ML20224A521 | 29 July 2020 | Part 07 - Exemptions - Chapters 01 - 17 (Rev. 5) - Part 07 - Exemptions - Chapters 01 - 17 | Safe Shutdown Shutdown Margin Ultimate heat sink Non-Destructive Examination Grab sample Anticipated operational occurrence Hydrostatic Probabilistic Risk Assessment Severe Accident Management Guideline Exemption Request Fuel cladding Failure to Scram |
ML20198M393 | 2 July 2020 | LLC Submittal of Revised Packing Slip for Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1, Dated June 19, 2020 | |
ML20197A414 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 20 - Mitigation of Beyond-Design-Basis Events - Sections 20.01 - 20.04 (Rev. 4.1) | High winds Ultimate heat sink Spent Fuel Pool Instrumentation B.5.b Mitigating Strategies Earthquake |
ML20198M392 | 19 June 2020 | LLC - Submittal of the NuScale Standard Plant Design Certification Application, Revision 4.1 | Exemption Request |
ML20197A432 | 19 June 2020 | Part 10 - Quality Assurance Program Description (Rev. 4.1) - Part 10 - Quality Assurance Program Description (Rev. 4.1) | |
ML20197A430 | 19 June 2020 | Part 09 - Withheld Information (Rev. 4.1) - Part 09 - Withheld Information (Rev. 4.1) | Ultimate heat sink Turbine Missile |
ML20197A428 | 19 June 2020 | Part 08 - License Conditions, Inspections, Tests, Analyses and Acceptance Criteria (Rev. 4.1) - Part 08 - License Conditions, Inspections, Tests, Analyses and Acceptance Criteria (Rev. 4.1) | |
ML20197A426 | 19 June 2020 | Part 07 - Exemptions - Chapters 01 - 17 (Rev. 4.1) - Part 07 - Exemptions - Chapters 01 - 17 (Rev. 4.1) | Safe Shutdown Shutdown Margin Ultimate heat sink Non-Destructive Examination Grab sample Anticipated operational occurrence Hydrostatic Probabilistic Risk Assessment Severe Accident Management Guideline Exemption Request Fuel cladding Failure to Scram |
ML20197A424 | 19 June 2020 | Part 06 - Security Plans (Rev. 4.1) - Part 06 - Security Plans (Rev. 4.1) | |
ML20197A422 | 19 June 2020 | Part 05 - Emergency Plans (Rev. 4.1) - Part 05 - Emergency Plans (Rev. 4.1) | |
ML20197A420 | 19 June 2020 | Part 04 - Generic Technical Specifications - NuScale Nuclear Power Plants (Rev. 4.1) - Part 04 - Generic Technical Specifications - NuScale Nuclear Power Plants - Volume 2 - Bases - Chapters 02 - 03 (Rev. 4.1) | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Non-Destructive Examination Fire Barrier Stroke time Anticipated operational occurrence Tornado Missile Internal Flooding Hydrostatic Incorporated by reference Missed surveillance Pressure and Temperature Limits Report Surveillance Frequency Control Program Power-Operated Valves Turbine Missile Fuel cladding Pressure Boundary Leakage Power change |
ML20197A419 | 19 June 2020 | Part 04 - Generic Technical Specifications - NuScale Nuclear Power Plants (Rev. 4.1) - Part 04 - Generic Technical Specifications - NuScale Nuclear Power Plants - Volume 1 - Specifications - Chapters 01 - 05 (Rev. 4.1) | Safe Shutdown Boric Acid Time of Discovery Shutdown Margin High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Hydrostatic Nondestructive Examination Pressure and Temperature Limits Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Pressure Boundary Leakage Fire Protection Program Power change Unidentified leakage |
ML20197A417 | 19 June 2020 | Part 03 - Applicants Environmental Report - Standard Design Certification (Rev. 4.1) - Part 03 - Applicants Environmental Report - Standard Design Certification - Section 1.0 - Appendix B (Rev. 4.1) | Hot Short Safe Shutdown High winds Ultimate heat sink Post Accident Monitoring Internal Flooding Probabilistic Risk Assessment B.5.b Hardened vent Chernobyl |
ML20197A415 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 21 - Multi-Module Design Considerations - Sections 21.01 - 21.04 (Rev. 4.1) | Safe Shutdown Health Physics Network Ultimate heat sink Anticipated operational occurrence Probabilistic Risk Assessment Emergency Lighting Earthquake Fire Protection Program |
