Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 September 3, 2020 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 Serial No.:
NRA/DEA:
Docket Nos.:
License Nos.:
REVISED LICENSE RENEWAL COMMITMENT SUPPLEMENT PRESSURIZER SURGE LINE WELDS INSPECTION FREQUENCY 20-049A RO 50-338/339 NPF-4/7 By letter dated March 26, 2020, Virginia Electric and Power Company (Dominion Energy Virginia) requested NRC approval to revise the North Anna Units 1 and 2 pressurizer surge line welds inspection frequency from once every 40 months to once per 10-year inspection interval for the fifth and sixth ISi intervals.
The attachment to the March 26, 2020 letter included the flaw tolerance evaluation for the North Anna Units 1 and 2 pressurizer surge line welds, which was prepared by Structural Integrity Associates, Inc. The purpose of this supplemental letter is to further assist the NRC staff in their review of Dominion Energy Virginia's commitment change request.
Accordingly, Attachments 1 and 2 provide the results of the last examinations performed on the Unit 1 and Unit 2 pressurizer surge line welds during refueling outages N1 R25 (Fall 2016) and N2R26 (Spring 2018), respectively. There were no reportable indications identified as a result of the examinations.
If you have any questions or require additional information, please contact Ms. Diane E.
Aitken at (804) 273-2694.
Respectfully, i,;(d.~f-6 Senior Vice President - Nuclear Operations and Fleet Performance Commitment made in this letter:
None Attachments:
- 1. N 1 R25 Unit 1 Pressurizer Surge Line Welds Examination Results
- 2. N2R26 Unit 2 Pressurizer Surge Line Welds Examination Results
Serial No. 20-049A Docket Nos. 50-338/339 Revised License Renewal Commitment Supplement Page 2 of 2 cc:
U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 NRC Senior Resident Inspector North Anna Power Station Mr. G. Edward Miller NRC Senior Project Manager - North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 E-3 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Vaughn Thomas NRC Project Manager-Surry U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 04 F-12 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Marcus Harris Old Dominion Electric Cooperative Innsbrook Corporate Center, Suite 300 4201 Dominion Boulevard Glen Allen, Virginia 23060 N1 R25 Unit 1 Pressurizer Surge Line Welds Examination Results Virginia Electric and Power Company (Dominion Energy Virginia)
North Anna Power Station Unit 1 Serial No.: 20-049A Docket No.: 50-338
Liquid Penetrant Examination Site/Unit:
NAPS Procedure:
ER-AA-NDE-PT-300 Outage No.:
N1R25 Summary No.:
N1.R1.11.310 Procedure Rev.:
7 Report No.:
PT-16-019 Workscope:
AUG Work Order No.:
59102983133 Page:
1 of 1
Code:
2004 Edition Cat./ltem:
R-A/R1.11 Location:
C Loop Drawing No.:
11715-WMKS-0109D
==
Description:==
r-,iozzle to Pipe System ID:
RC ---- - --------------=----------------------
Component ID: 11715-WMKS-0109D / 14-RC-10 / 37 Limitations:
None*
Light Meter Mfg.:
N/A Serial No.:
N/A Temp. Tool Mfg.:
ATKINS Serial No.:
07 Comparator Block Temp.:
Side A:
N/A
°F Side B:
N/A
°F Resolution:
Lo/Wo Locati~n:
N/A Surface Condition:
Cleaner Visible Ii(]
Penetrant Fluorescent 0 Remover Brand MAGNAFLUX MAGNAFLUX MAGNAFLUX Type SKC-S SKL-SP2 SKC-S Batch No.
13M12K 12A08K '
13M12K Time Evap.
5 Min Dwell 10 Min Evap.
1 Min Time Exam Started:
0120 Time Exam Completed:
Indication Loe Loe Diameter Length Type No.
L w
R/L N/A Comments:
Flashligh use as illumination and Character Resolution Card Dom-2016-0001
-Results:
NRI ~
RI 0 Percent Of Coverage Obtained > 90%:
Examiner Level Ill Odegard, Jeffrey D Examiner Level II Stevermer, Aaron J.
Other Level N/A N/A Liquid Penetrant Examination Eval D N/A Reviewed Previous Data:
Date Reviewer 9/17/2016 Wayne Thomas Lv Ill Date 9/17/2016 Date Site Review Dennis Strickland Lv II ANII Review fv Mat/Thickness:
ss / 1.3" Illumination:
N/A Surface Temp.: _ ___;_8_0 __ °F 0.044" Character Card Contour Ground Developer MAGNAFLUX Develop 0201
- Remarks N/A SKD-S2 13F19K 10 Min Date 9/18/2016 Date 9/22/2016 Date I
~,
~ Dominion' Site/Unit:
NAPS UT Calibration/Examination 1
Procedure:
FR-AA-NDE-I II-802 Outage No.:
N1R25 Summary No.:
N1.RU1.310 Procedure Rev.:
4 Report No.:
UT-16-064 Works cope:
AUG Work Order No.:
59102983133 Page:
of 4
Code:
2004 Edition Cat./ltem:
R-AJR1.11 Location:
C Loop Drawing No.:
11715-WMKS-0109D
==
Description:==
Nozzle to Pipe System ID:
RC Component ID: -::1":'.11:-1:-:5:-:.w=:M::-K::s:-.o=-1:-:o-:9=D-:,-:1-:-4_-:R:-::C:--1:-:o:-,:-:3::7:------------------------------------------------
Size/Length:
1.2" / 44.0" Thickness/Diameter:
1.25" / 14.0" Limitations:
Limited on nozzle side, see attached.
Start Time:
0211 Finish Time:
0243 Instrument Settings Search Unit Cal.
Axial Oriented Search Unit Time Date Serial No.:
140723507 Serial No.:
00H45N Checks Calibration Signal Sweep
, Initial Cal.
Sound Path Manufacturer:
Olympus Manufacturer:
KBA 0001 9/17/2016 Reflector Amplitude%
Division Model:
EPOCH 600 Linearity:
L-16-020 Size:
0.50" Model:
Comp-G Inter. Cal.
