Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days13 December 2023Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 DaysSafe Shutdown
Arc flash
FLEX
Missed surveillance
Surveillance Frequency Control Program
Offsite Circuit
RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.29 September 2023License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.Boric Acid
Time to boil
Aging Management
Surveillance Frequency Control Program
Fuel cladding
Exclusive Use
RS-23-059, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b8 June 2023License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bSafe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Mission time
Anticipated operational occurrence
Tornado Missile
Water Inventory Control
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Zebra Mussel
FLEX
B.5.b
Fukushima Dai-Ichi
Surveillance Frequency Control Program
Scram Discharge Volume
Feedwater Controller Failure
Large early release frequency
Tornado Missile Risk Evaluator
Earthquake
Turbine Missile
Biofouling
Offsite Circuit
Failure to Scram
RS-23-060, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors8 June 2023Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power ReactorsSafe Shutdown
High winds
Ultimate heat sink
Mission time
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Zebra Mussel
FLEX
Fukushima Dai-Ichi
Large early release frequency
Earthquake
Turbine Missile
Biofouling
RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process7 June 2023Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement ProcessProbabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling25 May 2023Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown CoolingHydrostatic
Surveillance Frequency Control Program
ML23073A21822 March 2023Issuance of Amendment No. 258 to Renewed Facility Operating Licenses Exigent Amendment to Revise Design Basis Related to Seismic RequirementsSafe Shutdown
Half scram
Fire Barrier
Anticipated operational occurrence
Safe Shutdown Earthquake
Temporary Modification
Abnormal operational transient
Earthquake
RS-23-048, Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements7 March 2023Exigent Amendment Request to Revise Design Basis Related to Seismic RequirementsHalf scram
Anticipated operational occurrence
Safe Shutdown Earthquake
Temporary Modification
Abnormal operational transient
Earthquake
RS-23-007, Application to Adopt TSTF-564, Safety Limit MCPR3 March 2023Application to Adopt TSTF-564, Safety Limit MCPRReactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Annual Radiological Environmental Operating Report
Process Control Program
Fuel cladding
RS-23-032, Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note Location3 February 2023Application to Move SR 3.5.1.2 Note to LCO 3.5.1 in Accordance with TSTF-416, LPCI Valve Alignment Verification Note LocationStroke time
Water Inventory Control
Surveillance Frequency Control Program
RS-23-006, Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report10 January 2023Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits ReportHydrostatic
Pressure and Temperature Limits Report
ML22332A44910 November 2022License Amendment Request - Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits ReportAnticipated operational occurrence
Hydrostatic
Abnormal operational transient
Pressure and Temperature Limits Report
RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration3 October 2022Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the PenetrationReactor Vessel Water Level
RS-22-097, License Amendment Request to Reinsert an Accident Tolerant Fuel Lead Test Assembly31 August 2022License Amendment Request to Reinsert an Accident Tolerant Fuel Lead Test AssemblyShutdown Margin
Power change
RS-22-086, R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam.10 August 2022R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam.Safe Shutdown
Non-Destructive Examination
Post Accident Monitoring
Internal Flooding
Probabilistic Risk Assessment
Nondestructive Examination
Cyber Security
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Fire Protection Program
RS-22-037, License Amendment Request - Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control21 April 2022License Amendment Request - Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee ControlSafe Shutdown
Surveillance Frequency Control Program
RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements4 January 2022Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage RequirementsProcess Control Program
Pressure Boundary Leakage
RS-21-108, Application to Revise Technical Specification 3.1.4, Control Rod Scam Times16 November 2021Application to Revise Technical Specification 3.1.4, Control Rod Scam TimesAnticipated operational occurrence
ML21277A19316 November 2021Enclosure 2, Draft Conforming License AmendmentsSafe Shutdown
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Cyber Security
Aging Management
Annual Radioactive Effluent Release Report
Safeguards Contingency Plan
Preemption Authority
License Renewal
Subsequent License Renewal
Fuel cladding
Liquid penetrant
Fire Protection Program
Scaffolding
Unidentified leakage
Power Uprate
RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.54 November 2021Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5Earthquake
RS-21-065, License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.125 October 2021License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.1Aging Management
Earthquake
JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position27 September 2021Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated PositionSafe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Stroke time
Water Inventory Control
Surveillance Frequency Control Program
Operability Determination
Control of Heavy Loads
Fuel cladding
Recently irradiated fuel
Scaffolding
ML21257A42014 September 2021Request for Licensing Amendment Regarding Transition to GNF3 Fuel
RS-21-076, Application to Adopt TSTF-273, Safety Function Determination Program Clarifications30 July 2021Application to Adopt TSTF-273, Safety Function Determination Program ClarificationsOffsite Circuit
RS-21-064, License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter30 June 2021License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter
RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments25 March 2021Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License AmendmentsSafe Shutdown
Safety Limit Minimum Critical Power Ratio
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Cyber Security
Aging Management
Safeguards Contingency Plan
Preemption Authority
