ML070660112

From kanterella
Jump to navigation Jump to search
Containment IWE Inservice Inspection Plan
ML070660112
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 03/06/2007
From: Gerald Bichof
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
07-0118
Download: ML070660112 (30)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA2326 1 March 6, 2007 United States Nuclear Regulatory Commission Serial No.: 07-0118 Attention: Document Control Desk NL&OS/GDM: RO Washington, D. C. 20555 Docket Nos.: 50-2801281 50-3381339 License Nos.: DPR-32/37 NPF-417 VIRGINIA ELECTRIC AND POWER COMPANY Pursuant to the requirements of paragraph IWA-1400(c) of the ASME Code,Section XI, 2001 Edition through the 2003 Addenda, Virginia Electric and Power Company (Dominion) is providing herein the second ten-year inspection interval Containment IWE Inservice lnspection (ISI) Plan for North Anna and Surry Power Stations Units 1 and 2.

The attached Plan does not include any relief requests; therefore, NRC approval is not required. The Plan describes the examinations to be conducted during the next ten-year inspection interval and was approved by the North Anna and Surry Station Nuclear Safety and Operating Committees. The North Anna and Surry Containment IWL IS1 Plan for the second ten-year inspection interval was submitted previously. (Reference Dominion letter dated October 19, 2005, Serial No.05-650.)

If you have any questions or require additional information, please contact Mr. Gary D. Miller at (804) 273-2771.

Very truly yours, Gerald T. Bischof Vice President -

Attachment:

Virginia Electric & Power Company (Dominion), Containment IWE lnservice lnspection Plan, North Anna Power Station 112, Surry Power Station 112, Second Ten-Year Containment lnspection Interval

Serial No. 07-01 18 Docket Nos. 50-2801281 and 50-3381339 Page 2 of 2 Cc~mmitmentsmade in this letter: None cc:: U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23 T85 Atlanta, Georgia 303035 Mr. N. P. Garrett NRC Senior Resident lnspector Surry Power Station Mr. J. T. Reece NRC Senior Resident lnspector North Anna Power Station Mr. S. P. Lingam NRC Project Manager - North Anna and Surry Power Stations U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. L. N. Olshan NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. R. E. Martin NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. R. A. Smith Authorized Nuclear Insurance lnspector Surry Power Station Mr. M. Grace Authorized Nuclear lnsurance lnspector North Anna Power Station

Serial No. 07-01 18 Docket Nos. 50-2801281 and 50-3381339 ATTACHMENT VIRGINIA ELECTRIC & POWER COMPANY (DOMINION)

CONTAINMENT IWE INSERVICE INSPECTION PLAN NORTH ANNA POWER STATION 112 SURRY POWER STATION 112 SECOND TEN-YEAR CONTAINMENT INSPECTION INTERVAL Revision 0 02-15-2007

Serial No. 07-01 18 Docket Nos. SO-280/281 and 50-338/339 IWE Containment IS1 Plan, Rev. 0 (02115/07)

TABLE OF CONTENTS Section Page PLAN DESCRIPTION REFERENCES DEFINITIONS PRIMARY CONTAINMENT DESIGN CONTAINMENT IWE INSERVICE INSPECTION CONTAINMENT EXAMINATION SCOPE CODE CASES RELIEF REQUESTS INSPECTION PLAN SUMMARIES 9.1 North Anna Power Station Unit 1 9.2 North Anna Power Station Unit 2 9.3 Surry Power Station Unit 1 9.4 Surry Power Station Unit 2 Tatbles Table 1 - IWE EXAMINATIONS Attachments Page 2 of 28

Serial No. 07-0 1 18 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115/07) 1.0 PLAN DESCRIPTION The Containment IWE Inservice Inspection Plan outlines the requirements for Inservice Inspection (ISI) of the metal components of the containment pressure boundary.

The Code of Federal Regulations, Title 10, Part 50, Section 55a, (10CFR50.55a) incorporates by reference the 2001 Edition through the 2003 Addenda of Subsection IWE of Section XI of the ASME Boiler & Pressure Vessel Code. Subsection IWE contains the requirements for IS1 of Class MC (metallic containment and metallic shell and penetration liners of Class CC containment) of light-water cooled nuclear power plants.

2.0 REFERENCES

2.1 Regulatorv Documents Code of Federal Regulations; Title 10, Energy; Part 50, Domestic Licensing of Production and Utilization Facilities; Section 50.55a, Codes and Standards Code of Federal Regulations; Title 10, Energy; Part 50, Domestic Licensing of Production and Utilization Facilities; Appendix J, Primary Containment Leakage Testing for Water-cooled Power Reactors Regulatory Guide 1.147, Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1 USNRC NUREG-1 522, Assessment of Inservice Conditions of Safety-Related Nuclear Plant Structures USNRC Inspection Manual, Inspection Procedure 62003, Inspection of Steel and Concrete Containment Structures at Nuclear Power Plants USNRC IN 89-79 Supplement 1, Degraded Coatings and Corrosion of Steel Containment Vessels USNRC IN 97-10, Liner Plate Corrosion in Concrete Containments USNRC IN 97-1 1, Cement Erosion from Containment Subfoundations at Nuclear Power Plants USNRC IN 97- 13, Deficient Conditions Associated with Protective Coatings at Nuclear Power Plants 2.1.10 USNRC IN 97-29, Containment Inspection Rule Page 3 of 28

Serial No. 07-01 18 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (0211 5/07) 2.2 Codes and Standards 2.2.1 ASME Boiler and Pressure Vessel Code,Section XI, Subsections IWE 2001 Edition through 2003 Addenda 2.3 Dominion Documents 2.3.1 Dominion Inservice Inspection Manual 2.3.2 VPAP-0307, Repair and Replacement 2.3.3 VPAP-1103, Visual Examination 2.3.4 VPAP-0904, Control of Protective Coatings 2.3.5 TRCP-0014, Visual Testing Training Program Written Practice 2.3.6 North Anna Power Station, Units 1&2, Technical Specifications 2.3.7 Surry Power Station, Units 1&2, Technical Specifications 2.3.8 North Anna Power Station, Units 1&2, Updated Final Safety Analysis Report 2.3.9 Surry Power Station, Units 1&2, Updated Final Safety Analysis Report 2.3.10 North Anna Stone and Webster Specification NAS-4 1 2.3.1 1 North Anna Stone and Webster Specification NAS-3 1 2.3.12 Surry Stone and Webster Specification NUS-35 2.3.13 Surry Stone and Webster Specification NUS-46 2.3.14 Surry Stone and Webster Specification NUS-56 3.0 DEFINITIONS 3.1 Primary Containment: Those parts of the containment structure that serve as a leak-tight barrier and serve to prevent the uncontrolled release of radioactivity to the environment under normal or postulated accident conditions.

