Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)10 January 2024Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)
RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of.12 December 2023Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of.Exemption Request
Pressure Boundary Leakage
Grace period
Unidentified leakage
Operational leakage
RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation4 December 2023Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationExemption Request
RA-23-0288, End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report16 November 2023End of Cycle 27 (C1 R27) Steam Generator Tube Inspection ReportNondestructive Examination
Flow Accelerated Corrosion
RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation16 November 2023RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ImplementationTime of Discovery
Fitness for Duty
Contraband
Condition Adverse to Quality
Safeguards Contingency Plan
Preemption Authority
Exemption Request
RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes1 November 2023Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of ChangesExemption Request
Siren
RA-23-0230, Refuel 27 (C1 R27) Inservice Inspection (ISI) Report25 September 2023Refuel 27 (C1 R27) Inservice Inspection (ISI) Report
RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes20 September 2023Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of ChangesMet Tower
Exemption Request
RA-23-0215, Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks28 August 2023Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks
RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)20 July 2023Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)Non-Destructive Examination
RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)20 July 2023Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)Non-Destructive Examination
Weld Overlay
Finite Element Analysis
RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require7 July 2023Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance RequireIncorporated by reference
Surveillance Frequency Control Program
Operational leakage
RA-18-0007, License Amendment Application to Revise Control Room Cooling Technical Specifications19 June 2023License Amendment Application to Revise Control Room Cooling Technical SpecificationsPost Accident Monitoring
Enforcement Discretion
Surveillance Frequency Control Program
Recently irradiated fuel
RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory7 June 2023Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory
RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations30 May 2023Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations
RA-23-0105, Duke Energy Carolinas, LLC (Duke Energy) - Core Operating Limits Report (COLR) for Unit 1 Cycle 28 Reload Core4 May 2023Duke Energy Carolinas, LLC (Duke Energy) - Core Operating Limits Report (COLR) for Unit 1 Cycle 28 Reload CoreBoric Acid
Shutdown Margin
RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.4626 April 2023Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46
RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 202226 April 2023Duke Energy Annual Radiological Environmental Operating Report - 2022Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Fukushima Dai-Ichi
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Earthquake
Chernobyl
RA-23-0046, Annual Radioactive Effluent Release Report - 202224 April 2023Annual Radioactive Effluent Release Report - 2022Annual Radioactive Effluent Release Report
RA-23-0042, Submittal of Updated Final Safety Analysis Report (Revision 23), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of a Commitment Change24 April 2023Submittal of Updated Final Safety Analysis Report (Revision 23), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of a Commitment ChangeSafe Shutdown
Time of Discovery
Reactor Vessel Water Level
Grab sample
Offsite Dose Calculation Manual
Slow transfer
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Qualified Offsite Circuit
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Operability Determination
Battery sizing
License Renewal
Earthquake
Commercial Grade
Power Operated Valves
Turbine Missile
Offsite Circuit
Fire Watch
Power change
Overspeed trip
Manual Operator Action
RA-23-0091, Submittal of Emergency Action Level (EAL) Technical Basis Document, Revision 413 April 2023Submittal of Emergency Action Level (EAL) Technical Basis Document, Revision 4Safe Shutdown
Time of Discovery
Health Physics Network
High winds
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Spent Fuel Pool Instrumentation
Safeguards Contingency Plan
Exemption Request
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Power change
Unidentified leakage
RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums30 March 202310 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums
RA-23-0040, Onsite Property Insurance Coverage30 March 2023Onsite Property Insurance Coverage
RA-23-0036, Biennial Decommissioning Financial Assurance Reports30 March 2023Biennial Decommissioning Financial Assurance Reports
RA-23-0084, Core Operating Limits Report (COLR) for Unit 1 Cycle 27 Reload Core, Rev. 429 March 2023Core Operating Limits Report (COLR) for Unit 1 Cycle 27 Reload Core, Rev. 4Boric Acid
Shutdown Margin