0211 6/17/2016 1.5" Notch I 81%
5.3 2.111""
Delay:
6.567 µs Range:
4.000" Freq.:
2.25 MHZ Center Freq.:
N/A Inter. Cal.
NIA I
M'tl CalNel:
0.1237 in/µs Pulser:
Sqaure Inter. Cal.
0243 9/17/2016 Exam Angle:
45° Squint Angle:
N/A Final Cal.
0350 9/17/2016 I
Damping:
4000 Reject:
0%
Measured Angle:
.45° Mode:
Shear Rep. Rate:
Auto Freq.:
2.25 Mhz Couplant Exit Point 0.4"
- of Elements:
1 Filter:
0.5 -4.0 Mhz Mode:
Fullwave
-- Cal. Batch:
12J066 Circumferential Oriented Search Unit Config.:
Single Focus:
NIA Voltage:
400 Other:
N/A Type:
Sonotech Calibration Signal Swt:ep Sound Path Shape:
Round Contour:
N/A Mfg.:
SONOTECH Reflector Amplitude%
Division Wedge Style:
MSWQC NIA Ax. Gain (dB):
10.0 Circ. Gain (dB):
NIA Exam Batch:
12J066 Search Unit Cable 10 Screen Div.=
4.0 in. of Sound Path Type:
Sonotech Type:
RG 174 Length: 6" No. Conn.: o Mfg.:
SONOTECH Calibration Block Scan Coverage Cal. Block No.
10876 Upstream ~ Downstream ~ Scan dB: 28.0 Reference Block Reference/Simulator Block Thickness 2.25" Dia.:
0 Gain Signal Sweep Sound Path
. cw~
CCW~ Scan dB:* 28.0 Serial No.:
05-6535 dB Reflector Amplitude% Division Cal. Blk. Temp.
70° Temp. Tool:
07 Type:
SS Rompus Block 10.0 FSDH 16%
2.6 1.073" Ex<1m Surface:
OD Comp. Temp.
so* Temp. Tool:
07 C:.11..f':llf"O ('nr,r{itjnr,
- Ground No~
Ultrasonic Indication Report.)
Results:
NRI ~
RID Geom O Comments: None Percent Of Coverage Obtained> 90%:
Examiner Level 11-PDI Stevermer, Aaron J.
Examiner NIA Other NIA Level NIA Level N/A UT Calibration/Examination Yes
'Reviewed Previous Data:
Signature Yes Date I Reviewer 9/17/2016 Wayne Thomas Lv Ill Date I Sile Review Dennis Strickland Lv II Date I ANII Review N/A Date 9/22/20116 Date 9/22/2016 Date
~l
- ,,p Dominion' Site/Unit
NAPS UT Calibration/Examination 1
Procedure:
ER-AA-NDE-UT-802 Outage No.:
N1 R25 Summary No.:
N1.R1.11.310 Procedure Rev.:
4 Report No.:
UT-16-064 Workscope:
AUG Work Order No.:
59102983133 Page:
2 of 4
Code:
2004 Edition Cat./ltem:
R-A/R1.11 Location:
C Loop Drawing No.:
11715-WMKS-0109D
==
Description:==
Nozzle to Pipe System ID:
RC -----------------------------------------------------------------
Component ID: 11715-WMKS-0109D / 14-RC-10 / 37 Size/Length:
1.2" / 44.0" Thickness/Diameter:
1.25'" / 14.0" Limitations:
Limited on nozzle side, see a'ttached.
Start Time:
0244 Finish Time:
0306 Instrument Settings Search IJnit Cal.
Time Date Axial Oriented Search Unit Serial No.:
140723507 Serial No.:
O0F1DF Checks Calibration Signal Sweep Initial Cal.
Sound Path Ma*nufacturer:
Olympus Manufacturer:
KBA 0010* 9/17/2016 Reflector Amplitude%
Division Model:
EPOCH 600 Linearity:
L-16-020 Siz~:
0.50" Model:
Comp-G Inter. Cal.
0244 9/17/2016 1.5" Notch 82%
5.4 2.704" I
Inter. Cal.
N/A Delay:
8.200 µs Range:
5.00" Freq.:
2.25 MHZ Center Freq.:
2.25 Mhz Inter. Cal.
0306 9/17/2016 M'tl CalNel:
0.1237 in/µs Pulser:
Square Exam Angle:
so*
Squint Angle:
N/A Final Cal.
0352 9/17/2016 Damping:
400 0 Reject:
0%
Measured Angle:
so*
Mode:
Shear Couplant Rep. Rate:
Auto Freq.:
2.25 Mhz Exit Point C.45"
- of Elements:
1 Filter:
. 0.5 - 4.0 Mhz Mode:
Fullwave
-- Cal. Batch:
12J066 Circumferential Oriented Search Unit Config.:
Single Focus:
. NA Voltage:
400 Other:
N/A Type:
Sonotech Calibration Signal Sweep Sound Path Shape:
Round Contour:
N/A Reflector Amplitude%
Division Mfg.:
SONOTECH Wedge Style:
MSWQC N/A Ax. Gain (dB):
30.5 Circ. Gain (dB):
N/A Exam Batch:
12J066 Search Unit Cable 10 Screen Div. =
5.0 in. of Sound Path No. Conn.: O
- Type:
Sonotech Type:
RG 174 Length: 6' Mfg.:
SONOTECH Calibration Block Scan Coverage Cal. Block No.
10876 I
Reference Block Reference/Simulator Block lJps(ream ~ Downstream~ Scan dB: __:!i.:.:_
Gain Signal Sweep Sound Path Thickness 2.25" Dia.:
0 cw CCWO Scan dB: N/A Serial No.:
05-6535 dB Reflector Amplitude% Division Cal. Blk. Temp.
70° Temp. Tool:
07 SS Rompus Block Exam Surface:
OD Type:
30.5 NSDH 86%
1.4 0.693" Comp. Temp.
ao*
Temp. Tool:
07 Surface Condition:
Ground Recordable lndication(s):
Yes O No~
(lfYes, Ref. Altached Ultrasonic Indication Report.)