License Renewal
Subsequent License Renewal
Fuel cladding
Liquid penetrant
Fire Protection Program
Coast down
Unidentified leakage
Power Uprate
ML21057A27325 February 2021Application for Order Approving License Transfers and Proposed Conforming License AmendmentsDecommissioning Funding Plan
RS-20-115, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements18 November 2020Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) EnhancementsReactor Vessel Water Level
Water Inventory Control
Surveillance Frequency Control Program
Fuel cladding
Recently irradiated fuel
Offsite Circuit
Scaffolding
RS-20-130, License Amendment Request - Proposed Changes to Byron Emergency Plan for Post-Shutdown and Permanently Defueled Condition2 November 2020License Amendment Request - Proposed Changes to Byron Emergency Plan for Post-Shutdown and Permanently Defueled ConditionSafe Shutdown
Health Physics Network
High winds
Grab sample
Offsite Dose Calculation Manual
Post Accident Monitoring
Met Tower
Nuclear Accident Reporting System
B.5.b
Abnormal operational transient
Severe Accident Management Guideline
Earthquake
Deep Dose Equivalent
Fuel cladding
Minimum staff
Power change
Siren
ML20303A32529 October 2020License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 2 of 5Safe Shutdown
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Post Accident Monitoring
Pressure and Temperature Limits Report
Fuel cladding
Recently irradiated fuel
Fire Protection Program
ML20303A32729 October 2020License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 4 of 5Time of Discovery
Offsite Dose Calculation Manual
Surveillance Frequency Control Program
Fire Protection Program
ML20303A32629 October 2020License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 3 of 5
ML20303A32329 October 2020License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 1 of 5Safe Shutdown
Anticipated operational occurrence
Abnormal operational transient
Earthquake
Fire Protection Program
RS-20-129, License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 5 of 529 October 2020License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition, Part 5 of 5Hydrostatic
Missed surveillance
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
RS-20-114, License Amendment Request - Proposed Changes to Technical Specifications Sections 1.1, Definitions, and 5.0, Administrative Controls, for Permanently Defueled Condition24 September 2020License Amendment Request - Proposed Changes to Technical Specifications Sections 1.1, Definitions, and 5.0, Administrative Controls, for Permanently Defueled ConditionSurveillance Frequency Control Program
Fire Protection Program
RS-20-087, Request for a License Amendment to LaSalle County Station, Units 1 and 2, Technical Specification 3.7.3, Ultimate Heat Sink17 July 2020Request for a License Amendment to LaSalle County Station, Units 1 and 2, Technical Specification 3.7.3, Ultimate Heat SinkSafe Shutdown
Ultimate heat sink
Surveillance Frequency Control Program
RS-20-068, Application to Revise Technical Specifications 3.8.1, AC Sources-Operating26 June 2020Application to Revise Technical Specifications 3.8.1, AC Sources-OperatingSafe Shutdown
Stroke time
Anticipated operational occurrence
Surveillance Frequency Control Program
Offsite Circuit
RS-20-031, License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement Process30 April 2020License Amendment Request - Application to Adopt Technical Specification Task Force (TSTF) Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2 .5 and TS 3.6 .3.2, Using the Consolidated Line Item Improvement ProcessSurveillance Frequency Control Program
RS-20-046, Emergency License Amendment Request - Increase Technical Specifications Allowable MSIV Leakage Rates in TS 3.6.1.31 April 2020Emergency License Amendment Request - Increase Technical Specifications Allowable MSIV Leakage Rates in TS 3.6.1.3Hydrostatic
Squib
Surveillance Frequency Control Program
ML20063L28228 February 2020Application of Westinghouse Full Spectrum LOCA Evaluation ModelLoop seal
Coatings
Fuel cladding
RS-20-010, Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR)28 February 2020Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR)Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Surveillance Frequency Control Program
RS-20-002, Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSl-191 Issues6 February 2020Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSl-191 IssuesCoatings
Surveillance Frequency Control Program
Fuel cladding
RS-20-009, Application to Revise LaSalle County Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b31 January 2020Application to Revise LaSalle County Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b
RS-20-011, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors31 January 2020Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power ReactorsHot Short
Safe Shutdown
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
Fukushima Dai-Ichi
Large early release frequency
Flooding Focused Evaluation
RS-19-115, Supplement to Application to Revise Braidwood Station and Byron Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b20 December 2019Supplement to Application to Revise Braidwood Station and Byron Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b
RS-19-092, Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definitions9 December 2019Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing DefinitionsShutdown Margin
Surveillance Frequency Control Program
Recently irradiated fuel
RS-19-078, License Amendment Request to Revise Technical Specifications 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies.24 September 2019License Amendment Request to Revise Technical Specifications 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies.Safe Shutdown
Packing leak
Probabilistic Risk Assessment
Coatings
Incorporated by reference
Aging Management
Foreign Material Exclusion
Moisture barrier
Fuel cladding
Scaffolding
RS-19-044, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions28 August 2019License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust ProvisionsSafe Shutdown
Fire Protection Program
RS-19-069, License Amendment Request Supporting Emergency Plan Emergency Action Level Change (EAL RAL3)23 August 2019License Amendment Request Supporting Emergency Plan Emergency Action Level Change (EAL RAL3)Safe Shutdown
RS-19-081, Supplement to Application for Technical Specifications Change to Add LCO 3.0.9 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process9 August 2019Supplement to Application for Technical Specifications Change to Add LCO 3.0.9 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process