ML23279A1206 October 2023Response to NRC Inspection Report and Preliminary White FindingPreliminary White Finding
ML22320A04315 November 2022Response to NRC Inspection Report and Preliminary White FindingPreliminary White Finding
IR 05000317/201640310 November 2016Errata for Calvert Cliffs Nuclear Power Plant - Baseline Security Inspection Report 05000317/2016403, 5000318/2016403; Independent Spent Fuel Storage Security Inspection Report 07200008/2016401; and Exercise of Enforcement Discretion (LetteEnforcement Discretion
Affidavit
ML16159A26814 June 2016Cover Letter - Calvert Cliff Nuclear Power Plant - NRC Security Baseline Inspection Report 05000317/2016201 and 05000318/2016201
ML12100A2179 April 2012NRC Investigation Report No. I-2011-047, Letter to Constellation EnergyFire Protection Program
IR 05000317/201140326 July 2011IR 05000317-11-403, IR 05000318-11-403; 01/26/2011-07/13/2011; Calvert Cliffs Nuclear Power Plant; Special Inspection, Dated July 26, 2011 (Letter Only)Significance Determination Process
Affidavit
ML10207040626 July 2010Notification of Conduct of a Triennial Fire Protection Baseline Inspection While Transition to 10 CFR Part 50.48(c) Is in ProgressSafe Shutdown
Fitness for Duty
Fire Barrier
Temporary Modification
Emergency Lighting
Severe Accident Management Guideline
B.5.b Mitigating Strategies
Fire Protection Program
IR 05000247/20080122 June 2008Pre-Inspection Cover Sheet for Indian Point Unit 2, 50-247/2008-012 Inspection; Lead Inspector: J. Richmond
ML08116015423 April 2008Notification of Inspection of the Implementation of B.5.b Phase 2 and 3 Mitigating Strategies Using Temporary Instruction 2515/171B.5.b Mitigating Strategies
IR 05000317/200740315 June 2007IR 05000317-07-403, and IR 05000318-07-403, on 05/14/2007 - 05/17/2007, Calvert Cliffs Nuclear Power Plant, Material Control and Accounting (Mc&A) Program. Cover Letter
ML07094050412 January 2007Ltr from Orise Dtd 01/12/2007, Final Letter Report for Requested Analyses of Six Water Samples, Set Eleven, from the Indian Point Power Station, Buchanan, New York (Inspection Report No. 05000247/2006-007) (Rfta No. 06-001)
IR 05000247/20060074 January 2007Ltr from Orise Dtd 01/04/2007, Final Letter Report for Requested Analyses of Nine Water Samples, Set Nine, from the Indian Point Power Station, Buchanan, New York (Inspection Report No. 05000247/2006007) (Rfta No. 06-001)
ML0709406184 January 2007Ltr from Orise Dtd 01/04/2007, Final Letter Report for Requested Analyses of Nine Water Samples, Set Nine, from the Indian Point Power Station, Buchanan, New York (Inspection Report No. 05000247/2006007) (Rfta No. 06-001)
ML06349022211 December 2006Inspection Requests Associated with IP 2&3 PI&R Inspection IR 50-247 & 286 06-006Temporary Modification
ML0701105593 November 2006Interim Report for Requested Analyses for Samples from Sets Seven Through Nine and Sets Eleven Through Fourteen, from the Indian Point Power Station, Buchanan, New York. (Inspection Report No. 050-247/2006-007) (Rfta No. 06-001)
IR 05000247/200601117 October 2006IR 05000247-06-011, and IR 05000286-06-009, Indian Point Nuclear Generating Units 2 and 3, Ti 2515/168Affidavit
IR 05000003/201800612 October 2006IR 05000317-06-301 and IR 05000318-06/301 on 08/25, 08/28 - 09/01, 09/13 and 09/05-29/2006, Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Initial Operator Licensing Examination
ML07011057711 October 2006Report for Requested Reanalysis of One Vegetation Sample for Nickel-63, Set Seven, Collected Between June 14 and June 22, 2006 from the Indian Point Power Station, Buchanan, New York. (Inspection Report No. 050-247/2006-007) (Rfta No. 06-00
ML07011060211 October 2006Letter Report for Uranium Analysis of One Water Sample, Set Ten, from the Indian Point Power Station, Buchanan, New York. (Inspection Report No. 050-247/2006-007) (Rfta No. 06-001)
