IR 05000225/2023201 | 12 December 2023 | Nuclear Regulatory Commission Routine Inspection Report No. 05000225/2023201 - Cover Letter and Enclosure | Pandemic COVID-19 |
IR 05000225/2022201 | 8 February 2023 | U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000225/2022201 - Cover Letter and Enclosure | |
IR 05000225/2022202 | 7 February 2023 | U.S. Nuclear Regulatory Commission Security Inspection Report No. 05000225/2022202 - Non-OUO-SRI Cover Letter | |
IR 05000225/2021201 | 6 December 2021 | Nuclear Regulatory Commission Routine Inspection Report 05000225/2021201 and Notice of Violation | |
IR 05000225/2020201 | 20 October 2020 | U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000225/2020201 | |
IR 05000225/2019202 | 19 September 2019 | Nuclear Regulatory Commission Security Inspection Report No. 05000225/2019202 (Cover Letter) | |
IR 05000225/2019201 | 19 September 2019 | Nuclear Regulatory Commission Routine Inspection Report No. 05000225/2019201 - August 2019 | |
IR 05000225/2018201 | 12 October 2018 | U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000225/2018201 | |
IR 05000225/2017201 | 5 December 2017 | Reactor Facility Routine Safety Inspection Report 05000225/2017201 | |
ML16348A297 | 5 January 2017 | Rensselaer Polytechnic Institute - U.S. Nuclear Regulatory Commission Operations Inspection Report No. 50-225/2016-201 | |
IR 05000225/2016202 | 4 January 2017 | U.S. Nuclear Regulatory Commission Operations Inspection Report No. 50-225/2016-202. (Cover Letter Only) | |
IR 05000225/2014202 | 4 February 2015 | IR 05000225/2014202, on 12/08-11/2014, Rensselaer Polytechnic Institute | |
IR 05000225/2011201 | 30 August 2011 | IR 05000225-11-201 on 08/01/11 - 08/03/11 at the Rensselaer Polytechnic Institute | |
IR 05000255/2011002 | 4 May 2011 | IR 05000255-11-002; 01/01/2011 - 03/31/2011; Palisades Nuclear Plant; Operability Evaluations, Identification and Resolution of Problems, Followup of Events and Notices of Enforcement Discretion, Other Activities | Offsite Dose Calculation Manual Past operability Enforcement Discretion Temporary Modification VT-2 Qualified Offsite Circuit Significance Determination Process Fatigue Rule Offsite Circuit Fire Protection Program Downpower |
IR 05000225/2010202 | 31 August 2010 | IR 05000225-10-202, on August 2-5, 2010, Rensselaer Polytechnic Institute, Transmittal Letter of Security-Related Inspection Report No. 05000225-10-202 | |
IR 05000225/2010201 | 31 August 2010 | IR 05000225-10-201 on 08/02/10 - 08/05/10 for Rensselaer Polytechnic Institute | High Radiation Area License Renewal Siren |
IR 05000225/2009201 | 30 September 2009 | IR 05000225-09-201, on 08/31/2009 - 09/02/2009, Rensselaer Polytechnic Institute NRC Routine Inspection Report and Notice of Violation | |
IR 05000225/2008201 | 14 October 2008 | IR 50-225-08-201 on 09/22/08 - 09/25/08 for Rensselaer Polytechnic Institute | |
IR 05000225/2008202 | 14 October 2008 | NRC Routine Inspection Report No. 05000225-08-202. Cover Letter Only | |
IR 05000225/2007201 | 10 August 2007 | IR 05000225-07-201, on 07/31/2007 Through 08/02/2007, for Rensselaer Polytechnic Institute Reactor Critical Facility | License Renewal |
IR 05000225/2005201 | 4 April 2006 | IR 05000225-05-201, on 02/06/2006 - 02/09/2006, and 02/28/2006, Rensselaer Polytechnic Institute | High Radiation Area License Renewal Siren |
IR 05000225/2004201 | 11 February 2004 | NRC Inspection Report No. 50-225/2004-201 | License Renewal Siren |