Page 4 of 28

Serial No. 07-01 18 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115/07)

Primary Containment IWE Components: Metallic parts (i.e., metallic liner, metallic penetration liners, bolting) which have been classified as ASME Code Class CC for the purpose of performing Section XI ISI.

Accessible Areas: Those areas of the containment pressure retaining surface, including integral attachments, which can be examined directly or remotely.

Inaccessible Areas: Surface areas may be considered inaccessible if visual access by line of sight with adequate lighting from permanent vantage points is obstructed by permanent plant structures, equipment, or components, provided these surface areas do not require examination in accordance with the inspection plan (specific location) or IWE-1240.

Integral

Attachment:

Attachments to the pressure retaining surface of containment that serve a pressure retaining function, or are a structural attachment.

Structural

Attachment:

Attachments that are welded, cast or forged integrally to the pressure retaining surface of containment, and perform a pressure retaining function or are in the containment vessel support load path.

Non-structural

Attachment:

(Includes minor permanent and temporary attachments) Attachments to the pressure retaining surface of containment that do not perform a pressure retaining function nor are in the containment vessel support load path. Examples include leak chase channels, insulation supports, cable tray supports, nameplates, locating and lifting lugs, lighting supports and walkway supports.

4.0 PRIMARY CONTAINMENT DESIGN The containment is a cylindrical, carbon steel lined, reinforced concrete structure with a hemispherical dome including foundations, access openings and penetrations which function to contain the mechanical systems, components and major piping which comprise the reactor coolant boundary. The containment is designed to operate at subatmospheric pressure. (Ref. UFSAR Chap. 5 for Surry, Chap. 6 for North Anna)

The containment was designed and constructed prior to the implementation of ASME Code, Section I11 with regard to containment (NE or Division 2) in accordance with requirements found in referenced specifications, drawings, and codes in force at the time of construction. The descriptions for Class CC given in Paragraph 5.5 were established and reviewed by Dominion based on containment function and scope found in the UFSAR, currently applicable ASME Code sections and the original design/construction specifications and drawings.

Page 5 of 28

Serial No. 07-01 18 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115107) 5.0 CONTAINMENT IWE INSERVICE INSPECTION 5.1 Contents of Containment IWE Inservice Inspection Plan The Containment IWE Inservice Inspection Plan addresses the requirements for the inservice inspection of primary containment components to satisfy the mandatory regulations of 10CFR50.55a. Where other regulatory requirements or specific North Anna/Surry commitments impose additional examinations or NDE techniques exceeding Code requirements, these augmented requirements will be addressed in the Containment IS1 Implementation Schedule specific to each unit.

The intent of this document is to provide information regarding the scope of the Containment IS1 Plan, and to provide references to other documents and programs that form a part of the Containment IS1 Plan, or provide supporting information, and identify applicable exemptions and relief requests.

5.2 ASME Section XI Edition and Addenda Implemented The current regulatory requirement mandated by 10CFR50.55a requires licensees to implement a containment inspection program in accordance with the rules and requirements of the 2001 Edition through the 2003 Addenda of ASME Section XI, Subsections IWE amended in the regulation. Dominion will implement this Containment IWE IS1 Plan in accordance with the rules and requirements of the 200 1 Edition through the 2003 Addenda of ASME Section XI, Subsections IWE as amended in the regulation.

5.3 Containment IWE IS1 First Interval In accordance with the regulatory requirements of 10CFR50.55a, the examinations performed during the first period of the first inspection interval served the same purpose for operating plants as the preservice examination specified for plants not yet in operation. The North Anna and Surry containments were not designed to accommodate inspections. There were no regulatory requirements to implement Subsection IWE of ASME Section XI prior to North Anna and Surry commencing operations. The CFR allowed up to five years for the implementation of the first period inspections. In consideration of these rules, the Initial Period (First Period) for the performance of Containment IS1 began on September 9, 1996, and ended at the completion of the last required first period examination for each unit. As these dates differed for each unit, the second period and third period dates varied for each unit. The subsequent periods complied with the normal period requirements of four years for the second period and three years for the third period of inspection program B of ASME Section XI.

Page 6 of 28

Serial No. 07-0 118 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (0211.5107) 5.4 Containment IWE IS1 Second Interval North Anna Unit 1 - 10/07/2007 to 03/14/2017 North Anna Unit 2 - 10/12/2008 to 0311912018 Surry Unit 1 - 11/22/2007 to 04/25/20 17 Surry Unit 2 - 05/22/2008 to 1011W O l 7 5.5 IS1 Primary Containment Boundaries and Classification ASME Class 1 , 2 and 3 piping penetrating the containment vessel is attached to the containment vessel directly by welding, or via flued heads and sleeves. The process pipe to liner weld, the flued head to the sleeve weld and the process pipe weld to sleeve or flued head is considered part of the containment vessel (IWE, Class CC).

5.5.2 ASME Class CC The entire metal shelllliner of the containment structure and connecting penetrations, appurtenances, and parts, which form the containment leak tight boundary. This class shall be inspected per the requirements of ASME Subsection IWE Table IWE-2500-1 as modified by 10CFR50.55a, Code Cases, and Relief Requests approved by the NRC as documented in this plan.

