Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area5 October 2023License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation AreaHigh Radiation Area
Fuel cladding
RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology30 August 2023License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break MethodologySafe Shutdown Earthquake
Stress corrosion cracking
License Renewal
Fuel cladding
Pressure Boundary Leakage
Pressure boundary leak
Unidentified leakage
Affidavit
Operational leakage
RA-23-0122, License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to .17 August 2023License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to .Safe Shutdown
High winds
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
Fukushima Dai-Ichi
Earthquake
Seismic Walkdown Report
ML23160A2969 June 2023Response to Crystal River, Unit 3 Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan
ML23160A2979 June 2023CR3 Site Characterization Survey Report (CHAR-01) Impacted Open Land Survey Areas
ML23160A2989 June 2023Site Characterization SurveysTritium Exit Sign
High Radiation Area
Locked High Radiation Area
3F0623-02, Maintenance Support Building9 June 2023Maintenance Support Building
RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications31 May 2023License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical SpecificationsSafe Shutdown
Boric Acid
High Radiation Area
Offsite Dose Calculation Manual
Anticipated operational occurrence
Probabilistic Risk Assessment
Incorporated by reference
Locked High Radiation Area
Surveillance Frequency Control Program
Process Control Program
RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements16 February 2023Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage RequirementsOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Stress corrosion cracking
Pressure Boundary Leakage
Unidentified leakage
Operational leakage
RA-22-0081, License Amendment Request to Address Administrative Changes to the Operating License and Technical Specifications7 February 2023License Amendment Request to Address Administrative Changes to the Operating License and Technical SpecificationsAnticipated operational occurrence
Incorporated by reference
Liquid penetrant
RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies1 February 2023License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement FrequenciesEnforcement Discretion
Probabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
Operational leakage
3F1222-01, Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan12 December 2022Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan
RA-22-0280, Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections4 October 2022Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube InspectionsNondestructive Examination
Operational leakage
RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.21 September 2022License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.Surveillance Frequency Control Program
Fuel cladding
RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)28 April 2022Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)Safe Shutdown
Qualified Offsite Circuit
Emergency Lighting
Fuel cladding
Offsite Circuit
ML22020A00710 March 2022Issuance of Amendment No. 192 Regarding Removal of Extraneous Content and Requirements from the Renewed Facility Operating License and Technical SpecificationsNon-Destructive Examination
Anticipated operational occurrence
Surveillance Frequency Control Program
Overspeed trip
RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition24 February 2022Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing DefinitionSafe Shutdown
Shutdown Margin
Packing leak
Surveillance Frequency Control Program
Process Control Program
Pressure Boundary Leakage
Unidentified leakage
3F0122-01, License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical Specifications26 January 2022License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical SpecificationsOffsite Dose Calculation Manual
Fatality
RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position18 January 2022Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated PositionUltimate heat sink
Water Inventory Control
Surveillance Frequency Control Program
Operability Determination
Recently irradiated fuel
Power Uprate
RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections6 January 2022Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube InspectionsStress corrosion cracking
Eddy Current Testing
RA-21-0197, William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility14 December 2021William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations FacilityFuel cladding
Minimum staff
RA-21-0076, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections9 December 2021Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube InspectionsNondestructive Examination
Foreign Material Exclusion
Stress corrosion cracking
Measurement Uncertainty Recapture
Operational leakage
RA-21-0254, Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/ Temperature Limit Cooldown Curves9 December 2021Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/ Temperature Limit Cooldown CurvesHydrostatic
Fuel cladding
RA-21-0239, Application to Revise Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2 December 2021Application to Revise Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling
RA-21-0272, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b1 November 2021Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bHot Short
Safe Shutdown
High winds
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Mission time
Anticipated operational occurrence
Water Inventory Control
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
FLEX
Fukushima Dai-Ichi
Surveillance Frequency Control Program
Scram Discharge Volume
Large early release frequency
Earthquake
Fuel cladding
Offsite Circuit
RA-21-0213, License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During Shutdown23 September 2021License Amendment Request to Remove Limitation to Perform Certain Surveillance Requirements During ShutdownSafe Shutdown
Anticipated operational occurrence
Surveillance Frequency Control Program
Offsite Circuit
Overspeed trip
RA-19-0043, Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO9 June 2021Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCOSafe Shutdown
Qualified Offsite Circuit
Surveillance Frequency Control Program
Offsite Circuit
RA-21-0162, Supplement to License Amendment Request to Revise the 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to Reflect an Alternative8 June 2021Supplement to License Amendment Request to Revise the 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to Reflect an AlternativeInternal Flooding