Results:
NRI ~
RI n Geom D Comments: None Percent Of Coverage Obtained > 90%:
Examiner Level 11-PDI Stevermer, Aaron J.
Examiner N/A Other N/A Level N/A Level N/A UT Calibration/Examination Yes Reviewed Previous Data:
Signc1ture Yes Date I Reviewer 9/17/2016 Wayne Thomas Lv Ill Date I Site Review Dennis Strickland Lv II Date I ANII Review N/A Date 9/22/2016 Date 9/22/2016 Date
~
~~
~~ Dominion' Supplemental Report Report No.:
Page:
UT-16-064 3
of 4
Summary No.: N1.R1.11.310
=~--:-----
Examiner: Stevermer, Aaron J. ~
Level:
11-PDI Reviewer: i.J.L. ~-" ~ s
(..e',J 1Ii- ~-
Date: ~-2.'Z*IL Examiner: _N_/.;...A'----------------
Level:
NIA Site Review:~~~ P
.. ~Dl.."u ~
Date: q{2:r../u,.,
Other: _N_/_A _____________ _
Level:
N/A ANII Review:
N/A Date:
Comments:
Ff--oMJ.
Sketch or Photo:
t-P,~
tJ<>z..
,.u.. *
\\. '3'-.
I. 3'5" I. "Z..~ **
- t, 1..S" Additional - Supplemental Data
~
~
',t,;il,*** Dominion" Report No: UT-16-064 Summary# Nl.Rl.11.310 Pg. 4 of 4
Prepared by: W. Thomas~,_,v'![C..
Date:
9/22/2016 Weld Number Thickness 37 Weld Length Weld Width 44" 1.25" 1.2" 0.417' HT X 1, 1" WIDTH* 0.458SQ. IN. a TOTAL VOLUME REQUIRED EACH SIDE CF WELD
~
EXAMINED 100% OF REQUIRED VOLUME OS SIDE
~
EXAM LIMITED US SIDE AX DIRECTION FOR 0.02 SQ. IN.
DUE TO NOZZLE CONFIGURATION
.02/.459 = 0.04 X 100 = 4%
~
NED 96% CF THE REOIJIRED VOLUME US SIDE /lJf. DIRECTION Examination Volume Dimensions -
Height 0.417" Length 44" Width Coverage Summary Required Scans (each has a weighing factor of 100 for complete coverage)
ANGLE UpSt-Ax UpSt-Circ DnSt-Ax DnSt-Circ 45/60 96%
100%
100%
100%
100+100+100+96=396/400=99 Code Coverage Total Notes:
- Best Effort Coverage (Max 25%) Total
- 1) Code Coverage refers to the maximum percentage of the required examination volume that is effectively examined with the qualified examination procedure.
- 2) Best Effort Coverage refers to the required examination volume past the weld centerline that is examined in the axial beam direction with an Appendix VIII demonstrated procedure for single sided coverage.
2.2" 99%
N/A
~-~,
wDJ Dominion' Site/Unit:
NAPS Summary No.:
N1.R1.20.101 Workscope:
ISi Code:
2004 Edition Drawing No.:
11715-WMKS-0109G-2 System ID:
RC UT Calibration/Examination Procedure:
ER-AA-NDE-UT-700 Cat.lltem:
Procedure Rev.:
.Work Order No.:
R-A/R1.20
==
Description:==
P!PE-WELDOLET 0
59102983133 Location:
Outage No.:
N1R25 Report No.:
UT-16-086 Page:
1 of 3
C-LOOP Component 10: 11715-WMKS-0109G-2 / 29-RC*7 / SW-31 Size!Length:
2.5" / 80" Thickness/Diameter:
3.20" / 29" Limitations:
See attached.
Start Time:
1025 Finish Time:
1048 Seriat No.:
Manufacturer:
Instrument Settings 140723507 Olympus Search Unit Serial No.:
021N2J Manufacturer:
KBA Model:
EPOCH 600 Linearity:
Size:
1.0 om Model:
Comp-G _
Delay:
13.830 µs Range: -
7.200"
____ Freq.:
1.0 M HZ Center Freq.:
N/A M'tl CalNel:
0.2330 infµs Pulser:
sauare 45° Squint Angle: ~
Exam Ang.le:
Damping:
400 n Reject:
0%
Measured Angle:
45° Mode: Longitudinal Rep. Rate:
Auto Freq.:
1.0 Mhz Exit Point 0.90"
- of Elements:
1 Filter:
0.2-1.2 Mhz Mode:
Fullwave Config.:
Single Focus: F.D.* 2.44" Voltage:
400 Other:
N/A Shape:
Round Contour:
N/A sws Cal.
Time Date Checks Initial Cal.
0700 9/20/2016
- Inter. Cal.
1025 9/20/2016 Inter. Cal.
NIA Inter. Cal*.
1048 9/20/2016
. Final Cal.
1142. 9/20/2016 Coupl.mt Cal. Batch:
12J066 Type:
Sonotech Mfg.:
S ONOTECH Wedge Style: ----------- Exam Batch:
12J066 Ax. Gain (dB):
60.0 Circ. Gain (dB):
N/A Search Unit Cable Sonotech 10 Screen Div.=
7.20 in. of Sound Path Type: ________ _
Type:
RG-174-Length:...£_ No. Conn.: ~ Mfg.:
SONOTECH Calibration Block Scan Coverage Cal. Block No.
VGB-33 Upstream-~ Downstream Scan dB: 66.0 Reference Block Thickness 2.580" Dia.:
o
- CW ~
CCW ~ Scan dB: 66.0 Serial No.:
05-6533 Cal. Blk. Temp.
71° Temp. Tool:
1076BGCY I
Exam Surface:
OD Type:
SS Rompus Block Surface Conditioo:
Contour Ground Axial Oriented Search Unit Calibration Signal Sweep Sound Path Reflector Amplitude%
Division ID Notch 80%
5.0 3.600" Circumferential Oriented Search Unit Calibration Signal Sweep Sound Path Reflector Amplitude %
Division N/A Reference/Simulator Block Gain Signal Sweep Sound Path dB Reflector Amplitude% Division 50.0 FSDH 85%
1.5 1.060" *
- r.