5.6 Containment IWE IS1 Schedule 5.6.1 Examination Schedule - IWE Scope ASME Section XI, Subarticle IWE-2400, allows the owner to choose between two implementation schedules. These are identified as Inspection Program A and Inspection Program B. North Anna and Surry will implement Inspection Program B to be consistent with the existing IS1 Program for Class 1 , 2 and 3 components and supports. Program B consists of a Ten-Year Inspection Interval subdivided into three inspection periods. Table IWE-24 12-1 identifies the duration of each inspection period, the minimum percentage of exams required, and the maximum percentage of examinations that can be credited within each period as follows:

Page 7 of 28

Serial No. 07-01 18 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115/07)

Inspection Inspection Period Minimum Maximum Interval (Calendar Years of Examinations Examinations (10 Years) Plant Service Within Required Credited the Interval) (%) (%)

2 3 16 50 7 50 75 10 100 100 5.7 Containment IWE Components Exempt From Examination 5.7.1 Per Subarticle IWE-1220 the following components (or parts of components) are exempted from the examination requirements of IWE-Vessels, parts and appurtenances outside the boundaries of the containment as defined in the Design Specification.

Embedded or inaccessible portions of containment vessels, parts and appurtenances that met the requirements of the original Construction Code.

Portions of containment vessels, parts and appurtenances that become embedded or inaccessible as a result of vessel repairlreplacement activities if the requirements of Subarticles IWE-1232(a) and (b) and IWE-5220 are met.

Piping, pumps and valves that are part of the containment system, or which penetrate or are attached to the containment vessel.

These components shall be examined in accordance with the requirements of Subsections IWB or IWC, as applicable.

5.7.2 Specific exemptions and identification of inaccessible areas will be detailed in the Containment IS1 Implementation Schedule for North Anna and Surry. The definition of "inaccessible" is given in Section 3.0.

5.8 Containment IWE IS1 Implementation Schedule Containment IWE IS1 Implementation Schedules have been developed for North Anna and Surry in accordance with the Dominion Insewice Inspection Manual.

These Implementation Schedules identify the components to be examined during the IS1 interval and each period in accordance with the schedule requirements of Subsection IWE.

Page 8 of 28

Serial No. 07-0 118 Docket Nos. 50-280/28 1 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115107)

The Implementation Schedule will include detailed information as to the implementation of examinations in order to satisfy the mandated containment inspection rules. This will include itemization of components by category and item number, examination methods, Relief Requests, reference to drawings, and identification of components (or portions of components) that are inaccessible.

5.9 Repair and Replacement of Primary Containment Components RepairIReplacement and Modification activities for items within the scope of IWE are to be performed in accordance with the ASME Section XI RepairIReplacement program.

5.10 Acceptance Standards Acceptance of components for continued service shall be subject to the rules of Article IWE-3000. If examination results require evaluation, the evaluation shall be performed in accordance with Article IWE-3000 and the regulatory amendments per 10CFR50.55a.

5.10.1 Evaluation of Items Within the Scope of IWE (10 CFR 50.55a(b)(ix)(A))

5.10.1.1 When degradation is identified, which exceeds acceptance standards, Dominion will evaluate the acceptability of inaccessible areas when conditions exist in accessible areas that could indicate the presence of or result in degradation to such inaccessible area identified. For each inaccessible area identified the following information shall be reported with the Summary Report:

(a) A description of the type and estimated extent of degradation, and the conditions that led to the degradation.

(b) An evaluation of each area, and the result of the evaluation, and (c) A description of the necessary corrective actions.

The reports required by this Plan shall be submitted within 90 days of the completion of the refueling outage in which the condition was identified. The end of the refueling outage is defined as when the unit is placed on-line.

Page 9 of 28

Serial No. 07-0 1 1 8 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02/15/07) 5.1 1 Containment IWE IS1 Drawings Containment IWE IS1 drawings show the containment in developed elevations.

These drawings (IWE Series) are utilized to identify and locate the areas requiring examination. A list of the IWE Series drawings is included in Attachment 1.

Existing controlled plant design and component drawings will be used as required to identify and perform examinations on items such as bolting. These drawings provide details of individual components such as hatches and penetrations, which are not shown on the Containment IS1 drawings.

5.12 Containment IWE IS1 Implementation Procedures The Dominion procedures required for implementation of containment inservice inspections, referenced in Paragraph 2.3, are considered part of this Containment IWE IS1 Plan. 10 CFR 50.55a(b)(ix)(B) states when performing remotely the visual exams required by Subsection IWE, the maximum direct examination distance in Table-22 10-1 may be extended and the minimum illumination requirements specified in Table IWA-2210- 1 may be decreased provided that the conditions or indications for which the visual examination is performed can be detected at the chosen distance and illumination.

5.13 ASME Section XI Key Personnel Requirements 5.13.1 Responsible Individual IWE-2320 requires a Responsible Individual, knowledgeable in the requirements for design, inservice inspection, and testing of Class MC and metallic liners of Class CC components. Dominion's Responsible Individual shall be one of the following:

a) The visual (VT-1, VT-2, VT-3) Principal Level 111, or b) As designated by Dominion.

5.13.2 The Responsible Individual shall be responsible for the following:

(a) development of plans and procedures for examination of containment surfaces; (b) instruction, training, and approval of visual examination personnel; (c) performance or direction of general and detailed visual examinations; (d) evaluation of examination results; and (e) submittal of report to Dominion documenting results of examinations.

Page 10 of 28

Serial No. 07-0 1 18 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115/07) 5.13.3 VT-1 and VT-3 Examiners (10 CFR 50.55a(b)(ix)(F))

VT-1 and VT-3 examinations shall be conducted in accordance with IWA-2200 of ASME Section XI. Personnel conducting examinations in accordance with the VT-1 or VT-3 examination method shall be qualified in accordance with IWA-2300 of ASME Section XI and not to an "owner defined" program discussed in IWE-2330(a) of ASME Section XI.

5.13.4 General and Detailed Examiners (a) Personnel performing General Examinations shall be qualified to visual, VT-3, level 2 or higher in accordance with IWA-2300.

