Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23341A13716 January 2024Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning
ML23192A82114 August 2023and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower LocationFire Protection Program
ML23081A4662 May 2023Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel GeneratorSafe Shutdown
Probabilistic Risk Assessment
FLEX
Battery sizing
Maintenance Rule Program
Offsite Circuit
Fire Protection Program
ML23044A10513 March 2023Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements ManualSafe Shutdown
Probabilistic Risk Assessment
Fire Protection Program
ML23037A9719 March 2023and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical ReportFire Protection Program
ML22194A81710 August 2022Issuance of Amendment No. 232 Revise Surveillance Requirements for Electric Power Monitor Channels for Reactor Protection System and Power Range Neutron Monitoring SystemHalf scram
Surveillance Frequency Control Program
ML21348A71314 March 2022Issuance of Amendment No. 231 Revision of Technical Specification Limits for Ultimate Heat SinkSafe Shutdown
Ultimate heat sink
Anticipated operational occurrence
Safe Shutdown Earthquake
Surveillance Frequency Control Program
Recently irradiated fuel
ML22056A0104 March 2022and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Correction Letter of Amendment Nos. 230, 342, and 323 Deletion of Specified Definitions and FiguresOffsite Dose Calculation Manual
ML22012A43514 February 2022and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Nos. 230, 342, and 323 Delete Definition in 10 CFR 20 and Figures of Site and Surrounding AreasShutdown Margin
Offsite Dose Calculation Manual
Pressure and Temperature Limits Report
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Spiral reload
Pressure Boundary Leakage
Fire Protection Program
ML22031A2761 February 2022Issuance of Indemnity Agreement Amendments-Enclosure 2
ML22021B6591 February 2022Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter)
ML22021B6601 February 2022Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1Safe Shutdown
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Cyber Security
Aging Management
Annual Radioactive Effluent Release Report
Safeguards Contingency Plan
Preemption Authority
License Renewal
Subsequent License Renewal
Fuel cladding
Liquid penetrant
Fire Protection Program
Scaffolding
Unidentified leakage
Power Uprate
ML21341B4268 December 2021Correction Letter of Amendment No. 229 Revise Low Pressure Safety Limit to Address General Electric Nuclear Energy Part 21 Safety Communication SC05-03
ML21295A22915 November 2021Issuance of Amendment Nos. 340 and 321 Revise Technical Specifications to Adopt TSTF 569, Revision of Response Time Testing DefinitionsShutdown Margin
Packing leak
Anticipated operational occurrence
Fire Protection Program
ML21202A0783 September 2021Issuance of Amendment Nos. 338 and 320 Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube InspectionsNondestructive Examination
Fire Protection Program
ML21181A05617 August 2021Issuance of Amendment No. 229 Revise Low Pressure Safety Limit to Address General Electric Nuclear Energy Part-21 Safety Communication SC05-03 (EPID L 2020 Lla 0210) (Non-Proprietary)Anticipated operational occurrence
Fuel cladding
ML21195A0623 August 2021Issuance of Amendment No. 319 One-Time Request to Revise Technical Specification Action for Rod Position IndicatorsShutdown Margin
Anticipated operational occurrence
Probabilistic Risk Assessment
Power change
ML21110A05219 July 2021Issuance of Amendment Nos. 337 and 318, Revise Technical Specifications to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech SpecShutdown Margin
Packing leak
Offsite Dose Calculation Manual
Surveillance Frequency Control Program
Process Control Program
Pressure Boundary Leakage
Fire Protection Program
Power change
LR-N21-0030, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) Surveillance Requirements (SR) for Auxiliary Feedwater17 June 2021License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) Surveillance Requirements (SR) for Auxiliary Feedwater
ML21098A08726 April 2021Issuance of Amendment No. 228 Adopt Technical Specifications Task Force TSTF-427, Allowance for Non Technical Specification Barrier Degradation on Supported System OperabilityHigh winds
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Turbine Missile
ML21050A00212 March 2021Issuance of Amendment No. 227 Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, RPV WIC EnhancementsReactor Vessel Water Level
Water Inventory Control
Surveillance Frequency Control Program
Fuel cladding
Recently irradiated fuel
Offsite Circuit
ML21047A31310 March 2021Issuance of Amendment No. 226 Revise Emergency Core Cooling System Technical Specification for High Pressure Coolant Injection System Inoperability (Non-Proprietary)Water Inventory Control
Probabilistic Risk Assessment
ML20338A03823 February 2021Issuance of Amendment Nos. 336 and 317 Leak-Before-Break for Accumulator, Residual Heat Removal, Safety Injection, and Pressurizer Surge LinesGrab sample
Safe Shutdown Earthquake
Surveillance Frequency Control Program
Pressure Boundary Leakage
Pressure boundary leak
Dissimilar Metal Weld
ML20281A6139 November 2020Issuance of Amendment No. 225 Revise Technical Specification Actions for Suppression Pool CoolingSurveillance Frequency Control Program
ML20231A63229 September 2020Issuance of Amendment No. 224 Regarding Adoption of 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components of Nuclear Power ReactorsHigh winds
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Cyber Security
Incorporated by reference
FLEX
Fukushima Dai-Ichi
Tornado Missile Protection
Large early release frequency
Flooding Focused Evaluation
ML20191A2036 August 2020Issuance of Amendment Nos. 335 & 316-Revise Minimum Required Channels, Mode Applicability, & Actions for Source Range/Intermediate Range Neutron Flux Reactor Trip System InstrumentationShutdown Margin
Surveillance Frequency Control Program
Fire Protection Program
ML20034E61727 February 2020and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License TransferEVT-1
