IR 05000225/1988003

From kanterella
Jump to navigation Jump to search
Insp Rept 50-225/88-03 on 880826.No Violations Noted. Major Areas Inspected:Safety Insp in Area of Emergency Preparedness
ML20154R911
Person / Time
Site: Rensselaer Polytechnic Institute
Issue date: 09/28/1988
From: Amato C, Lazarus W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20154R893 List:
References
50-225-88-03, 50-225-88-3, NUDOCS 8810040384
Download: ML20154R911 (5)


Text

. 0

'

.

. .

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

Report N /88-03 Docket N _50-225 License N CX-22 Licensee: Rensselear Polytechnic Institute Troy, New York 12180 Facility: Rensselaer Polytechnic Institute Reactor Critical Critical Facility Inspection Conducted: August 26, 1988 Inspector: <#% b C. 7).matf Q Emergency Pf/paredness j

' date

[

SpeTialist, EPS, FRSSB, DRSS Approved by: e*c W 1V #/ 7 /[

W. {,A.aza9us, Chief, Emergency Preparedness 'date Section, FRSSB, DRSS Inspection Summary: Inspection on August 12, 1988 (Report No. 50-225/68-03)

Areas Inspected: Routine, announced, safety inspection in the area of emergency preparednes Results: No violations were identifie %$kV $p 0$$ g5 Q

--

. o

.

.

DETAILS 1.0 Persons Contacted The following personnel attended the entrance and exit meetin D. Harris, Ph.0, Director Reactor Critical Facility P. Angelo, Supervisor, Reactor Critical Facility F. Rodriguezy Vera, Ph.0, Consultant 2.0 Facility Discription The Rensselaer Polytechnic Institute's Reactor Critical Facility (RPI RCF)

is located within the City and County of Schenectady, New York about 15 miles west of the RPI campus in Troy, New York, along the south bank of the Mohawk River. The facility is housed within a single structure the interior of which is divided into five areas: Reactor Room; Vault; Counting Room; Control Room; and an office. The RCF supports an academic program but no research programs. The staff is not located at the facility except when the RCF is in us The NRC classification for this reactor is RCF 2. The Emergency Plan and Procedures were revised in 1987. The reactor is an open tank type fueled with High Enrichment Uranium (HEU) clad with stainless steel. There are seven control rods with fuel followers and six interlocks which will scram the reactor Maximum power level is 100 There are wall mousted area radiation monitors, an airborne particulate monitor and portable survey equipment including a "frisker".

3.0 The Emergency Preparedness Organization 3.1 The Emergency Preparedness Organization is comprised of the Facility Director, the Reactor Supervisor, the former reactor supervisor who would serve as a consultant, RPI Security Officers (s) and the RPI Radiation Safety Office This area is acceptabl .2 Emergency Classification Emergency classifications are based on the established Emergency Planning Zone which is outside the reactor room but inside the Reactor Building, therefore, only two emergency classifications have been established: 1) Personnel Emergency; 2) and Emergency Aler The former lists the only condition as human injur The latter classification consists of six events and symptoms. These classifi-cations serve as the Emergency Action Levels (EALs) por Section of the RCF Emergency Plan. This area is acceptabl _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

.

. .

4.0 Emergency Response 4.1 A review of thie Emergency Plan indicates that a staff member in the RCF will sound the emergency alarm following identification of an EA The reactor may be shut-down and personnel assembled in the shielded counting room. A secondary assembly area is at the front gate on Maxom Road. The senior staff member present assesses the situation and will take appropriate actions. An undated list of 12 emergency phones is included in the Plan which includes three New York State phone numbers, and the NRC RI number but not the number for NRC's Hesdquarter's Operation Of ficer (H00). Figure 1 of the Plan is the ERO Table of Organization (TO). Addendum 1 of the Plan which lists emergency numbers does not list numbers for all of the indivi-duals identified in the T0. This telephone list should be updated and then reviewed on a periodic basis to ensure that it remains curren Procedures should clearly indicate that NRC contact in an emergency is through the H00. This item is unresolved and will be subject to a futura inspection. (50-225/8S-03-01)

4.2 Emergency equipment consists of portable survey meters, a "frisker",

three sets of anti-contamination clothing, two sets of Self Contained Breathing Apparatus (SCBAs), continuous air monitor, portable survey meters and a digital ratemeter. Much of this equipment serves a dual purpose: normal operation and emergency use. Calibration of instru-nients and the inspection of the SCBAs by RPIs Safety Department was curren The licensee does not maintain a list of emergency equipment detailing its location within a single enclosure nor surveillance records. Additionally a first aid kit could not be found (first aid supplies were available). following discussion with the inspector, the Licensee agreed to procure and wall mount a first aid kit, assemble emergency equipment in an identified location, and post an emergency equipment lis This matter will be reviewed in a future inspectio .3 Fire extinguishers Class A, B, C, and special materials were available and had been inspected by the RPI Safety Department during l July 198 ,

r 5.0 Off-Site _ Activities

5.1 Off-s'te activities are associated with local Police and Fire l Services and the Ellis Hospita Documentation was available in the l form of sign-in sheets showing Police officers had entered the f acil it The Licensee stated Fire Officers had visited the RCF under the auspices of the RPI Security Offic Documentation could not be located attesting to these visits by fire official Such l

annual visits should be scheduled and documented. The licensee is l evaluating possible improvements in this area. This natter will be subject to a future inspection.

!

e

,

, .

5.2 There is no current Letter of Agreement with Ellis Hospital to accept injured and contaminated individual The Licensee agreed to develop such a signed agreement as rapidly as possible. The Licensee did point out that Ellis had "played" in recent medical drills and had entered into an agreement with the Knolls Atomic Power Laboratory to ar. cept any of their staff who may be injured and contaminated; the Licensee also indicated Ellis provides the ambulance service. This item is unresolved. (50-225/83-03-02)

6.0 Training 6.1 There was no training documentation in either the Plan or Procedure Section 10 of the Plan states the RCF staff will review the Pla The RSO stated relevant material is presented to students during annual indoctrination. Absence of formalized training is contrary to the guidance given in NRC Regulatory Guide 2.6 and ANSI 15.1 This matter is unresolved and will be sutJect to a future inspactio (50-225/88-03-03)

7.0 Review of this Plan 7.1 Section 10 of the Plan states the RCF Facility Supervisor shall review the Plan annually and submit changes to the Nuclear Safety Review Board (NSRB) which meets semiannually per Technical Specifi-catior. 6.1.5. No documentation of any review was available. This item will be subject to a future inspectio (50-225/88-03-04)

I 8.0 Communications ,

9.1 The only communication capability is a single phone If re with two drops. Apparently, RPI Security has voiced concern as to the adequacy of this system in the event of an emergency, Possible charges are being evaluated. This matter will be subject to a future inspectio Based on th? the information given in Sections 2.0 to 8.0 above, emergency planning guidance elements are folloi<ed to an acceptable degree and the Licensee has developed a capability to cope with incident .0 Unresolved items An unresolved item req P tional information to determine whether it is acceptable or a vio .., or deviatio Paragraphs 4.1, 5.2, and 7.1 contain unresolved item . _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . >.

.

.

~

10.0 Exit Meeting 10.1 The inspector met with the individuals noted in Section 1.0 of this report and advised them no violations had been identified. A number of improvement areas had been note The Licensee agreed to review these and take appropriate action. At no time during the inspection, did the inspector give the licensee written materia ;

{