(b) Personnel performing Detailed Examinations shall be qualified to visual, VT-1, level 2 or higher in accordance with IWA-2300. The only exception will be Detailed Examinations required by IWE-5240 associated with the pressure tests of IWE-5220 following repair/replacement activities. Personnel performing Detailed Examinations required by IWE-5240 shall be qualified to visual, VT-2, level 2 or higher in accordance with IWA-2300.

6.0 CONTAINMENT IWE EXAMINATION SCOPE The following tables outline the scope of the examinations required to comply with regulatory requirements for the inspection of containments. These tables represent the requirements prescribed in Subsection IWE and where applicable, the regulatory amendments to the Code have been identified. Code Cases and Relief Requests are also referenced, including their status, for the affected containment items. These tables are intended to mirror the IWX-2500-1 Tables found in Section XI, except that they have been modified to specifically apply to Dominion. However, these tables are not a substitute for the Code tables. The Code tables must be consulted as they contain detailed information required for performance of examinations, which are not included here. As an example, the acceptance criteria identified for each Code item number in the Code tables is not identified in this document. However, the acceptance criteria would be followed except where specific written relief has been granted.

Page 11 of 28

Serial No. 07-0 1 18 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115107)

TABLE 1 IWE EXAMINATIONS EXAMINATION CATEGORY E-A, CONTAINMENT SURFACES Item Part Examination Extent & Frequency Code Relief Remarks No. Method of Examination Case Request Containment Vessel Pressure Retaining Boundary1 Accessible Surface General Visual 100% Each Period 10 CFR 50.55a(b)(ix)(H) requires that Areas / Visual, VT-3 containment bolted connections that are and VT- 1 disassembled during the performance of the (bolting) examinations of this item be examined using the VT-3 examination method. Flaws or degradation identified during the performance of a VT-3 examination must be examined in accordance with the VT- 1 examination method. The criteria in the material specification or IWB-35 17.1 must be used to evaluate containment bolting flaws or degradation. As an alternative to performing VT-3 examinations of containment bolted connections that are disassembled during the scheduled performance of Item E 1.11, VT-3 examinations of containment bolted connections may be conducted whenever containment bolted connections are disassembled for any reason.

Page 12 of 28

Serial No. 07-0 1 18 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115107)

E l . 12 I Wetted Surfaces of Visual, VT-3 I 100% Each Interval I I 10 CFR 50.55a(b)(ix)(G) requires VT-3 Submerged Areas examination method.

E 1.20 BWR Vent system2 N/A N/ A N/A N/A North Anna and Surry are PWRs, this Accessible surface I I I I item is not applicable.-

Areas El .30 Moisture ~ a r r i e r s ~ N/A N/A N/A N/A North Anna and Surry do not have I

1 moisture barriers.

Notes (1): Examination shall include all accessible interior and exterior surfaces of Class MC components, parts, and appurtenances,

- - and metallic shell and penetration liners of Class CC components. The following items shall be considered for examination:

(a) integral attachments and structures that are part of the reinforcing structure, such as stiffening rings, manhole frames, and reinforcement around openings.

(b) surfaces of attachment welds between structural attachments and the pressure retaining boundary or reinforcing structure, such as stiffening rings, manhole frames, and reinforcement around openings.

(c) surfaces of containment structural and pressure boundary welds, including longitudinal welds (Category A),

circumferential welds (Category B), flange welds (Category C), and nozzle-to-shell welds (Category D) as defined in NE-3351 for Class MC and CC-3840 for Class CC; and surfaces of Flued Head and Bellows Seal Circumferential Welds joined to the Penetration.

(d) pressure-retaining bolted connections, including bolts, studs, nuts bushings, washers, and threads in base material and flange ligaments between fastener holes. Bolted connections need not be disassembled for performance of examinations, and bolting may remain in place under tension.

(2) Not applicable (3) Not applicable Page 13 of 28

Serial No. 07-0 1 18 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115107)

EXAMINATION CATEGORY E-C, CONTAINMENT SURFACES REQUIRING AUGMENTED EXAMINATION Item Part Examination Extent & Frequency Code Relief Remarks No. Method of Examination Case Request Containment Surface Areas1 E4.11 Visible Surfaces Visual, VT-1 100% of Identified 10 CFR 50.55a(b)(ix)(G) requires VT-1 Areas examination method.

Each Period E4.12 Surface Area Grid Volumetric 100% of Identified IWE-2500(b)(l), (2), (3), (4) describe Minimum Wall Areas the minimum requirements for the Thickness Location Each Period examination. 10 CFR 50.55a(b)(ix)(I) requires the ultrasonic examination acceptance standard specified in IWE-35 11.3 for Class MC pressure-retaining components must also be applied to metallic liners of Class CC pressure-I I J I retaining components.

Note (1 Containment surface areas requiring augmented examination are those identified in IWI 1240. Currently only North Anna Unit 2 has identified areas for aurrmented ins~ectionassociated with r e ~ a i r ~erforrned s during: 1999 refueling-.

Page 14 of 28

Serial No. 07-0 1 18 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115107) 7.0 CODE CASES Any Code Case to be utilized in this Plan will require submittal and approval as a Relief Request or be generically approved through Regulatory Guide 1.147 and added to this Plan. At this time, no Code Cases have been specifically adopted for the IWE programs.

8.0 RELIEF REQUESTS None Page 15 of 28

Serial No. 07-0 1 1 8 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115/07) 9.0 INSPECTION PLAN SUMMARIES 9.1 North Anna Power Station Unit 1 Page 16 of 28

Serial No. 07-01 18 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115107)

NORTH ANNA POWER STATION UNIT 1 IWE Plan Per Category, Item No., and PeriodIIntewal Category E-A, Containment Surfaces Item No. Period Locations to be Planned Actual e~amined'.~ completion completion percentage percentage El.ll 1 Note (3) 100% -

El.11 2 Note (3) 100% -

El.ll 3 Note (3) 100% -

E l . 12 3 Note (3) 100% -

No other categories or item numbers are applicable to the unit.

