reactor Vessel Water Level
Grab sample
Anticipated operational occurrence
Hydrostatic
Probabilistic Risk Assessment
Scram Discharge Volume
Feedwater Controller Failure
Offsite Circuit
ML09041032215 April 2008Entergy'S Quality Assurance Program Manual, Revision 18; Effective: April 15, 2008Safe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
ENOC-07-00020, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 1615 June 2007Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 16Safe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
ML06142031117 November 2005Attachment 1, Offsite Dose Calculation Manual (ODCM)Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
CNRO-2005-00024, Entergy Quality Assurance Program Manual, Revision 126 April 2005Entergy Quality Assurance Program Manual, Revision 12Safe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
RBG-46179, Revisions to the Technical Requirements Manual and the Technical Specification Bases1 October 2003Revisions to the Technical Requirements Manual and the Technical Specification BasesSafe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Missed surveillance
Abnormal operational transient
Scram Discharge Volume
Annual Radiological Environmental Operating Report
Process Control Program
Fuel cladding
Recently irradiated fuel
Offsite Circuit
Fire Protection Program
ML03126000224 April 2003Issuance of Entergy Quality Assurance Program Manual (Qapm), Revision 8Safe Shutdown
Non-Destructive Examination
Coatings
Temporary Modification
Process Control Program
Fire Protection Program
Grace period
ML04127029110 March 2003RSP-0008, Off-Site Dose Calculation Manual (Odcm), Revision 12Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
RBG-45935, Part B - Revisions 58 -76 to River Bend Station Technical Requirements Manual & Technical Specification Bases10 April 2002Part B - Revisions 58 -76 to River Bend Station Technical Requirements Manual & Technical Specification BasesSafe Shutdown
Unanalyzed Condition
Reactor Vessel Water Level
Loop seal
High Radiation Area
Stroke time
Anticipated operational occurrence
Hydrostatic
Qualified Offsite Circuit
Feedwater Controller Failure
Fuel cladding
Recently irradiated fuel
Offsite Circuit