Comp. Temp.
83° Temp. Tool:
1076BGCY Recordable lndication(s):
Yes D No ~
Results:
NRI ~
RI 0 (If Yes, Ref. Attacf,ed Ultrasonic Indication Report.)
Geom O Comments: Search unit #2 of tandem unit SN
- 021 N29. Tandem wedge SN - 389-078-51C.
Percent Of Coverage Obtained > 90%:
Examiner Level U-PDI Fuechlmann, Gary P Examiner Level JIJ-PDI Popp, Darrell J.
Other N/A Level N/A UT Calibration/Examination No Reviewed Previous Data:
N/A Date I Reviewer 9/20/2016 w..l-.1J.1:,.,.,J\\, f Date 9/20/2016 Date I ANII Review Signawre Signature
~~
Date
~-Z2-11:,
Date
(.
Date
~?#~
I I
Supplemental Report Report No.:
UT-16-086 P~ge:
2
-of 3
Summary No.: N1.R1.20.101 Examiner: -Fu_e_c_h-tm_a_n_n_, -G-ar_y_P_~----L-e-vel: 11-PDI Reviewer:
vJ.t.."jl:i\\?M-1-:,
f,f,~ fit 4/;l--Date: CJ'l*i/-2* 1i,.
Examiner: Popp, Darrell J. er Level: II-POI Site Review: ~fl. ~2iut~ l-v ~
Date: 'f2.V2.df' Other: _N_/A _________
_ Level:
NIA ANII Review:
cM z Date: ?h.?ffe Comments:
Sketch or Photo:
3, 3'
--~-------1-------
r PrP
'3. 1."
Additional - Supplemental Data
Report No: UT-16-086 Summary# N1.R1.20.101 Pg. 3 of 3
Prepared by: W. Thomas Date: 9/22/2016 Weld Number Thickness SW-31 3.2" Weld Width Weld Length 2.5" 80" FLOW BRAN 2
2 I
I CL
~
SN-31 5
I I
/
PIPE I
I I
I I
EXAMINED 100% OF TI-iE REQUIRED VOLUME AXIAL DIRECTIOO NO CIRC EXAM BRANCH SIDE 45 Examination Volume Dimensions -
Height 1.07" Length 80" Width 3.5" Coverage Summary Required Scans (each has a weighing factor of 100 for complete coverage)
ANGLE UpSt-Ax UpSt-Circ DnSt-Ax DnSt-Circ 45 100%
100%
100%
0%
Code Coverage Total 75%
100+100+100+0=300/400=75
- Best Effort Coverage (Max 25%) Total N/A Notes:
- 1) Code Coverage refers to the maximum percentage of the required examination volume that is effectively examined with the qualified examination procedure.
- 2) Best Effort Coverage refers to the required examination volume past the weld centerline that is examined in the axial beam direction with an Appendix VIII demonstrated procedure for single sided coverage.
A.
/)e,,tf'IU 4s~~ I.JI/(,-~}A *-* ~_/
'll~!>por,
~
ewed D Witnessed
~~
~~
- ,n, Domirviorf Liquid Penetrant Examination Sile/Unit
NAPS Procedure:
ER-AA-NDE-PT-300 Outage No.:
N1R25 Suri,mary No.:
N1.R1.20.101 Procedure Rev.:
7 Report No.:
PT-16-023 Works cope:
AUG Work Order No.:
59102983133 Page:
1 of 1
Code:
2004 Edition Cat./ltem:
R-A/R1.20 Location:
C-LOOP Drawing No.:
11715-WMKS-0109G-2
==
Description:==
PIPE-WELDOLET System ID:
RC ---~----------------==-------------------------
.Compo n en I ID: 11715-WMKS-0109G-2 / 29-RC-7 / SW-31 Limitations:
None Light Meter Mfg.:
N/A Serial No.:
N/A Temp. Tool Mfg.:
AEM0 Instruments Serial No.:
1076BGCY Comparator E)lock Temp.:
Side A:
N/A
°F Side B:
N/A
°F Resolution:
Lo/Wo Location:
N/A Surface Condition:
Visible~
Cleaner Penetrant Fluorescent 0 Remover Brand MAGNAFLUX MAGNAFLUX MAGNAFLUX Type SKC-S SKL-SP2 SKC-S Batch No.
15J10K 12A08K 15J10K Time Evap.
3 Min.
Dwell 10 Min.
Evap.
2 Min.
Time Exam Started:
0935 Time Exam Completed:
Indication Loe Loe Diameter Length Type No.
L w
R/L NIA Comments:
Used flashlight for illumination.
Character Resolution Card: DOM-2016-0163.
Results:
NRI ~
RID Eval D N/A Percent Of Coverage Obtained > 90%:
N/A Reviewed Previous Data:
Examiner Level 11 Date Shelton, James R.
9/20/2016 Date viel.{;
9/20/2016 1Ztu,,.,
Examiner Level 11 Thompson, Brenton R.
other Level NIA Dale ANII Review N/A Liquid Penetranl Examination Mat.fThickness:
ss / 3.20" Illumination:
N/A*
Surface Temp.: __
8_3 __ °F 0.044" Character Card Ground Developer MAGNAFLUX SKD-S2 14K04K Develop 10 Min.
1020 Remarks N/A Signature Dale N2R26 Unit 2 Pressurizer Surge Line Welds Examination Results Virginia Electric and Power Company (Dominion Energy Virginia)
North Anna Power Station Unit 2 Serial No.: 20-049A Docket No.: 50-339
~Dominion"'
Site/Unit:
UT Calibration/Examination NAPS 2
Procedure:
ER-AA-NDE-UT-706 Outage No.:
N2R26 Summary No.:
N2.R1.11.314 Procedure Rev.:
Report No.:
UT-19 -072 Workscope:
ISi Work Order No.:
59203136641 Page:
1 of Code:
2004 Edition Cat./ltem:
R-AIR1.11 Location:
\\
C-LOOP Drawing No.:
12050-WMKS-0109D
==
Description:==
Weldolet to Elbow
\\
System ID:
RC
\\
Component ID: 12050-WMKS-0109D / 14-RC-410 / 3 Size/Length:
1.30" / 43.75"
\\
Limitations:
None Start Time:
2239 Thickness/Diameter:
Finish Time:
1.406" I 14.0" 2254 I
Instrument Settings Search Unit Cal.