1) The total locations to be examined are a combination of component mark numbers and unique drawings for individual components. For example the containment liner has one mark number but many drawings indicating areas to be examined. Each of the unique location drawings is listed in the IS1 Implementation Schedule for the liner component mark number.
2) Only drawings that indicate location of a component are listed in the IS1 Implementation Schedule. "Typical," general note and location schedule drawings, which are part of the IWE/IWL drawing series, are not listed. These drawings may be used by an examiner as an inspection aid only, and can be identified from the location drawing found in the IS1 Implementation Schedule or by using the drawing series itself.
3) Total number of locations to be examined will be added upon completion of the Containment IS1 Implementation Schedule.

Page 17 of 28

Serial No. 07-0 118 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115/07) 9.2 North Anna Power Station Unit 2 Page 18 of 28

Serial No. 07-0 1 18 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115107)

NORTH ANNA POWER STATION UNIT 2 IWE Plan Per Category, Item No., and PeriodJInterval Category E-A, Containment Surfaces Item No. Period Locations to be Planned Actual e~amined"~ completion completion percentage percentage El.ll 1 Note (4) 100% -

El.ll 2 Note (4) 100% -

El.ll 3 Note (4) 100% -

E1.12 3 Note (4) 100%

Category E-C, Containment Surfaces requiring Augmented Examination Item No. Period I locations to be I Planned Actual e~amined'.~ completion completion percentage3 percentage E4.11 1 Note (4) 100% -

E4.11 2 Note (4) 100% -

E4.11 3 Note (4) 100% -

E4.12 1 Note (4) 100% -

E4.12 2 Note (4) 100% -

E4.12 3 Note (4) 100% -

No other categories or item numbers are applicable to the unit.

The total locations to be examined are a combination of component mark numbers and unique drawings for individual components. For example the containment liner has one mark number but many drawings indicating areas to be examined. Each of the unique location drawings is listed in the IS1 Implementation Schedule for the liner component mark number.

Only drawings that indicate location of a component are listed in the IS1 Implementation Schedule. "Typical," general note and location schedule drawings, which are part of the IWEIIWL drawing series, are not listed. These drawings may be used by an examiner as an inspection aid only, and can be identified from the location drawing found in the IS1 Implementation Schedule or by using the drawing series itself.

The extent of examination shall be 100% for each inspection period until the areas examined remain essentially unchanged for the next inspection period. Such areas no longer require augmented examination.

Total number of locations to be examined will be added upon completion of the Containment IS1 Implementation Schedule.

Page 19 of 28

Serial No. 07-0 118 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115107) 9.3 Surry Power Station Unit 1 Page 20 of 28

Serial No. 07-0 1 18 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115107)

SURRY POWER STATION UNIT 1 IWE Plan Per Category, Item No., and PeriodIInterval Category E-A, Containment Surfaces Item No. Period Locations to be Planned Actual e~amined"~ completion completion percentage percentage E1.11 1 Note (3) 100% -

El.ll 2 Note (3) 100% -

El.ll 3 Note (3) 100% -

E1.12 3 Note (3) 100%

No other categories or item numbers are applicable to the unit.

1) The total locations to be examined are a combination of component mark numbers and unique drawings for individual components. For example the containment liner has one mark number but many drawings indicating areas to be examined. Each of the unique location drawings is listed in the IS1 Implementation Schedule for the liner component mark number.
2) Only drawings that indicate location of a component are listed in the IS1 Implementation Schedule. "Typical," general note and location schedule drawings, which are part of the IWEJIWL drawing series, are not listed. These drawings may be used by an examiner as an inspection aid only, and can be identified from the location drawing found in the IS1 Implementation Schedule or by using the drawing series itself.
3) Total number of locations to be examined will be added upon completion of the Containment IS1 Implementation Schedule.

Page 2 1 of 28

Serial No. 07-0 1 18 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (0211.5107) 9.4 Surry Power Station Unit 2 Page 22 of 28

Serial No. 07-01 18 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115107)

SURRY POWER STATION UNIT 2 IWE Plan Per Category, Item No., and Period/Interval Category E-A, Containment Surfaces Item No. Period Locations to be Planned Actual examined completion completion percentage percentage El.ll 1 Note ( 3 ) 100% -

El.ll 2 Note ( 3 ) 100% -

El.ll 3 Note (3) 100% -

I E1.12 3 Note (3) 100% -

No other categories or item numbers are applicable to the unit.

1) The total locations to be examined are a combination of component mark numbers and unique drawings for individual components. For example the containment liner has one mark number but many drawings indicating areas to be examined. Each of the unique location drawings is listed in the IS1 Implementation Schedule for the liner component mark number.

2 ) Only drawings that indicate location of a component are listed in the IS1 Implementation Schedule. "Typical," general note and location schedule drawings, which are part of the IWEIIWL drawing series, are not listed. These drawings may be used by an examiner as an inspection aid only, and can be identified from the location drawing found in the IS1 Implementation Schedule or by using the drawing series itself.

3) Total number of locations to be examined will be added upon completion of the Containment IS1 Implementation Schedule.

Page 23 of 28

Serial No. 07-01 18 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115/07)

