Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000254/2023004 | 5 February 2024 | Integrated Inspection Report 05000254/2023004 and 05000265/2023004 | |
IR 05000237/2023004 | 2 February 2024 | Integrated Inspection Report 05000237/2023004 and 05000249/2023004 | |
IR 05000010/2023001 | 17 January 2024 | NRC Inspection Report 05000010/2023001 (Drss) | |
ML24004A005 | 17 January 2024 | Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0042 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | |
ML23354A281 | 4 January 2024 | Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0031 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) | |
RS-24-001, Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | 3 January 2024 | Response to Request for Additional Information Regarding Relief Request I5R-26, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | VT-2 |
ML23356A007 | 22 December 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
IR 05000254/2023403 | 22 December 2023 | Public- Quad Cities Nuclear Power Station Security Baseline Inspection Report 05000254/2023403 and 05000265/2023403 | Affidavit |
IR 05000254/2023010 | 20 December 2023 | Comprehensive Engineering Team Inspection Report 05000254/2023010 and 05000265/2023010 | Safe Shutdown Reactor Vessel Water Level Stroke time FLEX Significance Determination Process Local Leak Rate Testing Operability Determination Battery sizing Power-Operated Valves Fuel cladding Very Low Safety Significance Issue Resolution Weak link Power Uprate |
ML23349A162 | 17 December 2023 | Issuance of Amendment Nos. 298 and 294 Increase Completion Time in Technical Specification 3.8.1.B.4 (Emergency Circumstances) | Safe Shutdown Probabilistic Risk Assessment Cyber Security Arc flash Surveillance Frequency Control Program Safeguards Contingency Plan Recently irradiated fuel Offsite Circuit |
RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | 15 December 2023 | Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | High winds Mission time Tornado Missile B.5.b Surveillance Frequency Control Program Recently irradiated fuel Offsite Circuit |
RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | 13 December 2023 | Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | Safe Shutdown Arc flash FLEX Missed surveillance Surveillance Frequency Control Program Offsite Circuit |
ML23305A140 | 13 December 2023 | Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 | Hydrostatic Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan |
ML23339A176 | 5 December 2023 | Notification of NRC Baseline Inspection and Request for Information (05000265/2024001) | Non-Destructive Examination Aging Management Foreign Material Exclusion Scaffolding |
RS-23-121, Sixth Ten-Year Interval Inservice Testing Program | 30 November 2023 | Sixth Ten-Year Interval Inservice Testing Program | Safe Shutdown Packing leak High Radiation Area Grab sample Stroke time Squib Incorporated by reference Locked High Radiation Area Surveillance Frequency Control Program Scram Discharge Volume Excess Flow Check Valve Cold shutdown justification Power-Operated Valves Power Operated Valves |
SVPLTR 23-0037, Core Operating Limits Report for Cycle 29 | 29 November 2023 | Core Operating Limits Report for Cycle 29 | |
RS-23-122, Amendment No. 15 to Indemnity Agreement No. B-59 | 29 November 2023 | Amendment No. 15 to Indemnity Agreement No. B-59 | |
ML23319A334 | 20 November 2023 | Regulatory Audit in Support of License Amendment Requests to Adopt TSTF 505, Revision 2 and 10 CFR 50.69 | Tornado Missile Internal Flooding Probabilistic Risk Assessment Qualified Offsite Circuit FLEX Open Phase Condition Offsite Circuit |
RS-23-104, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 17 November 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Fitness for Duty Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
ML23291A080 | 16 November 2023 | Issuance of Conforming Amendments Regarding Direct Transfer of DPR-39 and DPR-48 Facility Operating Licenses from Zionsolutions, LLC to Constellation Energy Generation LLC | |
ML23286A313 | 14 November 2023 | EPA Phase 2 Closure Letter 10-13-23 | |
RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | 10 November 2023 | Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information | Time of Discovery Fitness for Duty Contraband Exemption Request |
ML23317A119 | 10 November 2023 | Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums | Affidavit |
IR 05000254/2023003 | 9 November 2023 | Integrated Inspection Report 05000254/2023003 and 05000265/2023003 | Safe Shutdown Enforcement Discretion Probabilistic Risk Assessment Functionality Assessment Condition Adverse to Quality FLEX Significance Determination Process Large early release frequency Operability Determination Maintenance Rule Program Fire Protection Program |
ML23286A309 | 8 November 2023 | Partial Site Release, Zion Nuclear Power Station, Units 1 and 2 | |
ML23310A313 | 8 November 2023 | Cover Letter, S.Anderson, NRC to J.Sauger, Energysolutions, Remaining Final Status Surveys | |
RS-23-116, Supplemental Information in Response to Order Consenting to License Transfers and Approval of Conforming License Amendments | 8 November 2023 | Supplemental Information in Response to Order Consenting to License Transfers and Approval of Conforming License Amendments | |
RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | 8 November 2023 | Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval | Non-Destructive Examination Nondestructive Examination VT-2 |
ML23310A108 | 3 November 2023 | Confirmatory Survey Report 2023 | |
IR 05000295/2023001 | 2 November 2023 | NRC Inspection Report No. 05000295/2023001(DRSS); 05000304/2023001 (Drss) - Zion Nuclear Power Station | |
RS-23-113, Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 | 20 October 2023 | Submittal of Updated Final Safety Analysis Report (Ufsar), Revision 17 and Fire Protection Report (Fpr), Revision 26 | Safe Shutdown Aging Management License Renewal |
RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 16 October 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
ML23285A234 | 13 October 2023 | Confirmation of Initial License Examination | |
RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans | 12 October 2023 | Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans | |
ML23279A071 | 6 October 2023 | Response to NRC Dresden Nuclear Power Station, Units 2 and 3 - Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 | Anticipated operational occurrence Condition Adverse to Quality |
ML23269A066 | 28 September 2023 | Proposed Alternative Request RV-23H Associated with the Sixth 10-Year Inservice Testing Interval | Stroke time Incorporated by reference |
ML23265A132 | 27 September 2023 | Proposed Alternative Request RV-03 Associated with the Sixth 10-Year Inservice Testing Interval | Incorporated by reference Power-Operated Valves |
ML23206A038 | 21 September 2023 | Proposed Alternative to the Requirements of the ASME Code | Non-Destructive Examination Nondestructive Examination Incorporated by reference |
IR 05000254/2023011 | 20 September 2023 | Safety-Conscious Work Environment Issue of Concern Team Inspection Report 05000254/2023011 and 05000265/2023011 | |
ML23205A136 | 20 September 2023 | Proposed Alternative Request RV-02D Associated with the Sixth IST Interval | Incorporated by reference |
ML23251A071 | 8 September 2023 | Confirmatory Survey Extent of Condition Review | |
IR 05000237/2023011 | 6 September 2023 | Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 | Condition Adverse to Quality Significance Determination Process License Renewal Through Wall Leak Weak link Power Uprate |
RS-23-089, Sixth Ten-Year Interval Inservice Testing Program | 5 September 2023 | Sixth Ten-Year Interval Inservice Testing Program | Safe Shutdown Packing leak High Radiation Area Stroke time Squib Incorporated by reference Locked High Radiation Area Missed surveillance Surveillance Frequency Control Program Scram Discharge Volume Cold shutdown justification Power-Operated Valves Power Operated Valves Grace period |