ML20197A413 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 19 - Probabilistic Risk Assessment and Severe Accident Evaluation - Sections 19.00 - 19.05 (Rev. 4.1) | Hot Short Safe Shutdown Boric Acid High winds Ultimate heat sink Mission time Fire Barrier Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Zebra Mussel Multiple Spurious Operation Emergency Lighting FLEX Surveillance Frequency Control Program Excess Flow Check Valve Severe Accident Management Guideline Frazil ice Overtravel Earthquake Control of Heavy Loads Fuel cladding Biofouling Fatality Failure to Scram |
ML20197A412 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 18 - Human Factors Engineering - Sections 18.00 - 18.12 (Rev. 4.1) | Safe Shutdown Ultimate heat sink Anticipated operational occurrence Probabilistic Risk Assessment Chernobyl Power change |
ML20197A411 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 17 - Quality Assurance and Reliability Assurance - Sections 17.01 - 17.06 (Rev. 4.1) | Ultimate heat sink Probabilistic Risk Assessment |
ML20197A410 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 16 - Technical Specifications - Section 16.01 - Technical Specifications (Rev. 4.1) | Boric Acid Shutdown Margin Ultimate heat sink Surveillance Frequency Control Program |
ML20197A409 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 15 - Transient and Accident Analyses - Sections 15.00 - 15.10 (Rev. 4.1) | Safe Shutdown Boric Acid Shutdown Margin Loop seal Ultimate heat sink Stroke time Anticipated operational occurrence Internal Flooding Hydrostatic Probabilistic Risk Assessment Rod Drop Event Earthquake Deep Dose Equivalent Fuel cladding Power change Coast down Failure to Scram |
ML20197A408 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 14 - Initial Test Program and Inspections, Tests, Analyses, and Acceptance Criteria - Sections 14.00 - 14.03 (Rev. 4.1) | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Grab sample Fire Barrier Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Post Accident Monitoring Internal Flooding Hydrostatic Probabilistic Risk Assessment Nondestructive Examination Emergency Lighting Excess Flow Check Valve Maintenance Rule Program Pressure Boundary Leakage Fire Protection Program Power change Unidentified leakage |
ML20197A407 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 13 - Conduct of Operations - Sections 13.01 - 13.07 (Rev. 4.1) | Fitness for Duty Cyber Security Incorporated by reference Process Control Program Fire Protection Program |
ML20197A406 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 12 - Radiation Protection - Sections 12.01 - 12.05 (Rev. 4.1) | Boric Acid Loop seal High Radiation Area Ultimate heat sink Grab sample Anticipated operational occurrence Coatings Emergency Lighting Fuel cladding |
ML20197A404 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 10 - Steam and Power Conversion System - Sections 10.01 - 10.04 (Rev. 4.1) | Safe Shutdown Loop seal Ultimate heat sink Grab sample Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Process Control Program Earthquake Turbine Missile Fire Protection Program Power change |
ML20197A384 | 19 June 2020 | Part 01 - General and Financial Information - Sections 01.01 - 01.04 (Rev. 4.1) - Part 01 - General and Financial Information - Sections 01.01 - 01.04 (Rev. 4.1) | |
ML20197A386 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 01 - Certified Design Descriptions and Inspections, Tests, Analyses, and Acceptance Criteria - Chapters 01 - 05 (Rev. 4.1) | Safe Shutdown Boric Acid Ultimate heat sink Anticipated operational occurrence Tornado Missile Commercial Grade Dedication Safe Shutdown Earthquake Internal Flooding Nondestructive Examination Emergency Lighting Incorporated by reference Earthquake |
ML20197A387 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 01 - Introduction and General Description of the Plant - Sections 01.01 - 01.10 (Rev. 4.1) | Safe Shutdown Boric Acid Health Physics Network Shutdown Margin Ultimate heat sink Non-Destructive Examination Offsite Dose Calculation Manual Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Multiple Spurious Operation Incorporated by reference FLEX Process Control Program Severe Accident Management Guideline Earthquake Fire Protection Program |