Attachment 1 IWE Drawings by StationJUnit North Anna Unit 1 IWE Drawings GENERAL NOTES, REFERENCES AND LINER SCHEDULES TYPICAL CONTAINMENT CROSS SECTION IWE INSPECTION FIGURE DETAILS - SH 1 IWE INSPECTION FIGURE DETAILS - SH 2 IWE INSPECTION FIGURE DETAILS - SH 3 IWE INSPECTION FIGURE DETAILS - SH 4 IWE INSPECTION FIGURE DETAILS - SH 5 IWE INSPECTION FIGURE DETAILS - SH 6 IWE INSPECTION FIGURE DETAILS - SH 7 IWE INSPECTION FIGURE DETAILS - SH 8 DOME LINER SEGMENT LOCATION SCHEDULE LINER SEGMENT - DOME BETWEEN AZ. 0" & 90" LINER SEGMENT - DOME BETWEEN AZ. 90" & 180" LINER SEGMENT - DOME BETWEEN AZ. 180" & 270" LINER SEGMENT - DOME BETWEEN AZ. 270" & 0" MAT LINER SEGMENT LOCATION SCHEDULE LINER SEGMENT - BASE MAT BETWEEN AZ. 0" & 90' LINER SEGMENT - BASE MAT BETWEEN AZ. 90" & 1SO0 LINER SEGMENT - BASE MAT BETWEEN AZ. 180" & 270" LINER SEGMENT - BASE MAT BETWEEN AZ. 270" & 0" WALL LINER SEGMENT LOCATION SCHEDULE LINER SEGMENT - BETWEEN COL. 1 & 3 AT ELEV. 216'-11" LINER SEGMENT - BETWEEN COL. 3 & 5 AT ELEV. 216'-11" LINER SEGMENT - BETWEEN COL. 5 & 7 AT ELEV. 216'-11" LINER SEGMENT - BETWEEN COL. 7 & 9 AT ELEV. 216'-11" LINER SEGMENT - BETWEEN COL. 9 & 1 1 AT ELEV. 216'-11" LINER SEGMENT - BETWEEN COL. 11 & 13 AT ELEV. 2 16'-11" LINER SEGMENT - BETWEEN COL. 13 & 15 AT ELEV. 2 16'-1 1" LINER SEGMENT - BETWEEN COL. 15 & 17 AT ELEV. 2 16'-1 1" LINER SEGMENT - BETWEEN COL. 17 & 1 AT ELEV. 2 16'-1 1" LINER SEGMENT - BETWEEN COL. 1 & 3 AT ELEV. 241'-0" LINER SEGMENT - BETWEEN COL. 3 & 5 AT ELEV. 241'-0" LINER SEGMENT - BETWEEN COL. 5 & 7 AT ELEV. 241'-0" LINER SEGMENT - BETWEEN COL. 7 & 8 AT ELEV. 241'-0" LINER SEGMENT - BETWEEN COL. 8 & 9 AT ELEV. 241'-0" LINER SEGMENT - BETWEEN COL. 9 & 11 AT ELEV. 241'-0" LINER SEGMENT - BETWEEN COL. 11 & 13 AT ELEV. 241'-0" LINER SEGMENT - BETWEEN COL. 13 & 15 AT ELEV. 241'-0" LINER SEGMENT - BETWEEN COL. 15 & 17 AT ELEV. 241'-0" LINER SEGMENT - BETWEEN COL. 17 & 1 AT ELEV. 24 1'-0" LINER SEGMENT - BETWEEN COL. 1 & 3 AT ELEV. 262'-10" LINER SEGMENT - BETWEEN COL. 3 & 5 AT ELEV. 262'-10" Page 24 of 28

Serial No. 07-0118 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115/07)

North Anna Unit 1 IWE Drawings (Continued)

LINER SEGMENT - BETWEEN COL. 5 & 7 AT ELEV. 262'- 10" LINER SEGMENT - BETWEEN COL. 7 & 8 AT ELEV. 262'-10" LINER SEGMENT - BETWEEN COL. 8 & 9 AT ELEV. 262'-10" LINER SEGMENT - BETWEEN COL. 9 & 11 AT ELEV. 262'-10" LINER SEGMENT - BETWEEN COL. 11 & 13 AT ELEV. 262'- 10" LINER SEGMENT - BETWEEN COL. 13 & 15 AT ELEV. 262'-10" LINER SEGMENT - BETWEEN COL. 15 & 17 AT ELEV. 262'-10" LINER SEGMENT - BETWEEN COL. 17 & 1 AT ELEV. 262'- 10" LINER SEGMENT - BETWEEN AZ. 0" & 90" AT ELEV. 29 1'- 10" LINER SEGMENT - BETWEEN AZ. 90" & 180" AT ELEV. 291'-10" LINER SEGMENT - BETWEEN AZ. 180" & 270" AT ELEV. 291'-10" LINER SEGMENT - BETWEEN AZ. 270' & 0" AT ELEV. 29 1'-10" North Anna Unit 2 IWE Drawings GENERAL NOTES, REFERENCES AND LINER SCHEDULES TYPICAL CONTAINMENT CROSS SECTION IWE INSPECTION FIGURE DETAILS - SH 1 IWE INSPECTION FIGURE DETAILS - SH 2 IWE INSPECTION FIGURE DETAILS - SH 3 IWE INSPECTION FIGURE DETAILS - SH 4 IWE INSPECTION FIGURE DETAILS - SH 5 IWE INSPECTION FIGURE DETAILS - SH 6 IWE INSPECTION FIGURE DETAILS - SH 7 IWE INSPECTION FIGURE DETAILS - SH 8 DOME LINER SEGMENT LOCATION SCHEDULE LINER SEGMENT - DOME BETWEEN AZ. 0" & 90" LINER SEGMENT - DOME BETWEEN AZ. 90" & 180" LINER SEGMENT - DOME BETWEEN AZ. 180" & 270" LINER SEGMENT - DOME BETWEEN AZ. 270" & 0" MAT LINER SEGMENT LOCATION SCHEDULE LINER SEGMENT - BASE MAT BETWEEN AZ. 0" & 90" LINER SEGMENT - BASE MAT BETWEEN AZ. 90" & 180" LINER SEGMENT - BASE MAT BETWEEN AZ. 180" & 270" LINER SEGMENT - BASE MAT BETWEEN AZ. 270" & 0" WALL LINER SEGMENT LOCATION SCHEDULE LINER SEGMENT - BETWEEN COL. 1 & 3 AT ELEV. 2 16'-11" LINER SEGMENT - BETWEEN COL. 3 & 5 AT ELEV. 2 16'-11" LINER SEGMENT - BETWEEN COL. 5 & 7 AT ELEV. 2 16'-11" LINER SEGMENT - BETWEEN COL. 7 & 9 AT ELEV. 2 16'-11" LINER SEGMENT - BETWEEN COL. 9 & 11 AT ELEV. 216'-11" LINER SEGMENT - BETWEEN COL. 11 & 13 AT ELEV. 2 16'-11" LINER SEGMENT - BETWEEN COL. 13 & 15 AT ELEV. 2 16'- 11" LINER SEGMENT - BETWEEN COL. 15 & 17 AT ELEV. 2 16'-11" LINER SEGMENT - BETWEEN COL. 17 & 1 AT ELEV. 21 6'-11" LINER SEGMENT - BETWEEN COL. 1 & 3 AT ELEV. 241'-0" Page 25 of 28

