RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | 13 December 2023 | Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | Safe Shutdown Arc flash FLEX Missed surveillance Surveillance Frequency Control Program Offsite Circuit |
RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. | 29 September 2023 | License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. | Boric Acid Time to boil Aging Management Surveillance Frequency Control Program Fuel cladding Exclusive Use |
RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 8 June 2023 | License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High winds Shutdown Margin Reactor Vessel Water Level High Radiation Area Ultimate heat sink Mission time Anticipated operational occurrence Tornado Missile Water Inventory Control Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Zebra Mussel FLEX B.5.b Fukushima Dai-Ichi Surveillance Frequency Control Program Scram Discharge Volume Feedwater Controller Failure Large early release frequency Tornado Missile Risk Evaluator Earthquake Turbine Missile Biofouling Offsite Circuit Failure to Scram |
RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | 8 June 2023 | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | Safe Shutdown High winds Ultimate heat sink Mission time Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Zebra Mussel FLEX Fukushima Dai-Ichi Large early release frequency Earthquake Turbine Missile Biofouling |
RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process | 7 June 2023 | Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process | Probabilistic Risk Assessment Incorporated by reference Surveillance Frequency Control Program |
RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | 25 May 2023 | Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | Hydrostatic Surveillance Frequency Control Program |
ML23073A218 | 22 March 2023 | Issuance of Amendment No. 258 to Renewed Facility Operating Licenses Exigent Amendment to Revise Design Basis Related to Seismic Requirements | Safe Shutdown Half scram Fire Barrier Anticipated operational occurrence Safe Shutdown Earthquake Temporary Modification Abnormal operational transient Earthquake |
RS-23-048, Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements | 7 March 2023 | Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements | Half scram Anticipated operational occurrence Safe Shutdown Earthquake Temporary Modification Abnormal operational transient Earthquake |
RS-23-007, Application to Adopt TSTF-564, Safety Limit MCPR | 3 March 2023 | Application to Adopt TSTF-564, Safety Limit MCPR | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Annual Radiological Environmental Operating Report Process Control Program Fuel cladding |
RS-23-032, Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location | 3 February 2023 | Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location | Stroke time Water Inventory Control Surveillance Frequency Control Program |
RS-23-006, Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report | 10 January 2023 | Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report | Hydrostatic Pressure and Temperature Limits Report |
ML22332A449 | 10 November 2022 | License Amendment Request - Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report | Anticipated operational occurrence Hydrostatic Abnormal operational transient Pressure and Temperature Limits Report |
RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | 3 October 2022 | Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration | Reactor Vessel Water Level |
RS-22-097, License Amendment Request to Reinsert an Accident Tolerant Fuel Lead Test Assembly | 31 August 2022 | License Amendment Request to Reinsert an Accident Tolerant Fuel Lead Test Assembly | Shutdown Margin Power change |
RS-22-086, R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam. | 10 August 2022 | R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam. | Safe Shutdown Non-Destructive Examination Post Accident Monitoring Internal Flooding Probabilistic Risk Assessment Nondestructive Examination Cyber Security Pressure and Temperature Limits Report Surveillance Frequency Control Program Fire Protection Program |
RS-22-037, License Amendment Request - Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control | 21 April 2022 | License Amendment Request - Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control | Safe Shutdown Surveillance Frequency Control Program |
RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | 4 January 2022 | Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | Process Control Program Pressure Boundary Leakage |
RS-21-108, Application to Revise Technical Specification 3.1.4, Control Rod Scam Times | 16 November 2021 | Application to Revise Technical Specification 3.1.4, Control Rod Scam Times | Anticipated operational occurrence |
ML21277A193 | 16 November 2021 | Enclosure 2, Draft Conforming License Amendments | Safe Shutdown Fire Barrier Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Cyber Security Aging Management Annual Radioactive Effluent Release Report Safeguards Contingency Plan Preemption Authority License Renewal Subsequent License Renewal Fuel cladding Liquid penetrant Fire Protection Program Scaffolding Unidentified leakage Power Uprate |
RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5 | 4 November 2021 | Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5 | Earthquake |
RS-21-065, License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.1 | 25 October 2021 | License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.1 | Aging Management Earthquake |
JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | 27 September 2021 | Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Stroke time Water Inventory Control Surveillance Frequency Control Program Operability Determination Control of Heavy Loads Fuel cladding Recently irradiated fuel Scaffolding |
ML21257A420 | 14 September 2021 | Request for Licensing Amendment Regarding Transition to GNF3 Fuel | |
RS-21-076, Application to Adopt TSTF-273, Safety Function Determination Program Clarifications | 30 July 2021 | Application to Adopt TSTF-273, Safety Function Determination Program Clarifications | Offsite Circuit |
RS-21-064, License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter | 30 June 2021 | License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter | |
RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments | 25 March 2021 | Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments | Safe Shutdown Safety Limit Minimum Critical Power Ratio Fire Barrier Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Cyber Security Aging Management Safeguards Contingency Plan Preemption Authority License Renewal Subsequent License Renewal Fuel cladding Liquid penetrant Fire Protection Program Coast down Unidentified leakage Power Uprate |