RA-23-0083, Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core, Rev. 216 March 2023Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core, Rev. 2Boric Acid
Shutdown Margin
RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)17 February 2023Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)Weld Overlay
Hydrostatic
Finite Element Analysis
Flow Accelerated Corrosion
Stress corrosion cracking
RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements16 February 2023Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage RequirementsOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Stress corrosion cracking
Pressure Boundary Leakage
Unidentified leakage
Operational leakage
RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI2 February 2023Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XIIncorporated by reference
RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies1 February 2023License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement FrequenciesEnforcement Discretion
Probabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
Operational leakage
RA-22-0608, Refuel 25 (C2R25) Inservice Inspection (ISI) Report25 January 2023Refuel 25 (C2R25) Inservice Inspection (ISI) ReportBoric Acid
RA-22-0256, Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)23 January 2023Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)
RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab5 December 2022Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab
RA-22-0331, Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core, Rev. 122 November 2022Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core, Rev. 1Boric Acid
Shutdown Margin
RA-22-0266, Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core19 September 2022Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload CoreBoric Acid
Shutdown Margin
RA-22-0253, Independent Spent Fuel Storage Installation (Isfsi), Register Use of Casks25 August 2022Independent Spent Fuel Storage Installation (Isfsi), Register Use of Casks
RA-22-0201, Refuel 24 Steam Generator Tube Inspection Report Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections21 July 2022Refuel 24 Steam Generator Tube Inspection Report Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections
RA-22-0220, Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Storage Casks19 July 2022Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Storage Casks
RA-22-0218, Emergency Action Level (EAL) Technical Basis Document, Revision 314 July 2022Emergency Action Level (EAL) Technical Basis Document, Revision 3Safe Shutdown
Time of Discovery
Health Physics Network
High winds
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Spent Fuel Pool Instrumentation
Safeguards Contingency Plan
Exemption Request
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Power change
Unidentified leakage
RA-22-0205, Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Storage Casks11 July 2022Independent Spent Fuel Storage Installation (Isfsi), Registration of Spent Fuel Storage Casks
RA-22-0180, Supplement to Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair for Life of Plant7 July 2022Supplement to Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair for Life of PlantWeld Overlay
Finite Element Analysis
Stress corrosion cracking
Affidavit
RA-22-0195, Response to Request for Additional Information (RAI) for the Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue for the Safety Injection Nozzle29 June 2022Response to Request for Additional Information (RAI) for the Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue for the Safety Injection NozzleLicense Renewal
Thermal fatigue
RA-22-0151, Duke Energy Common Emergency Plan, Revision 2, Summary of Changes24 May 2022Duke Energy Common Emergency Plan, Revision 2, Summary of ChangesExemption Request
Minimum staff
Grace period
Siren
RA-22-0148, 10 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified Laboratory16 May 202210 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified LaboratoryBlind Performance Test
RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility13 May 2022Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations FacilityHealth Physics Network
High winds
RA-22-0149, Supplement to the Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System28 April 2022Supplement to the Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage SystemExemption Request
RA-22-0028, Annual Report of Changes Pursuant to 10 CFR 50.4627 April 2022Annual Report of Changes Pursuant to 10 CFR 50.46
RA-22-0029, Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 202127 April 2022Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 2021Annual Radioactive Effluent Release Report
RA-22-0115, Request for Acceptance of Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue (EAF) for the Safety Injection Nozzle21 April 2022Request for Acceptance of Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue (EAF) for the Safety Injection NozzleAging Management
License Renewal
RA-22-0080, Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System7 April 2022Independent Spent Fuel Storage Installation, McGuire, Units 1 & 2, Independent Spent Fuel Storage Installation, Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage SystemTornado Missile
Commercial Grade Dedication
Condition Adverse to Quality
Tornado-Generated Missile
Design basis earthquake
Exemption Request
Liquid penetrant
Affidavit