RA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) | 10 January 2024 | Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) | |
RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. | 12 December 2023 | Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. | Exemption Request Pressure Boundary Leakage Grace period Unidentified leakage Operational leakage |
RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 4 December 2023 | Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Exemption Request |
RA-23-0288, End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report | 16 November 2023 | End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report | Nondestructive Examination Flow Accelerated Corrosion |
RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 16 November 2023 | RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Fitness for Duty Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes | 1 November 2023 | Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes | Exemption Request Siren |
RA-23-0230, Refuel 27 (C1 R27) Inservice Inspection (ISI) Report | 25 September 2023 | Refuel 27 (C1 R27) Inservice Inspection (ISI) Report | |
RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes | 20 September 2023 | Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes | Met Tower Exemption Request |
RA-23-0215, Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks | 28 August 2023 | Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks | |
RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | 20 July 2023 | Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | Non-Destructive Examination |
RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | 20 July 2023 | Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | Non-Destructive Examination Weld Overlay Finite Element Analysis |
RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require | 7 July 2023 | Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require | Incorporated by reference Surveillance Frequency Control Program Operational leakage |
RA-18-0007, License Amendment Application to Revise Control Room Cooling Technical Specifications | 19 June 2023 | License Amendment Application to Revise Control Room Cooling Technical Specifications | Post Accident Monitoring Enforcement Discretion Surveillance Frequency Control Program Recently irradiated fuel |
RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory | 7 June 2023 | Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory | |
RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations | 30 May 2023 | Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations | |
RA-23-0105, Duke Energy Carolinas, LLC (Duke Energy) - Core Operating Limits Report (COLR) for Unit 1 Cycle 28 Reload Core | 4 May 2023 | Duke Energy Carolinas, LLC (Duke Energy) - Core Operating Limits Report (COLR) for Unit 1 Cycle 28 Reload Core | Boric Acid Shutdown Margin |
RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 | 26 April 2023 | Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 | |
RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 2022 | 26 April 2023 | Duke Energy Annual Radiological Environmental Operating Report - 2022 | Time of Discovery Grab sample Offsite Dose Calculation Manual Fukushima Dai-Ichi Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Earthquake Chernobyl |
RA-23-0046, Annual Radioactive Effluent Release Report - 2022 | 24 April 2023 | Annual Radioactive Effluent Release Report - 2022 | Annual Radioactive Effluent Release Report |
RA-23-0042, Submittal of Updated Final Safety Analysis Report (Revision 23), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of a Commitment Change | 24 April 2023 | Submittal of Updated Final Safety Analysis Report (Revision 23), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of a Commitment Change | Safe Shutdown Time of Discovery Reactor Vessel Water Level Grab sample Offsite Dose Calculation Manual Slow transfer Anticipated operational occurrence Post Accident Monitoring Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Qualified Offsite Circuit Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Operability Determination Battery sizing License Renewal Earthquake Commercial Grade Power Operated Valves Turbine Missile Offsite Circuit Fire Watch Power change Overspeed trip Manual Operator Action |
RA-23-0091, Submittal of Emergency Action Level (EAL) Technical Basis Document, Revision 4 | 13 April 2023 | Submittal of Emergency Action Level (EAL) Technical Basis Document, Revision 4 | Safe Shutdown Time of Discovery Health Physics Network High winds Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Spent Fuel Pool Instrumentation Safeguards Contingency Plan Exemption Request Earthquake Fuel cladding Pressure Boundary Leakage Grace period Power change Unidentified leakage |
RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | 30 March 2023 | 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | |
RA-23-0040, Onsite Property Insurance Coverage | 30 March 2023 | Onsite Property Insurance Coverage | |
RA-23-0036, Biennial Decommissioning Financial Assurance Reports | 30 March 2023 | Biennial Decommissioning Financial Assurance Reports | |
RA-23-0084, Core Operating Limits Report (COLR) for Unit 1 Cycle 27 Reload Core, Rev. 4 | 29 March 2023 | Core Operating Limits Report (COLR) for Unit 1 Cycle 27 Reload Core, Rev. 4 | Boric Acid Shutdown Margin |