Probabilistic Risk Assessment
RA-21-0112, License Amendment Request Regarding Administrative Change to Reflect Development of a Technical Requirements Manual7 June 2021License Amendment Request Regarding Administrative Change to Reflect Development of a Technical Requirements ManualAnticipated operational occurrence
Hydrostatic
Incorporated by reference
Surveillance Frequency Control Program
RA-21-0141, Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative26 April 2021Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative
RA-18-0183, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b1 April 2021License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bSafe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Tornado Missile
Water Inventory Control
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Surveillance Frequency Control Program
Scram Discharge Volume
Large early release frequency
Earthquake
Turbine Missile
Fuel cladding
Offsite Circuit
RA-21-0052, License Amendment Request Regarding Change to Containment Spray Nozzle Test Frequency24 March 2021License Amendment Request Regarding Change to Containment Spray Nozzle Test FrequencyBoric Acid
Past operability
Surveillance Frequency Control Program
Foreign Material Exclusion
Operability Determination
3F0321-02, License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. a17 March 2021License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. aSafeguards Contingency Plan
RA-20-0252, License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical Specifications24 February 2021License Amendment Request to Remove Extraneous Content and Requirements from the Operating License and Technical SpecificationsShutdown Margin
High Radiation Area
Anticipated operational occurrence
Probabilistic Risk Assessment
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Unidentified leakage
Operational leakage
RA-21-0073, Notification of Permit Application for Industrial Stormwater Activities24 February 2021Notification of Permit Application for Industrial Stormwater ActivitiesGrab sample
Exemption Request
RA-21-0061, Notification of NPDES Permit Renewal Application24 February 2021Notification of NPDES Permit Renewal ApplicationBoric Acid
Hydrostatic
License Renewal
Exemption Request
Biofouling
RA-21-0009, Request for License Amendment - Standby Liquid Control (SLC) System Boron Solution Storage Tank Volume23 February 2021Request for License Amendment - Standby Liquid Control (SLC) System Boron Solution Storage Tank VolumeShutdown Margin
Reactor Vessel Water Level
RA-20-0311, License Amendment Request to Revise the 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process.14 January 2021License Amendment Request to Revise the 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process.Safe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
Fukushima Dai-Ichi
Large early release frequency
Seismic Walkdown Report
3F1120-02, and Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization19 November 2020and Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization
RA-20-0361, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, Dated September 24, 2020, ADAMS Accession Number ML20272A09117 November 2020Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, Dated September 24, 2020, ADAMS Accession Number ML20272A091Water Inventory Control
Offsite Circuit
RA-20-0165, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements24 September 2020Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) EnhancementsReactor Vessel Water Level
Stroke time
Water Inventory Control
Operating Basis Earthquake
Qualified Offsite Circuit
Surveillance Frequency Control Program
Control of Heavy Loads
Fuel cladding
Offsite Circuit
Scaffolding
ML20093J09821 August 2020Issuance of Amendment No. 269 Regarding Technical Specification Change Incorporating Three New Feedwater Bypass Isolation ValvesSafe Shutdown Earthquake
Earthquake
RA-20-0223, Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b27 July 2020Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bHot Short
Safe Shutdown
Boric Acid
High winds
Internal Flooding
Probabilistic Risk Assessment
Multiple Spurious Operation
FLEX
Tornado-Generated Missile
Tornado Generated Missile
Large early release frequency
Offsite Circuit
Fire Protection Program
Very Early Warning Fire Detection
RA-20-0127, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.227 July 2020Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2Surveillance Frequency Control Program
RA-20-0142, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems21 July 2020Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling SubsystemsSurveillance Frequency Control Program
RA-19-0437, Nos. 1 & 2 - License Amendment Request to Modify Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Categorization Process9 July 2020Nos. 1 & 2 - License Amendment Request to Modify Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Categorization ProcessSafe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Flooding Focused Evaluation
RA-20-0148, Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications27 May 2020Supplement to License Amendment Request to Eliminate Certain Technical Specification Requirements in Alignment with Improved Standard Technical SpecificationsHigh Radiation Area
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
RA-19-0359, License Amendment Request to Correct Non-Conservative Technical Specification 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant System12 May 2020License Amendment Request to Correct Non-Conservative Technical Specification 3/4.4.9, Pressure/Temperature Limits - Reactor Coolant SystemHydrostatic
RA-20-0012, License Amendment Request to Revise Technical Specifications Related to Accident Monitoring Instrumentation, Refueling Operations Instrumentation, and Electrical Equipment Protective Devices12 March 2020License Amendment Request to Revise Technical Specifications Related to Accident Monitoring Instrumentation, Refueling Operations Instrumentation, and Electrical Equipment Protective DevicesSafe Shutdown
Time of Discovery
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Probabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
RA-19-0431, Application to Revise Technical Specifications to Adopt TSTF 564, Safety Limit MCPR9 March 2020Application to Revise Technical Specifications to Adopt TSTF 564, Safety Limit MCPRReactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Fuel cladding
Exclusive Use
Affidavit