ML20197A388 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 02 - Site Characteristics and Site Parameters - Sections 02.00 - 02.05 (Rev. 4.1) | Tornado Missile Earthquake |
ML20197A389 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Sections 03.01 - 03.06 (Rev. 4.1) | Safe Shutdown Shutdown Margin Loop seal Ultimate heat sink Grab sample Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Post Accident Monitoring Internal Flooding Hydrostatic Emergency Lighting Tornado-Generated Missile Excess Flow Check Valve Earthquake Turbine Missile Fuel cladding Power change |
ML20197A390 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Section 03.07 - Seismic Design - Pages 1 - 265 (Rev. 4.1) | Ultimate heat sink Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Earthquake |
ML20197A391 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Section 03.07 - Seismic Design - Pages 266 - 307 (Rev. 4.1) | |
ML20197A392 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Section 03.07 - Seismic Design - Pages 308 - 345 (Rev. 4.1) | |
ML20197A393 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Section 03.07 - Seismic Design - Pages 346 - 482 (Rev. 4.1) | Safe Shutdown Earthquake Operating Basis Earthquake Finite Element Analysis Earthquake |
ML20197A394 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Section 03.08 - Des. Cat I Str. - Pgs 1 - 140 (Rev. 4.1) | Boric Acid Ultimate heat sink Non-Destructive Examination Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Finite Element Analysis Tornado Generated Missile Earthquake Turbine Missile Liquid penetrant |
ML20197A396 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Sections 03.09 - 03.13 (Rev. 4.1) | Safe Shutdown Boric Acid Ultimate heat sink Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Post Accident Monitoring Hydrostatic Operating Basis Earthquake Incorporated by reference Finite Element Analysis Earthquake Power-Operated Valves Power Operated Valves Fuel cladding Power change Flow Induced Vibration |
ML20197A395 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Section 03.08 - Des. Cat I Str. - Pgs 141 - 271 (Rev. 4.1) | Earthquake |
ML20197A397 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Appendices 3A - 3C (Rev. 4.1) | Finite Element Analysis B.5.b Mitigating Strategies |
ML20197A398 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 04 - Reactor - Sections 04.01 - 04.06 (Rev. 4.1) | Safe Shutdown Shutdown Margin Non-Destructive Examination Grab sample Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Nondestructive Examination Design basis earthquake Earthquake Fuel cladding Power change Flow Induced Vibration Coast down |
ML20197A399 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 05 - Reactor Coolant System and Connecting Systems - Sections 05.01 - 05.04 (Rev. 4.1) | Safe Shutdown Boric Acid Ultimate heat sink Non-Destructive Examination Grab sample Anticipated operational occurrence Safe Shutdown Earthquake Weld Overlay Hydrostatic Nondestructive Examination VT-2 Cyber Security Incorporated by reference Foreign Material Exclusion Fuel cladding Liquid penetrant Pressure Boundary Leakage Pressure boundary leak Dissimilar Metal Weld Flow Induced Vibration Unidentified leakage |
ML20197A400 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 06 - Engineered Safety Features - Sections 06.01 - 06.07 (Rev. 4.1) | Safe Shutdown Boric Acid Ultimate heat sink Non-Destructive Examination Anticipated operational occurrence Safe Shutdown Earthquake Weld Overlay Hydrostatic Coatings VT-2 Incorporated by reference Foreign Material Exclusion Excess Flow Check Valve Severe Accident Management Guideline Earthquake Fuel cladding Liquid penetrant Dissimilar Metal Weld Scaffolding |