Serial No. 07-0118 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115107)

North Anna Unit 2 IWE Drawings (Continued)

LINER SEGMENT - BETWEEN COL. 3 & 5 AT ELEV. 241'-0" LINER SEGMENT - BETWEEN COL. 5 & 7 AT ELEV. 241'-0" LINER SEGMENT - BETWEEN COL. 7 & 9 AT ELEV. 241'-0" LINER SEGMENT - BETWEEN COL. 9 & 10 AT ELEV. 241'-0" LINER SEGMENT - BETWEEN COL. 10 & 11 AT ELEV. 241'-0" LINER SEGMENT - BETWEEN COL. 11 & 13 AT ELEV. 241'-0" LINER SEGMENT - BETWEEN COL. 13 & 15 AT ELEV. 241'-0" LINER SEGMENT - BETWEEN COL. 15 & 17 AT ELEV. 241'-0" LINER SEGMENT - BETWEEN COL. 1 & 3 AT ELEV. 262'-10" LINER SEGMENT - BETWEEN COL. 3 & 5 AT ELEV. 262'- 10" LINER SEGMENT - BETWEEN COL. 5 & 7 AT ELEV. 262'-10" LINER SEGMENT - BETWEEN COL. 7 & 9 AT ELEV. 262'- 10" LINER SEGMENT - BETWEEN COL. 9 & 10 AT ELEV. 259'-6" LINER SEGMENT - BETWEEN COL. 10 & 11 AT ELEV. 259'-6" LINER SEGMENT - BETWEEN COL. 11 & 13 AT ELEV. 259' 6" & 262'-10" LINER SEGMENT - BETWEEN COL. 13 & 15 AT ELEV. 262'-10" LINER SEGMENT - BETWEEN COL. 15 & 1 AT ELEV. 262'-10" LINER SEGMENT - BETWEEN AZ. 0" & 90" AT ELEV. 291'-10" LINER SEGMENT - BETWEEN AZ. 90" & 180" AT ELEV. 291'-10" LINER SEGMENT - BETWEEN AZ. 180" & 270" AT ELEV. 291'-10" LINER SEGMENT - BETWEEN AZ. 270" & 0" AT ELEV. 29 1'-10" Surry Unit 1 IWE Drawings GENERAL NOTES, REFERENCES AND LINER SCHEDULES TYPICAL CONTAINMENT CROSS SECTION IWE INSPECTION FIGURE DETAILS - SH 1 IWE INSPECTION FIGURE DETAILS - SH 2 IWE INSPECTION FIGURE DETAILS - SH 3 IWE INSPECTION FIGURE DETAILS - SH 4 IWE INSPECTION FIGURE DETAILS - SH 5 IWE INSPECTION FIGURE DETAILS - SH 6 IWE INSPECTION FIGURE DETAILS - SH 7 IWE INSPECTION FIGURE DETAILS - SH 8 DOME LINER SEGMENT LOCATION SCHEDULE LINER SEGMENT - DOME BETWEEN AZ. 0" & 90" LINER SEGMENT - DOME BETWEEN AZ. 90" & 180" LINER SEGMENT - DOME BETWEEN AZ. 180" & 270" LINER SEGMENT - DOME BETWEEN AZ. 270" & 0" MAT LINER SEGMENT LOCATION SCHEDULE LINER SEGMENT - BASE MAT BETWEEN AZ. 0" & 90" LINER SEGMENT - BASE MAT BETWEEN AZ. 90" & 180" LINER SEGMENT - BASE MAT BETWEEN AZ. 180" & 270" LINER SEGMENT - BASE MAT BETWEEN AZ. 270" & 0" WALL LINER SEGMENT LOCATION SCHEDULE LINER SEGMENT - BETWEEN COL. 1 & 3 AT ELEV. -27'-7" Page 26 of 28

Serial No. 07-01 18 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115107)

Surry Unit 1 IWE Drawings (Continued)