Axial Oriented Search Unit Time Date I
Serial No.:
140723807 Serial No.:
57 461-52980 Checks Calibration I Signal Sweep Sound Path Manufacturer:
Olympus Manufacturer:
GE Initial Cal.
2032 3/8/2019 Reflector Amplitude%
Division Model:
EPOCH 600 Linearity:
L-16-001 Size:
3.5X10mm Model:
MSEB2 Inter. Cal.
2239 3/8/2019 Backwall
\\
BO 7.0 1.416" Delay:
9.851 µs Range:
2.0" Inter. Cal.
N/A Freq.:
2.0 MHZ Center Freq.:
N/A Inter. Cal.
2254 3/8/2019 M'tl CalNel:
0.2270 in/µs Pulser:
Square Exam Angle:
o*
Squint Angle:
N/A Final Cal.
3/8/2019 2349 Damping:
4000 Reject:
0%
Measured Angle:
NIA Mode: Longitudinal Couplant Rep. Rate:
Auto Freq.:
2.0 Mhz Exit Point N/A
- of Elements:
2 Circum1ferential Oriented Search Unit
-- Cal. Batch:
17F0B7 Filter:
0.5 - 4.0 Mode:
Ful!wave Config.:
Dual Focus:
N/A I
Type:
Sonotech Calibration I Signal Sweep Voltage:
400 Other:
N/A Shape:
Round Contour:
Flat Reflector Amplitude%
Division Mfg.:
Sonotech Wedge Style:
N/A NIA I
Exam Batch:
17F0B7 I
Ax. Gain (dB):
38 Circ. Gain (dB}:
N/A Search Unit Cable Type:
Sonotech I
1 Screen Div."'
0.20 in. of Sound Path Type:
RG 174 Length: 6' No. Conn.: ~ Mf.
Sonotech g..
I Calibration Block Scan Coverage I
Cal. Block No.
Part under test Upstream O Downstream~ Scan dB:
50 Reference Block Reference/Simulator Block Gain I
Signal Sweep Thickness 1.406" Dia.:
14.0" cw CCWQ ScandB: NIA Serial No.:
08-7832 dB Reflector Amplitude% Division Cal. Blk. Temp. 72° Temp. Tool:
ATK-2 Exam Surface:
-- Type:
2.0" SS Step Wedge 38 1.0 I 80 5
2.0 I Comp. Temp.
so* Temp. Tool:
ATK-2 Surface Condition:
Smooth 38 45 10 Recordable lndication(s).
Results:
NRI ~
RI 0 0~
(If Yes, Ref. Attached Ultrasonic Indication Report.)
Geom D I
Comments: Lamination Scan. I See UT-19-073 for angle beam inspection.
Percent Of Coverage Obtained > 90%:
Examiner Level 11-PDI Wertman, Justin Examiner NIA Other NIA Level NIA Level NIA UT Calibration/Examination Yes Reviewed Previous Data:
NIA Signature Date 318/2018 l
ZJJ/2
- --~
Sound Path Sound Path 1.00" 2.00" Date
.3,/D*t.if
~
UT Calibration/Examination
.,;,JtDominion' Site/Unit:
NAPS 2
Procedure:
ER-AA-NDE-UT-802 Outage No.:
N2R26 Summary No.:
N2.R1.11.314 Procedure Rev.:
5 Report No.:
UT-19 -073 Workscope:
ISi Work Order No.:
59203136641 Page:
1 of 5
Code:
2004 Edition Cat./ltem:
R-A/R1.11 Location:
\\
C-LOOP Drawing No.:
12050-WMKS*0109D
==
Description:==
Weldolet to Elbow
\\
System ID:
RC
\\
Component ID: 12050-WMKS-0109D / 14-RC-410 / 3 Size/Length:
1.25" / 44.0"
\\
Limitations:
Single sided due to weld-o-let. See attached Start Time:
1258 Thickness/Diameter:
1.406" / 14.0" 1313 Finish Time:
Instrument Settings Search Unit Cal.
..a!xial Oriented Search Unit Time Date Serial No.:
140723807 Serial No.:
01CXBL Checks I
Initial Cal.
Calibration
\\
Signal Sweep Sound Path Manufacturer:
Olympus Manufacturer:
KBA 1015 3/9/2019 Reflector Amplitude%
Division Model:
EPOCH 600 Linearity:
L-19 -001 Size:
0.5" Model:
Comp-G Inter. Cal. ' 1258 3/9/2019 1.50" Notch 1
80 5.3 2.11" Delay:
6.611 Range:
4.00 Freq.:
2.25 MHZ Center Freq.:
N/A Inter. Cal. '
N/A M'tl CalNel:
0.1230 Pulser:
Square Inter. Cal.
1313 3/9/2019 Exam Angle:
45 Squint Angle:
N/A Damping:
400 Reject:
0 Final Cal.
1559 3/9/2019 Measured Angle:
45 Mode:
Shear Rep. Rate:
Auto Freq.:
2.25 Couplant Exit Point 0.20
- of Elements:
1 Circurriferential Oriented Search Unit Filter:
0.5-4.0 Mode:
-- Cal. Batch:
17F087 Config.:
Single Focus:
N/A Voltage:
400 Other:
NIA Type:
Sonotech Calibration
\\
Signal Sweep Shape:
Round Contour:
Flat Reflector Amplitude%
Division Sound Path Mfg.:
Sonotech Wedge Style:
MSWQC N/A I
Ax. Gain (dB):
13.0 Circ. Gain (dB):
N/A Exam Batch:
17F087 I
10 Search Unit Cable Screen Div. =
4.00 in. of Sound Path Type:
Sonotech
\\
Type:
RG 174 Length:
6 No. Conn.: o Mfg.:
Sonotech I
Calibration Block Scan Coverage Cal. Block No.