IR 05000225/2002201 | 5 September 2002 | IR 05000225-02-201 & NOV, on 05/28/2002 - 05/31/2002, Rensselaer Polytechnic Institute, Onsite Review of Selected Activities at the L. David Walthousen Critical Experimental Facility Research Reactor. Violation Noted | High Radiation Area |
IR 05000225/1998201 | 28 April 1998 | Insp Rept 50-225/98-201 on 980407-10.No Violations Noted. Major Areas Inspected:Protection of Public Health & Safety | High Radiation Area License Renewal Power change |
IR 05000225/1993001 | 24 November 1993 | Insp Repts 50-225/93-01 & 70-0920/93-01 on 931102-01.No Violations Noted.Major Areas Inspected:Accounting & Physical Security,Facility Operation,Measurement & Controls,Shipping & Receiving & Storage & Internal Controls | |
IR 05000225/1989001 | 13 July 1989 | Insp Rept 50-225/89-01 on 890518-19.No Violations Noted. Major Areas Inspected:Licensee Emergency Preparedness Program | Emergency Lighting |
IR 05000225/1988004 | 4 November 1988 | Insp Rept 50-225/88-04 on 880817-18.No Violations Noted. Major Areas Inspected:Facility Organization,Action on Previous NRC Findings,Logs & Records,Procedures, Surveillances & Mgt Oversight | |
IR 05000225/1988003 | 28 September 1988 | Insp Rept 50-225/88-03 on 880826.No Violations Noted. Major Areas Inspected:Safety Insp in Area of Emergency Preparedness | |
IR 05000225/1988002 | 13 July 1988 | Insp Rept 50-225/88-02 on 880707-10.Violation Noted.Major Areas Inspected:Nuclear Matl Control,Accounting & Physical Security,Including Facility Organization & Operation, Measurement & Controls,Shipping & Receiving & Inventory | Authorized possession limits |
IR 05000225/1988001 | 21 June 1988 | Exam Rept 50-225/88-01OL on 880524-25.Exam Results:One Senior Reactor Operator Failed Both Written & Operating Exams.Proposed License Denial Issued | Failure to Scram |
IR 05000225/1987002 | 1 February 1988 | Exam Rept 50-225/87-02(OL) on 871201-02.Exam Results:One Senior Reactor Operator Passed Written & Operating Exam & One Failed Operating Exam | Shutdown Margin Fatality |
IR 05000225/1986001 | 9 July 1986 | Partially Withheld Matl Control & Accounting & Physical Security Insp Repts 50-225/86-01 & 70-0920/86-01 on 860304-07 (Ref 10CFR2.790).Violation Noted:Failure to Notify NRC of Physical Security Plan Changes & Perform Alarm Tests | Authorized possession limits |
IR 05000225/1985003 | 21 November 1985 | Insp Rept 50-225/85-03 on 851008-09.No Unacceptable Conditions Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Facility Operations,Maint & Surveillance & Emergency Procedures & Annual Exercise | License Renewal Fatality |
IR 05000225/1985001 | 26 August 1985 | Insp Rept 50-225/85-01 on 850708-09.No Violation Noted.Major Areas Inspected:Radiation Protection Program,Including Exposure Control,Instruments & Calibr,Experiments,Training, Repts & Notifications | |
IR 05000225/2005003 | 4 June 1985 | Insp Rept 50-458/85-18 on 850225-0503.Deviation Noted: Ranges of Display Instrumentation for HPCS Flow & RHR Svc Water Flow Contrary to Table 7.5-1 of Fsar,Amend 11, Dtd Jan 1984 | |
IR 05000225/2003001 | 5 April 1985 | Insp Rept 50-344/85-09 on 850225-0301.No Violations or Deviations Noted.Major Areas Inspected:Action on Previous Insp Findings,Solid,Liquid & Gaseous Waste Mgt,Facility Tour & Followup on IE Info Notices | High Radiation Area Hydrostatic Process Control Program |
IR 05000225/2003005 | 13 February 1985 | Confirms Plans to Conduct Plant Operations & Surveillance Insp at Site on 850225-0305.Insp Team Listed |