LINER SEGMENT - BETWEEN COL. 3 & 5 AT ELEV. -27'-7" LINER SEGMENT - BETWEEN COL. 5 & 7 AT ELEV. -27'-7" LINER SEGMENT - BETWEEN COL. 7 & 9 AT ELEV. -27'-7" LINER SEGMENT - BETWEEN COL. 9 & 11 AT ELEV. -27'-7" LINER SEGMENT - BETWEEN COL. 11 & 13 AT ELEV. -27'-7" LINER SEGMENT - BETWEEN COL. 13 & 15 AT ELEV. -27'-7" LINER SEGMENT - BETWEEN COL. 15 & 17 AT ELEV. -27'-7" LINER SEGMENT - BETWEEN COL. 17 & 1 AT ELEV. -27'-7" LINER SEGMENT - BETWEEN COL. 1 & 3 AT ELEV. -3'-6" LINER SEGMENT - BETWEEN COL. 3 & 5 AT ELEV. -3'-6" LINER SEGMENT - BETWEEN COL. 5 & 7 AT ELEV. -3'-6" LINER SEGMENT - BETWEEN COL. 7 & 8 AT ELEV. -3'-6" LINER SEGMENT - BETWEEN COL. 8 & 9 AT ELEV. -3'-6" LINER SEGMENT - BETWEEN COL. 9 & 11 AT ELEV. -3'-6" LINER SEGMENT - BETWEEN COL. 11 & 13 AT ELEV. -3'-6" LINER SEGMENT - BETWEEN COL. 13 & 15 AT ELEV. -3'-6" LINER SEGMENT - BETWEEN COL. 15 & 17 AT ELEV. -3'-6" LINER SEGMENT - BETWEEN COL. 17 & I AT ELEV. -3'-6" LINER SEGMENT - BETWEEN COL. 1 & 3 AT ELEV. 18'-4" LINER SEGMENT - BETWEEN COL. 3 & 5 AT ELEV. 18'-4" LINER SEGMENT - BETWEEN COL. 5 & 7 AT ELEV. 18'-4" LINER SEGMENT - BETWEEN COL. 7 & 8 AT ELEV. 18'-4" LINER SEGMENT - BETWEEN COL. 8 & 9 AT ELEV. 18'-4" LINER SEGMENT - BETWEEN COL. 9 & 11 AT ELEV. 18'-4" LINER SEGMENT - BETWEEN COL. l I & 13 AT ELEV. 18'-4" LINER SEGMENT - BETWEEN COL. 13 & 15 AT ELEV. 18'-4" LINER SEGMENT - BETWEEN COL. 15 & 17 AT ELEV. 18'-4" LINER SEGMENT - BETWEEN COL. 17 & 1 AT ELEV. 18'-4" LINER SEGMENT - BETWEEN AZ. 0" & 90' AT ELEV. 47'-4" LINER SEGMENT - BETWEEN AZ. 90" & 180" AT ELEV. 47'-4" LINER SEGMENT - BETWEEN AZ. 180" & 270' AT ELEV. 47'-4" LINER SEGMENT - BETWEEN AZ. 270" & 0" AT ELEV. 47'-4" Surry Unit 2 IWE Drawings GENERAL NOTES, REFERENCES AND LINER SCHEDULES TYPICAL CONTAINMENT CROSS SECTION IWE INSPECTION FIGURE DETAILS - SH 1 IWE INSPECTION FIGURE DETAILS - SH 2 IWE INSPECTION FIGURE DETAILS - SH 3 IWE INSPECTION FIGURE DETAILS - SH 4 IWE INSPECTION FIGURE DETAILS - SH 5 IWE INSPECTION FIGURE DETAILS - SH 6 IWE INSPECTION FIGURE DETAILS - SH 7 IWE INSPECTION FIGURE DETAILS - SH 8 DOME LINER SEGMENT LOCATION SCHEDULE Page 27 of 28

Serial No. 07-0 118 Docket Nos. 50-2801281 and 50-3381339 IWE Containment IS1 Plan, Rev. 0 (02115107)

Surry Unit 2 IWE Drawings (Continued)

LINER SEGMENT - DOME BETWEEN AZ. 0" & 90" LINER SEGMENT - DOME BETWEEN AZ. 90" & 180" LINER SEGMENT - DOME BETWEEN AZ. 180" & 270" LINER SEGMENT - DOME BETWEEN AZ. 270" & 0" MAT LINER SEGMENT LOCATION SCHEDULE LINER SEGMENT - BASE MAT BETWEEN AZ. 0" & 90" LINER SEGMENT - BASE MAT BETWEEN AZ. 90" & 180" LINER SEGMENT - BASE MAT BETWEEN AZ. 180" & 270" LINER SEGMENT - BASE MAT BETWEEN AZ. 270" & 0" WALL LINER SEGMENT LOCATION SCHEDULE LINER SEGMENT - BETWEEN COL. 1 & 3 AT ELEV. -27'-7" LINER SEGMENT - BETWEEN COL. 3 & 5 AT ELEV. -27'-7" LINER SEGMENT - BETWEEN COL. 5 & 7 AT ELEV. -27'-7" LINER SEGMENT - BETWEEN COL. 7 & 9 AT ELEV. -27'-7" LINER SEGMENT - BETWEEN COL. 9 & 11 AT ELEV. -27'-7" LINER SEGMENT - BETWEEN COL. 11 & 13 AT ELEV. -27'-7" LINER SEGMENT - BETWEEN COL. 13 & 15 AT ELEV. -27'-7" LINER SEGMENT - BETWEEN COL. 15 & 1 AT ELEV. -27'-7" LINER SEGMENT - BETWEEN COL. 1 & 3 AT ELEV. -3'-6" LINER SEGMENT - BETWEEN COL. 3 & 5 AT ELEV. -3'-6" LINER SEGMENT - BETWEEN COL. 5 & 7 AT ELEV. -3'-6" LINER SEGMENT - BETWEEN COL. 7 & 9 AT ELEV. -3'-6" LINER SEGMENT - BETWEEN COL. 9 & 10 AT ELEV. -3'-6" LINER SEGMENT - BETWEEN COL. 10 & 11 AT ELEV. -3'-6" LINER SEGMENT - BETWEEN COL. 1 1 & 13 AT ELEV. -3'-6" LINER SEGMENT - BETWEEN COL. 13 & 15 AT ELEV. -3'-6" LINER SEGMENT - BETWEEN COL. 15 & 1 AT ELEV. -3'-6" LINER SEGMENT - BETWEEN COL. 1 & 3 AT ELEV. 18'-4" LINER SEGMENT - BETWEEN COL. 3 & 5 AT ELEV. 18'-4" LINER SEGMENT - BETWEEN COL. 5 & 7 AT ELEV. 18'-4" LINER SEGMENT - BETWEEN COL. 7 & 9 AT ELEV. 18'-4" LINER SEGMENT - BETWEEN COL. 9 & 10 AT ELEV. 18'-4" LINER SEGMENT - BETWEEN COL. 10 & 11 AT ELEV. 18'-4" LINER SEGMENT - BETWEEN COL. 11 & 13 AT ELEV. 18'-4" LINER SEGMENT - BETWEEN COL. 13 & 15 AT ELEV. 18'-4" LINER SEGMENT - BETWEEN COL. 15 & 1 AT ELEV. 18'-4" LINER SEGMENT - BETWEEN AZ. 0" & 90" AT ELEV. 47'-4" LINER SEGMENT - BETWEEN AZ. 90" & 180" AT ELEV. 47'-4" LINER SEGMENT - BETWEEN AZ. 180" & 270" AT ELEV. 47'-4" 1 1548-IWE-W04-D LINER SEGMENT - BETWEEN AZ. 270" & 0" AT ELEV. 47'-4" Page 28 of 28