05-8514 Reference Block Reference/Simulator Block Thickness 2.25" Dia.:
0 Upstream O Downstream@ Scan dB: 25.0 Gain I
Signal Sweep CW@
CCW@ Scan dB:
- 25.0 Serial No.:
05-6533 dB Reflectqr Amplitude% Division Sound Path Cal. Blk. Temp.
71 Temp. Tool:
ATK-2 Type:
SS Rompus Block SHI Exam Surface:
OD 13.0 22 2.6 1.054 Comp. Temp.
86 Temp. Tool:
ATK-2 I
Surface Condition:
Ground Smooth Recordable lndication(s):
Yes O No@
(If Yes, Ref. Attached Ultrasonic Indication Report.)
I Results:
NRI@
RID Geom O Comments: None Percent Of Coverage Obtained > 90%:
No Reviewed Previous Data:
N/A Examiner Level 11r,01 Signature Date Reviewer w.!II--
~
Date Johnson, Jeffrey M.
""" j 3/9/2019 v..}L~OMA, S s~10-1t.t I/
Examiner Level t< ~
~ ~
Signature Date ~e Rev/4ewP.Stt wu
~f\\1,.
51 J~\\ure rv-i,
)
¥~~ate Zollner, Brian D
_a.
~
3/9/2019 kJNlS
- 1r,Lr 4.u{)
..:........ µ..~
('i Other Level I
C Signature Date ANII Review d~
Date NIA N/A 3~~9 UT Calibration/Examination
,~
Dom1n1on' Site/Unit:
NAPS UT Calibration/Examination 2
Procedure:
ER-AA-NDE-UT-802 Outage No.:
N2R26 Summary No.:
N2.R1.11.314 Procedure Rev.:
5 Report No.:
UT-19 -073 Workscope:
151 Work Order No.:
59203136641 Page:
2 of 5
Code:
2004 Edition Cal./ltem:
R-A/R1.11 Location:
C-LOOP Drawing No.:
12050-WMKS-01090
==
Description:==
Weldolet to Elbow System ID:
RC ------------------------------------------------+---------------
Component ID: 12050-WMKS-01090 / 14-RC-410 / 3 Size/Length:
1.25" / 44.0" 1 Thickness/Diameter:
Limitations:
Single sided due to weld-o-let. See attached.
Start Time:
131f Finish Time:
1.406" / 14.0" 1328 Instrument Settings Search Unit Cal.
Time Date kial Oriented Search Unit I
Serial No.:
140723807 Serial No.:
00F1DL Checks Calibration
\\
Signal Sweep Sound Path Manufacturer:
Olympus Manufacturer:
KBA Initial Cal.
1034 3/9/2019 Reflector Amplitude%
Division Model:
EPOCH 600 Linearity:
L-19 -001 Size:
0.50" Model:
Comp-G Inter. Cal.
1314 3/9/2019 1.50" Notch '
80 5.3 2.634 Delay:
8.311 Range:
5.00 Freq.: 2.25 MHZ Center Freq.:
N/A Inter. Cal.
N/A Inter. Cal.
1328 3/9/2019 M'II CalNel:
0.1230 Pulser:
Square Exam Angle:
60 Squint Angle:
N/A Final Cal.
1601 3(9(2019 Damping:
400 Reject:
0 Measured Angle:
60 Mode:
Shear Couplant Rep. Rate:
Auto Freq.:
2.25 Exit Point 0.30
- of Elements:
1 Circum1ferential Oriented Search Unit Mode:
FW Cal. Batch:
17F087 Filter:
0.5-4.0 Config.:
Single Focus:
NIA I
Voltage:
400 Other:
N/A Type:
Sonotech Calibration I Signal Sweep Sound Path Shape:
Round Contour:
Flat Reflector Amplitude%
Division Mfg.:
Sonotech Wedge Style:
MSWQC NIA l
Ax. Gain (dB):
30.0 Gire. Gain (dB):
N/A Exam Batch:
17F087 I
Search Unit Cable 5.00 in. of Sound Path Length:
No. Conn.: o Type:
Sonotech I
10 Screen Div. =
Type:
RG 174 6
Mfg.:
Sonotech I
Calibration Block Scan Coverage Reference/Simulator Block Cal. Block No.
05-8514 Upstream O Downstream~ Scan dB: 42.0 Reference Block Gain l
Signal Sweep Sound Path Thickness 2.25" Dia.:
0 CW~
CCW ~ Scan dB: 42.0 Serial No.:
05-6533 dB Reflectqr Amplitude% Division Cal. Blk. Temp.
71 Temp. Tool:
ATK-2 Exam Surface:
OD Type:
SS Rompus Block 30.0 FSDHI 75 2.9 1.483 Comp. Temp.
86 Temp. Tool:
ATK-2 Surface Condition:
Ground Smooth I
Recordable lndication(s):
Yes D No~
/If Yes. Ref. Attached Ultrasonic Indication Reoort.\\
I Results:
NRI ~
RI 0 Geom O Comments: Effective coverage uking the 60 Deg search unit has been verified by the bresence of the weld root response Percent Of Coverage Obtained > 90%:
Examiner Level Johnson, Jeffrey M.
Examiner Level Zollner, Brian D Other N/A Level UT Calibration/Examination No Reviewed Previous Data:
Signature N/A during the required ~cans.
Date I Reviewer Lt,""'\\J~
Date I ANII Review J'/~
Date 3,Jo.,;r=,
-...J f Date q~ >O("r Date
,Dominion"'
Site/Unit:
NAPS UT Calibration/Examination 2
Procedure:
ER-AA-NDE-UT -802 Outage No.:
N2R26 Summary No.:
N2.R1.11.314 Procedure Rev.:
5 Report No.:
UT-19 -073 Workscope:
ISi Work Order No.:
59203136641 Page:
3 of 5
Code:
2004 Edition Cat./ltem:
R-A/R1.11 Location:
C-LOOP Drawing No.:
12050-WMKS-0109O
==
Description:==
Weldolet to Elbow
\\
System ID:
RC
\\
Component ID: 12050-WMKS-0109O/14-RC-41013 Size/Length:
1.25" / 44.0"
\\
Limitations:
Single sided due to weld-o-let. See attached Thickness/Diameter:
1.406" / 14.0" 1350 Start Time:
1342 Finish Time:
I Instrument Settings Search Unit Cal.