ML20197A401 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 07 - Instrumentation and Controls - Sections 07.00 - 07.02 (Rev. 4.1) | Safe Shutdown Health Physics Network Shutdown Margin Ultimate heat sink Mission time Stroke time Anticipated operational occurrence Commercial Grade Dedication Post Accident Monitoring Probabilistic Risk Assessment Earthquake Fuel cladding Power change |
ML20197A402 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 08 - Electric Power - Sections 08.01 - 08.04 (Rev. 4.1) | Hot Short Safe Shutdown Boric Acid Health Physics Network Fire Barrier Anticipated operational occurrence Emergency Lighting Open Phase Condition Earthquake Maintenance Rule Program |
ML20197A403 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 09 - Auxiliary Systems - Section 09.01 - Appendix 9A (Rev. 4.1) | Safe Shutdown Ultimate heat sink Grab sample Tornado Missile Safe Shutdown Earthquake Operating Basis Earthquake Multiple Spurious Operation Earthquake Turbine Missile Fuel cladding Fire Protection Program |
ML20197A405 | 19 June 2020 | Part 02 - Final Safety Analysis Report (Rev. 4.1) - Part 02 - Tier 02 - Chapter 11 - Radioactive Waste Management - Sections 11.01 - 11.06 (Rev. 4.1) | Safe Shutdown Boric Acid Packing leak Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Process Control Program Fuel cladding Pressure Boundary Leakage |
ML20036D444 | 16 January 2020 | Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 08 - Electric Power - Sections 08.01 - 08.04 | Hot Short Safe Shutdown Boric Acid Health Physics Network Fire Barrier Anticipated operational occurrence Emergency Lighting Open Phase Condition Earthquake Maintenance Rule Program |
ML20036D442 | 16 January 2020 | Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 07 - Instrumentation and Controls - Sections 07.00 - 07.02 | Safe Shutdown Health Physics Network Shutdown Margin Ultimate heat sink Mission time Stroke time Anticipated operational occurrence Commercial Grade Dedication Post Accident Monitoring Probabilistic Risk Assessment Earthquake Fuel cladding Power change |
ML20036D440 | 16 January 2020 | Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 06 - Engineered Safety Features - Sections 06.01 - 06.07 | Safe Shutdown Boric Acid Ultimate heat sink Non-Destructive Examination Anticipated operational occurrence Safe Shutdown Earthquake Weld Overlay Hydrostatic Coatings VT-2 Incorporated by reference Foreign Material Exclusion Excess Flow Check Valve Severe Accident Management Guideline Earthquake Fuel cladding Liquid penetrant Dissimilar Metal Weld Scaffolding |
ML20036D439 | 16 January 2020 | Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 05 - Reactor Coolant System and Connecting Systems - Sections 05.01 - 05.04 | Safe Shutdown Boric Acid Ultimate heat sink Non-Destructive Examination Grab sample Anticipated operational occurrence Safe Shutdown Earthquake Weld Overlay Hydrostatic Nondestructive Examination VT-2 Cyber Security Incorporated by reference Foreign Material Exclusion Fuel cladding Liquid penetrant Pressure Boundary Leakage Pressure boundary leak Dissimilar Metal Weld Flow Induced Vibration Unidentified leakage |
ML20036D438 | 16 January 2020 | Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 04 - Reactor - Sections 04.01 - 04.06 | Safe Shutdown Shutdown Margin Non-Destructive Examination Grab sample Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Nondestructive Examination Design basis earthquake Earthquake Fuel cladding Power change Flow Induced Vibration Coast down |
ML20036D437 | 16 January 2020 | Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Appendices 3A - 3C | Finite Element Analysis B.5.b Mitigating Strategies |
ML20036D433 | 16 January 2020 | Part 02 - Final Safety Analysis Report (Rev. 4) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Sections 03.09 - 03.13 | Safe Shutdown Boric Acid Ultimate heat sink Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Post Accident Monitoring Hydrostatic Operating Basis Earthquake Incorporated by reference Finite Element Analysis Earthquake Power-Operated Valves Power Operated Valves Fuel cladding Power change Flow Induced Vibration |