RA-23-0083, Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core, Rev. 2 | 16 March 2023 | Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core, Rev. 2 | Boric Acid Shutdown Margin |
RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | 17 February 2023 | Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) | Weld Overlay Hydrostatic Finite Element Analysis Flow Accelerated Corrosion Stress corrosion cracking |
RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | 16 February 2023 | Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Stress corrosion cracking Pressure Boundary Leakage Unidentified leakage Operational leakage |
RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI | 2 February 2023 | Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI | Incorporated by reference |
RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies | 1 February 2023 | License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies | Enforcement Discretion Probabilistic Risk Assessment Incorporated by reference Surveillance Frequency Control Program Operational leakage |
RA-22-0608, Refuel 25 (C2R25) Inservice Inspection (ISI) Report | 25 January 2023 | Refuel 25 (C2R25) Inservice Inspection (ISI) Report | Boric Acid |
RA-22-0256, Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | 23 January 2023 | Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) | |
RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab | 5 December 2022 | Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab | |
RA-22-0331, Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core, Rev. 1 | 22 November 2022 | Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core, Rev. 1 | Boric Acid Shutdown Margin |
RA-22-0266, Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core | 19 September 2022 | Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core | Boric Acid Shutdown Margin |
RA-22-0253, Independent Spent Fuel Storage Installation (Isfsi), Register Use of Casks | 25 August 2022 | Independent Spent Fuel Storage Installation (Isfsi), Register Use of Casks | |
RA-22-0201, Refuel 24 Steam Generator Tube Inspection Report Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections | 21 July 2022 | Refuel 24 Steam Generator Tube Inspection Report Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections | |
RA-22-0220, Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Storage Casks | 19 July 2022 | Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Storage Casks | |
RA-22-0218, Emergency Action Level (EAL) Technical Basis Document, Revision 3 | 14 July 2022 | Emergency Action Level (EAL) Technical Basis Document, Revision 3 | Safe Shutdown Time of Discovery Health Physics Network High winds Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Spent Fuel Pool Instrumentation Safeguards Contingency Plan Exemption Request Earthquake Fuel cladding Pressure Boundary Leakage Grace period Power change Unidentified leakage |
RA-22-0205, Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Storage Casks | 11 July 2022 | Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Storage Casks | |
RA-22-0180, Supplement to Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair for Life of Plant | 7 July 2022 | Supplement to Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair for Life of Plant | Weld Overlay Finite Element Analysis Stress corrosion cracking Affidavit |
RA-22-0195, Response to Request for Additional Information (RAI) for the Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue for the Safety Injection Nozzle | 29 June 2022 | Response to Request for Additional Information (RAI) for the Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue for the Safety Injection Nozzle | License Renewal Thermal fatigue |
RA-22-0151, Duke Energy Common Emergency Plan, Revision 2, Summary of Changes | 24 May 2022 | Duke Energy Common Emergency Plan, Revision 2, Summary of Changes | Exemption Request Minimum staff Grace period Siren |
RA-22-0148, 10 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified Laboratory | 16 May 2022 | 10 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified Laboratory | Blind Performance Test |
RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility | 13 May 2022 | Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility | Health Physics Network High winds |
RA-22-0149, Supplement to the Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System | 28 April 2022 | Supplement to the Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System | Exemption Request |
RA-22-0028, Annual Report of Changes Pursuant to 10 CFR 50.46 | 27 April 2022 | Annual Report of Changes Pursuant to 10 CFR 50.46 | |
RA-22-0029, Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 2021 | 27 April 2022 | Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 2021 | Annual Radioactive Effluent Release Report |
RA-22-0115, Request for Acceptance of Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue (EAF) for the Safety Injection Nozzle | 21 April 2022 | Request for Acceptance of Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue (EAF) for the Safety Injection Nozzle | Aging Management License Renewal |
RA-22-0080, Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System | 7 April 2022 | Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System | Tornado Missile Commercial Grade Dedication Condition Adverse to Quality Tornado-Generated Missile Design basis earthquake Exemption Request Liquid penetrant Affidavit |