Date
.kcial Oriented Search Unit Time I
Serial No.:
140723807 Serial No.:
06-109 Checks Calibration I Signal Sweep Sound Path Manufacturer:
Olympus Manufacturer:
RTD Initial Cal.
1105 3/912019 Reflector Amplitude%
Division Model:
EPOCH 600 Linearity:
L-19 -001 Size:
2(15X25)
Model:
TRL2-AUST Inter. Cal.
1342 319/2019 1.50" Notch I 80 5.0 2.669 Range:
5.700 Center Freq.:
NIA Inter. Cal.
NIA I
Delay:
10.211 Freq.:
2.0 MHZ Inter. Cal.
1350 31912019 I
M'tl CalNel:
0.2320 Pulser:
Square Exam Angle:
60 Squint Angle:
NIA Final Cal.
1604 3/9/2019 Damping:
400 Reject:
0 Measured Angle:
61 Mode: Longitudinal Couplant Rep. Rate:
Auto Freq.:
2.0 Exit Point
.75
- of Elements:
2 Circu~ferential Oriented Search Unit Filter:
0.5-4.0 Mode:
-- Cal. Batch:
17F087 Config.:
D-SBS Focus:
FD.1.3" Voltage:
400 Other:
NIA Type:
Sonotech Calibration Signal Sweep Sound Path Shape:
Retangular Contour:
FLAT Reflector Amplitude%
Division Mfg.:
Sonotech Wedge Style:
Integral NIA Ax. Gain (dB):
54.0 Circ. Gain (dB):
N/A Exam Batch:
17F087 I
Search Unit Cable 5.70 Sound Path No. Conn.: O Type:
Sonotech I
10 Screen Div. =
in. of Type:
RG 174 Length:
6 Mfg.:
Sonotech I
Calibration Block Scan Coverage Cal. Block No.
05-8514 Upstream 0 Downstream O Scan dB: 60.0 Reference Block R~,ferencelSimulator Block Gain I
Signal Sweep Sound Path Thickness 2.25" Dia.:
0 cwo CCW O Scan dB: NIA Serial No.:
05-6533 dB Reflector Amplitude% Division Cal. Blk. Temp.
71 Temp. Tool:
ATK-2 Exam Surface:
OD Type:
SS Rompus Block 48.0 FSDH\\
45 2.7 1.556 Comp. Temp.
86 Temp. Tool:
ATK-2 Surface Condition:
Ground Smooth I
Recordable lndication(s}:
Yes O No0 (If Yes, Ref. Attached Ultrasonic Indication Report.)
I Results:
NRI 0 RID Geom O Comments: None.
Percent Of Coverage Obtained > 90%:
Examiner Level 11-PDI Johnson, Jeffrey M.
Examiner Level Zollner, Brian D Other NIA Level UT Calibration/Examination No Reviewed Previous Data:
Signature NIA Date 3/9/2019 Date 3/9/2019 Date ANII Review
~~7
~
Date J/ ZJ 4)
,Dominion*
Summary No.: N2.R1.11.314 Examiner: Johnson, Jeffrey M.
Examiner: Zollner, Brian D Other: _N....;/.;...A;._, ____________ _
Comments:
Sketch or Photo:
Supplemental Report Report No.:
UT-19 -073 Page:
4 of 5
t..e;J,:JJC'
\\
Level:
11-PDI Reviewer:
Level: 11-PDI Site Review: _.,,'3':'.f-'-',. '-"c... *-u:..--;-,-...
<uV-Date: 3 */D* }1 Date: ~/U-(us,.:,
Date: Jb.at.
Level: ~
ANH Review:
, cc <tr:=
fLaw )t I
I
\\ ! i I
I I
.. IS CIS - \\,'j.7 l..
~ ~ Toe-- I. ;i cf'.1..
L,j~~ 4..- \\,l..\\"!S,.
- 1...>cLe~.'- o - \\..e..\\
'L m~\\
1:)5 Toe,~ I *.11<.t:,"
~
t l, 5 b 5 - I. 4 o5 J..s". b5 - l. 3<f7..
wc.....w... /,JS-o
- \\
Additional - Supplemental Data
<:::,..,.i I
\\
'1
\\
I I
l'-l: \\c'> :1 10 /.3 \\
\\ I I I l l
Report No: UT-19-073 Summary# N2.R1.11.314 Dom1n1on Pg.
5 of 5
~,
_ t 1A Prepared by: W. Thomas7~
Weld Number Thickness 3
1.283" Date:
3/10/2019 Weld Width Weld Length FLOW 60L 3
~---,--~--
WELDCl.ET
\\
ELBOW
- ~<-.L...L; EXAMINED 100% OF THE REQUIRED VOLUME OS SIDE.
EXAMINED 100% OF THE REQUIRED VOLUME US SIDE BEST EFFORT Examination Volume Dimensions -
Height 0.428" Length 44" Width Coverage Summary Required Scans (each has a weighing factor of 100 for complete coverage)!
1.25" 44" 2.25" ANGLE UpSt-Ax UpSt-Circ DnSt-Ax DnSt-Circ 45/ 60 0%
100%
100%
60L
- 100%
Code Coverage Total I
50%
100+ 100+ 100+0=300/ 400=.75
- Best Effort Coverage (Max 25%) Total I
25%
Notes:
ff
- 1) Code Coverage refers to the maximum percentage of the required examination volume 0
that is effectively examined with the qualified examination procedure.
I
- 2) Best Effort Coverage refers to the required examination volume past the weld 5/41/
centerline that is examined in the axial beam direction with an Appendix VIII demonstrated procedure for single sided cov~age.