ML19352F23118 February 2020and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Issuance of Amendment Nos. 221, 332, and 313 Revise Emergency Plan Staffing Requirements
ML19330F15614 January 2020Issuance of Amendment Nos. 331 and 312 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control ProgramAnticipated operational occurrence
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Fire Protection Program
ML19275D69418 November 2019Issuance of Amendment Nos. 330 and 311 Revise Technical Specifications to Adopt TSFT-547, Clarification of Rod Position RequirementsShutdown Margin
Surveillance Frequency Control Program
Fire Protection Program
ML19289A8867 November 2019Issuance of Amendment No. 220 Regarding Revise Technical Specifications to Adopt TSTF-546, Revise APRM (Average Power Range Monitor) Channel Adjustment Surveillance RequirementSurveillance Frequency Control Program
Scram Discharge Volume
Fuel cladding
Power change
ML19218A30519 September 2019Issuance of Amendment No. 219 Regarding Revise Technical Specifications to Adopt TSFF-564, Safety Limit MCPRShutdown Margin
Anticipated operational occurrence
Hydrostatic
Pressure and Temperature Limits Report
Fuel cladding
ML19205A3066 September 2019Issuance of Amendment No. 218 Regarding Revised Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance RequirementsShutdown Margin
Surveillance Frequency Control Program
Recently irradiated fuel
ML19186A2056 August 2019Issuance of Amendment No. 217 Remote Shutdown SystemSafe Shutdown
Surveillance Frequency Control Program
LR-N19-0047, License Amendment Request to Relocate Technical Specifications (TS) 3.9.3 and 3.9.12 to the Technical Requirements Manual (TRM)28 June 2019License Amendment Request to Relocate Technical Specifications (TS) 3.9.3 and 3.9.12 to the Technical Requirements Manual (TRM)Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Surveillance Frequency Control Program
ML19105B17131 May 2019Issuance of Amendment Nos. 329 and 310 Revise Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves, and Add New TSAnticipated operational occurrence
Surveillance Frequency Control Program
Fire Protection Program
ML19073A07330 April 2019Issuance of Amendment No. 216 Revise Technical Specification 3/4.8.1, A.C. Sources - Operating, Action for Inoperable Diesel GeneratorSafe Shutdown
FLEX
Offsite Circuit
ML19077A33611 April 2019Issuance of Amendment Nos. 328 and 309 Revise Technical Specifications to Extend Refueling Water Storage Tank Allowed Outage TimeBoric Acid
Shutdown Margin
Surveillance Frequency Control Program
Fire Protection Program
ML19065A15627 March 2019Issuance of Amendment No. 215 Inverter Allowed Outage Time ExtensionSafe Shutdown
High winds
Anticipated operational occurrence
Internal Flooding
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
Maintenance Rule Program
ML19044A6276 March 2019and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 214, 327, and 308 Revise Technical Specifications to Adopt TSTF-529Time of Discovery
Fire Protection Program
ML19009A47725 January 2019Issuance of Amendment Nos. 326 and 307 Revise Technical Specifications to Increase Vital Instrument Bus Inverter Allowed Outage TimeHigh winds
Internal Flooding
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Surveillance Frequency Control Program
Large early release frequency
Maintenance Rule Program
Fire Protection Program
ML18318A26619 December 2018Issuance of Amendment Nos. 325 and 306 Revise TS Reactor Trip System Instrumentation and Engineered Safety Features Actuation System Instrumentation Test Times and Completion TimesShutdown Margin
Mission time
Anticipated operational occurrence
Internal Flooding
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Large early release frequency
Fire Protection Program
ML18260A20330 October 2018Issuance of Amendment No. 213 Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory ControlReactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Water Inventory Control
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Fuel cladding
Recently irradiated fuel
ML18096A54224 April 2018Hope Creek Generating Station - Issuance of Amendment Measurement Uncertainty Recapture Power Uprate (CAC MF9930; EPID L-2017-LLS-0002)Safe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Hydrostatic
Probabilistic Risk Assessment
Coatings
Operator Manual Action
Multiple Spurious Operation
Aging Management
Abnormal operational transient
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Scram Discharge Volume
Process Control Program
MELLLA
License Renewal
Turbine Missile
Fuel cladding
Fire Protection Program
Power change
Power Uprate
Measurement Uncertainty Recapture
ML18040A77818 April 2018Issuance of Amendment Nos. 323 and 304 Relocation of Reactor Coolant System Pressure Isolation Valve TablesProbabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
Pressure Boundary Leakage
Fire Protection Program
ML18085B19818 April 2018Issuance of Amendment Nos. 324 and 305 Revise Technical Specification Actions for Rod Position IndicatorsShutdown Margin
Surveillance Frequency Control Program
Fire Protection Program
ML18081A04411 April 2018Issuance of Amendment No. 211 Safety Limit Minimum Critical Power Ratio ChangeAnticipated operational occurrence
Minimum Critical Power Ratio
Fuel cladding
ML17355A57016 February 2018Issuance of Amendment Nos. 322, 303, & 210, to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 (CAC Nos. MF9268/MF9269/MF9270; EPID L-2017-LLA-0173)High winds
Ultimate heat sink
Operating Basis Earthquake
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
ML17349A10818 January 2018Issuance of Amendments Containment Fan Coil Unit Allowed Outage Time Extension (CAC Nos. MF9364 and MF9365; EPID L-2017-LLA-0212)High winds
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
FLEX
Large early release frequency
Maintenance Rule Program
Fuel cladding
Fire Protection Program
ML17324A84014 December 2017Issuance of Amendment to Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report (CAC No. MF9502; EPID L-2017-LLA-0204)Shutdown Margin
Reactor Vessel Water Level
Offsite Dose Calculation Manual
Anticipated operational occurrence
Hydrostatic
Incorporated by reference
Pressure and Temperature Limits Report
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Spiral reload
Pressure Boundary Leakage