L-MT-23-054, Subsequent License Renewal Application Supplement 8 | 11 January 2024 | Subsequent License Renewal Application Supplement 8 | Non-Destructive Examination Coatings Aging Management License Renewal |
L-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, | 2 January 2024 | Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, | |
L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data | 29 December 2023 | License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data | Safe Shutdown Shutdown Margin Fire Barrier Anticipated operational occurrence Hydrostatic Coatings Emergency Lighting Pressure and Temperature Limits Report License Renewal Subsequent License Renewal Fire Protection Program |
L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report | 20 December 2023 | Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report | Hydrostatic Nondestructive Examination Pressure and Temperature Limits Report |
L-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 | 18 December 2023 | Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 | Offsite Dose Calculation Manual |
L-MT-23-042, 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 | 11 December 2023 | 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 | Power Uprate |
L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 | 5 December 2023 | Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 | Safe Shutdown Surveillance Frequency Control Program Offsite Circuit |
L-MT-23-052, Subsequent License Renewal Application Supplement 7 | 30 November 2023 | Subsequent License Renewal Application Supplement 7 | Aging Management License Renewal |
L-MT-23-051, Update to the Technical Specification Bases | 28 November 2023 | Update to the Technical Specification Bases | |
L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 | 21 November 2023 | Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 | |
L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 | 13 November 2023 | 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 | Grace period |
L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 | 10 November 2023 | License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 | Safe Shutdown Surveillance Frequency Control Program |
L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 | 9 November 2023 | Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 | Coatings VT-2 Aging Management Through Wall Leak |
L-MT-23-041, Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 | 3 October 2023 | Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 | Aging Management License Renewal Subsequent License Renewal |
L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 | 28 September 2023 | License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 | Safe Shutdown Surveillance Frequency Control Program Offsite Circuit |
L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 3 | 22 September 2023 | Subsequent License Renewal Application Response to Request for Additional Information Set 3 | Coatings Aging Management License Renewal Subsequent License Renewal |
L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy | 11 September 2023 | Baffle Former Bolts Alternate Aging Management Strategy | Aging Management |
L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 | 5 September 2023 | Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 | Fire Barrier Coatings Aging Management License Renewal Subsequent License Renewal Fire Protection Program |
L-MT-23-035, Subsequent License Renewal Application Supplement 5 | 28 August 2023 | Subsequent License Renewal Application Supplement 5 | Finite Element Analysis Aging Management Scram Discharge Volume License Renewal Pressure Boundary Leakage |
L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 1 | 15 August 2023 | Subsequent License Renewal Application Response to Request for Additional Information Set 1 | Hydrostatic Operating Basis Earthquake Incorporated by reference Aging Management License Renewal Dissimilar Metal Weld |
L-MT-23-032, 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 | 31 July 2023 | 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 | Locked High Radiation Area Test box Scaffolding |
L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report | 31 July 2023 | 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report | Through-Wall Leakage |
L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 | 18 July 2023 | Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 | Fire Barrier Hydrostatic Coatings Operating Basis Earthquake Aging Management License Renewal Subsequent License Renewal Power Uprate |
L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT | 14 July 2023 | License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT | Non-Destructive Examination Hydrostatic Liquid penetrant |
L-MT-23-030, Subsequent License Renewal Application Supplement 3 | 4 July 2023 | Subsequent License Renewal Application Supplement 3 | Hydrostatic Fire Protection Program |
L-MT-23-025, Subsequent License Renewal Application Supplement 2 | 26 June 2023 | Subsequent License Renewal Application Supplement 2 | High Radiation Area Fire Barrier Coatings Nondestructive Examination Aging Management Moisture barrier License Renewal Through-Wall Leakage Fire Protection Program Dissimilar Metal Weld |
L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions | 22 June 2023 | License Amendment Request to Revise Technical Specification 3.7.8 Required Actions | Safe Shutdown Probabilistic Risk Assessment |
L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report | 14 June 2023 | 2022 10 CFR 50.46 LOCA Annual Report | |
L-MT-23-019, Submittal of 2022 Annual Radiological Environmental Operating Report | 10 May 2023 | Submittal of 2022 Annual Radiological Environmental Operating Report | Offsite Dose Calculation Manual Fukushima Dai-Ichi Annual Radiological Environmental Operating Report Earthquake Chernobyl |
L-MT-23-020, Submittal of 2022 Annual Radioactive Effluent Release Report | 10 May 2023 | Submittal of 2022 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
L-MT-23-021, Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 32 | 2 May 2023 | Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 32 | MELLLA |
L-PI-23-010, Annual Report of Individual Monitoring | 27 April 2023 | Annual Report of Individual Monitoring | |
L-MT-23-017, 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) | 18 April 2023 | 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) | |
L-MT-23-010, Subsequent License Renewal Application Supplement 1 | 3 April 2023 | Subsequent License Renewal Application Supplement 1 | |
L-MT-23-013, Core Operating Limits Report (COLR) for Cycle 31, Revision 3 | 28 March 2023 | Core Operating Limits Report (COLR) for Cycle 31, Revision 3 | MELLLA |
L-PI-23-007, Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) | 28 March 2023 | Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) | Hydrostatic Pressure and Temperature Limits Report |
L-MT-23-012, Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 2 | 17 March 2023 | Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 2 | MELLLA |
L-PI-23-005, CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) | 3 March 2023 | CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) | Incorporated by reference |
L-MT-23-008, 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003) | 7 February 2023 | 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003) | Incorporated by reference |
L-PI-23-001, Day Steam Generator Tube Inspection Report | 30 January 2023 | Day Steam Generator Tube Inspection Report | |
L-MT-23-004, CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program | 23 January 2023 | CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program | Non-Destructive Examination |
L-MT-23-005, Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088) | 6 January 2023 | Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088) | Anchor Darling |
L-PI-22-047, Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report | 21 December 2022 | Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report | Nondestructive Examination |
L-MT-22-049, Industry Groundwater Protection Initiative Special Report | 15 December 2022 | Industry Groundwater Protection Initiative Special Report | Offsite Dose Calculation Manual |
L-MT-22-052, L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative | 15 December 2022 | L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative | |
L-MT-22-046, 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 | 13 December 2022 | 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 | |
L-PI-22-020, Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) | 2 December 2022 | Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) | Stroke time Hydrostatic Nondestructive Examination Incorporated by reference Pressure and Temperature Limits Report Exemption Request |
L-MT-22-048, Update to the Monticello Technical Specification Bases | 28 November 2022 | Update to the Monticello Technical Specification Bases | |
L-MT-22-047, Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval | 10 November 2022 | Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval | |
L-MT-22-045, Letter Submitting Post-Exam Package | 4 November 2022 | Letter Submitting Post-Exam Package | |