ML21057A273 | 25 February 2021 | Application for Order Approving License Transfers and Proposed Conforming License Amendments | Decommissioning Funding Plan |
RS-20-115, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | 18 November 2020 | Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | Reactor Vessel Water Level Water Inventory Control Surveillance Frequency Control Program Fuel cladding Recently irradiated fuel Offsite Circuit Scaffolding |
RS-20-130, License Amendment Request - Proposed Changes to Byron Emergency Plan for Post-Shutdown and Permanently Defueled Condition | 2 November 2020 | License Amendment Request - Proposed Changes to Byron Emergency Plan for Post-Shutdown and Permanently Defueled Condition | Safe Shutdown Health Physics Network High winds Grab sample Offsite Dose Calculation Manual Post Accident Monitoring Met Tower Nuclear Accident Reporting System B.5.b Abnormal operational transient Severe Accident Management Guideline Earthquake Deep Dose Equivalent Fuel cladding Minimum staff Power change Siren |
ML20303A325 | 29 October 2020 | License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 2 of 5 | Safe Shutdown Shutdown Margin Ultimate heat sink Anticipated operational occurrence Post Accident Monitoring Pressure and Temperature Limits Report Fuel cladding Recently irradiated fuel Fire Protection Program |
ML20303A327 | 29 October 2020 | License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 4 of 5 | Time of Discovery Offsite Dose Calculation Manual Surveillance Frequency Control Program Fire Protection Program |
ML20303A326 | 29 October 2020 | License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 3 of 5 | |
ML20303A323 | 29 October 2020 | License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 1 of 5 | Safe Shutdown Anticipated operational occurrence Abnormal operational transient Earthquake Fire Protection Program |
RS-20-129, License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 5 of 5 | 29 October 2020 | License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 5 of 5 | Hydrostatic Missed surveillance Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program |
RS-20-114, License Amendment Request - Proposed Changes to Technical Specifications Sections 1.1, Definitions, and 5.0, Administrative Controls, for Permanently Defueled Condition | 24 September 2020 | License Amendment Request - Proposed Changes to Technical Specifications Sections 1.1, Definitions, and 5.0, Administrative Controls, for Permanently Defueled Condition | Surveillance Frequency Control Program Fire Protection Program |
RS-20-087, Request for a License Amendment to LaSalle County Station, Units 1 and 2, Technical Specification 3.7.3, Ultimate Heat Sink | 17 July 2020 | Request for a License Amendment to LaSalle County Station, Units 1 and 2, Technical Specification 3.7.3, Ultimate Heat Sink | Safe Shutdown Ultimate heat sink Surveillance Frequency Control Program |
RS-20-068, Application to Revise Technical Specifications 3.8.1, AC Sources-Operating | 26 June 2020 | Application to Revise Technical Specifications 3.8.1, AC Sources-Operating | Safe Shutdown Stroke time Anticipated operational occurrence Surveillance Frequency Control Program Offsite Circuit |
RS-20-031, License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process | 30 April 2020 | License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process | Surveillance Frequency Control Program |
RS-20-046, Emergency License Amendment Request - Increase Technical Specifications Allowable MSIV Leakage Rates in TS 3.6.1.3 | 1 April 2020 | Emergency License Amendment Request - Increase Technical Specifications Allowable MSIV Leakage Rates in TS 3.6.1.3 | Hydrostatic Squib Surveillance Frequency Control Program |
ML20063L282 | 28 February 2020 | Application of Westinghouse Full Spectrum LOCA Evaluation Model | Loop seal Coatings Fuel cladding |
RS-20-010, Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) | 28 February 2020 | Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) | Boric Acid Shutdown Margin Reactor Vessel Water Level Surveillance Frequency Control Program |
RS-20-002, Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSl-191 Issues | 6 February 2020 | Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSl-191 Issues | Coatings Surveillance Frequency Control Program Fuel cladding |
RS-20-009, Application to Revise LaSalle County Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 31 January 2020 | Application to Revise LaSalle County Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | |
RS-20-011, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | 31 January 2020 | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors | Hot Short Safe Shutdown Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Incorporated by reference Fukushima Dai-Ichi Large early release frequency Flooding Focused Evaluation |
RS-19-115, Supplement to Application to Revise Braidwood Station and Byron Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 20 December 2019 | Supplement to Application to Revise Braidwood Station and Byron Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | |
RS-19-092, Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definitions | 9 December 2019 | Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definitions | Shutdown Margin Surveillance Frequency Control Program Recently irradiated fuel |
RS-19-078, License Amendment Request to Revise Technical Specifications 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies. | 24 September 2019 | License Amendment Request to Revise Technical Specifications 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies. | Safe Shutdown Packing leak Probabilistic Risk Assessment Coatings Incorporated by reference Aging Management Foreign Material Exclusion Moisture barrier Fuel cladding Scaffolding |
RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions | 28 August 2019 | License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions | Safe Shutdown Fire Protection Program |
RS-19-069, License Amendment Request Supporting Emergency Plan Emergency Action Level Change (EAL RAL3) | 23 August 2019 | License Amendment Request Supporting Emergency Plan Emergency Action Level Change (EAL RAL3) | Safe Shutdown |
RS-19-081, Supplement to Application for Technical Specifications Change to Add LCO 3.0.9 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process | 9 August 2019 | Supplement to Application for Technical Specifications Change to Add LCO 3.0.9 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process | |