ML07094053415 March 2006Ltr from Orise Dtd 03/15/2006, Interim Report for Completed Analyses for Samples from Set Sixteen, from the Indian Point Power Station, Buchanan, New York (Inspection Report No. 05000247/2006007) (Rfta No. 06-001)
ML0709405461 March 2006Ltr from Orise Dtd 03/01/2006, Second Interim Report for Completed Analyses for Samples from Set Fifteen, from the Indian Point Power Station, Buchanan, New York (Inspection Report No. 05000247/2006007) (Rfta No. 06-001)
ML06072014813 February 2006Orise Split Sample Analytical Results from Indian Point
ML0709405152 February 2006Ltr from Orise Dtd 02/02/2006, Second Interim Report for Requested Analyses of Eight Water Samples, Set Fourteen, from the Indian Point Power Station, Buchanan, New York (IR 05000247/2006007) (Rfta No. 06-001)
ML07094057419 January 2006Ltr from Orise Dtd 01/19/2006, Final Report for Requested Analyses of Three Water Samples, Set Twelve, from the Indian Point Power Station, Buchanan, New York (Inspection Report No. 05000247/2006007) (Rfta No. 06-001)
IR 05000317/200300616 January 2004IR 05000317-03-006, 05000318-03-006; 9/28/2003-12/31/2003; Calvert Cliffs Nuclear Plant, Units 1 and 2; Operability EvaluationsBoric Acid
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Post Accident Monitoring
Enforcement Discretion
Temporary Modification
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Operability Determination
Exemption Request
IR 05000247/200301430 December 2003Physical Security Baseline Inspection Report Nos. 05000247-03-014 and 05000286-03-012
IR 05000247/200101426 March 2002IR 05000247/2001-014, on 12/30-020/9/2002, Entergy Nuclear Operations, Inc.; Indian Point 2 Nuclear Power Plant. Design Control for Mitigating Systems, Barrier Integrity, and Cross-Cutting Issues. Non-cited Violations IdentifiedSafe Shutdown
Packing leak
Fire Barrier
Probabilistic Risk Assessment
Temporary Modification
Missed surveillance
Significance Determination Process
Operability Determination
Through Wall Leak
IR 05000286/200101322 March 2002IR 05000286/2001-013, Entergy Nuclear Northeast, Indian Point 3 Nuclear Power Plant, Resident Inspection on 12/30/2001 - 02/16/2002 Related to Radiation Protection. No Violations NotedHigh Radiation Area
Locked High Radiation Area
Operability Determination
Unidentified leakage
IR 05000317/200101228 January 2002IR 05000317/2001-012, IR 05000318/2001-012, Calvert Cliffs Nuclear Plant Inc.; Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Inspection on 11/11/2001 - 12/29/2001 Re Problem Identification and Resolution. Two Noncited Violations Noted
ML02028050528 January 2002IR 05000317/2001-012, IR 05000318/2001-012, on 11/11-12/29/2001, Calvert Cliffs Nuclear Plant, Inc.; Calvert Cliffs Nuclear Power Plant, Units 1 & 2. Problem Identification and Resolution. Three Non-Cited Violations NotedProbabilistic Risk Assessment
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Scaffolding
Siren
IR 05000317/200101314 January 2002IR 05000317/2001-013, Calvert Cliffs Nuclear Plant, Inc, Calvert Cliffs Nuclear Power Plant Units 1&2, Supplemental Inspection on 12/10-12/13/2001 Re Degraded Cornerstone in Mitigating Systems & One Degraded CornerstoneProbabilistic Risk Assessment
Significance Determination Process
IR 05000286/20010071 October 2001IR 05000286/2001-007, Indian Point 3 Nuclear Power Plant. on 07/18/2001 Related to Safety and Compliance. Non-cited Violations NotedFire Barrier
Past operability
Temporary Modification
Significance Determination Process
Operability Determination
Fire Watch
ML0127501821 October 2001IR 05000286/2001-007, Indian Point 3 Nuclear Power Plant. on 07/18/2001 Related to Safety and Compliance. Non-cited Violations NotedBoric Acid
Fire Barrier
Past operability
Temporary Modification
Significance Determination Process
Fire Watch