'-fJM~ f! ~c./C<A-r-iA tv11 ( I ;A ffi
. f/~J,{2.£:J !>/Z-r../-z.,f "{
v R evlewed ltnessed
~
k artford team Boiler 9531 HSB
,Dominion' Liquid Penetrant Examination Site/Unit:
- NAPS 2
Procedure:
ER-AA-NDE-PT-300 Outage No.:
N2R26 Summary No.:
N2.R1.11.314 Procedure Rev.:
7 Report No.:
PT-19 -012 Workscope:
AUG Work Order No.:
59203136641 Page:
1 of 1
Code:
2004 Edition Cat./ltem:
R-A/R1.11 Location:
C-LOOP Drawing No.:
12050-WMKS-0109D
==
Description:==
WELDOLET-TO-ELBOW System ID:
~R:C~:-;:~-:;::;:;:--;-:~:=:-::::::===================~~~==--JSS~*t,f=;-':=*'/(!!-~~~"--
ComQonent ID: 12050~WMKS-0~090-/-14*RG=4t0*/-3 Mat/Thickness:
140G" f 1416
---Li-m-itations:
None
~1' Light Meter Mfg.:
N/A Serial No.:
NIA Temp. Tool Mfg.:
ATKINS Serial No.:
ATK-2 Comparator Block Temp.:
Side A:
N/A
°F Side B:
N/A
°F Resolution:
Lo/Wo Location:
TDC I Weld Center Line Surface Condition:
Illumination:
N/A Surface Temp.: __
8_0 __ °F 0.044" Character Card Ground Smooth Visible~
Cleaner Penetrant Fluorescent 0 Remover Brand MAGNAFLUX Type SKC-S Batch No.
18C21K Time Evap.
3 Min Dwell Time Exam Started:
2151 Indication Loe Loe Diameter Length No.
L w
NRI Comments:
DOM-2016-0156 Flashlight used to resolve character card Results:
NRI ~
RI 0 Percent Of Coverage Obtained > 90%:
Examiner Level Flood, Steven Examiner N/A Other N/A Level N/A Level N/A Liquid Penetrant Examination Signature Signature MAGNAFLUX MAGNAFLUX SKL-SP2 SKC-S 15J02K 18C21K 10 Min Evap.
1 Min Time Exam Completed:
Type R/L Eval NIA Yes Reviewed Previous Data:
Date Reviewer 3/8/2019 N/A Date Site Review 3/8/2019 Dennis Strickland lv II Date ANII Review fl N
Developer MAGNAFLUX SKD-S2 14K04K Develop 10 Min 2225 Remarks NIA Signature Date Date 3/18/2019 Date
~
6Dominion' Site/Unit:
NAPS UT Calibration/Examination 2
Procedure:
ER-AA-NDE-UT-700 Outage No.:
N2R26 Summary No.:
N2.R1.20.0404 Procedure Rev.:
0 Report No.:
UT-19 -017 Workscope:
AUG Work Order No.:
59203136641 Page:
of 2
Code:
2004 Edition Cat./ltem:
R-A/R1.20 I
Location:
~-LOOP Drawing No.:
12050-WMKS-0109G-2
==
Description:==
Pipe to Branch Connection weld System ID:
RC Component ID: 12050-WMKS-0109G-2 / 29-RC-407 / SW-36 Limitations:
1 Adjacent loop stop valve. See attached.
Size/Length:
2.2" I 50" Start Time:
Thic'kness/Diameter:
1352
.I Finish Time:
2.58" /29" 1410 Instrument Settings Search Unit Cal.
I Time Date Axial Oriented Search Unit Serial No.:
140723807 Serial No.:
97-733 Checks I
Calibration Signal Sweep Manufacturer:
Olympus Manufacturer:
RTD Initial Cal.
0930 3/9/2019 Reflector Ampli~ude %
Division Sound Path Model:
EPOCH 600 Linearity:
L-19 -001 Size:
2(20X34)
Model:
TRL 1-AUST Inter. Cal.
1352 3/9/2019 ID Notch 80 5.3 3.760" Delay:
12.811 Range:
7.200 Freq.:
1.0 MHZ Center Freq.:
NIA Inter. Cal.
I M'tl CalNel:
0.2320 Pulser:
Square Inter. Cal.
1410 3/9/2019 I
Exam Angle:
45 Squint Angle:
SAS Damping:
400 Reject:
0 Final Cal.
1610 3/9/2019 I
Measured Angle:
45 Mode:
Long I
Rep. Rate:
Auto Freq.:
1.0 Couplant Exit Point 0.9
- of Elements:
2 Circumferentikt Oriented Search Unit Filter:
.2 -10 Mode:
Dual
-- Cal. Batch:
17F087 Config.:
Dual Focus:
FS-80 I
Voltage:
400 Other:
NIA Type:
Sonotech Calibration Signal Sweep Shape:
Rect.
Contour:
Flat Reflector Ampli~ude %
Division Sound Path Mfg.:
Sonotech Wedge Style:
Integral ID Notch I
4.260" Ax. Gain (dB}:
Circ. Gain (dB):
8,0 5.8 68.0 NIA Exam Batch:
17F087 I
Search Unit Cable 10 Screen Div. =
7.20 in. of Sound Path Type:
Sonotech I
Type:
RG 174 Length:
6 No. Conn.: O Mfg.:
Sonotech I
Calibration Block Scan Coverage Cal. Block No.
VGB-33 Upstream ~ Downstream O Scan dB:
74 Reference Block Referenc~/Simulator Block Thickness 2.580" Dia.:
0 Gain Signal Sweep Sound Path cw~
CCW~ ScandB:
- 74 Serial No.:
05-6533 dB Reflector Amplitude% Division Cal. Blk. Temp.
71 Temp. Tool:
ATK-2 Type:
SS Rompus Block I 20 Exam Surface:
OD 50.0 FSDH 1.4 1.05" Comp. Temp.
86 Temp. Tool:
ATK-2 I
Surface Condition:
Ground Smooth Recordable lndication(s):
Yes O No~
(If Yes, Ref. Attached Ultrasonic Indication Report.)
I Resulls:
NRI ~
RI 0 Geom O Comments: None Percent Of Coverage Obtained> 90%:
No Reviewed Previous Data:
Yes Examiner Level 1-PDI Signature Date Reviewer 1£,14'
~LJ
~111/z:~~
Johnson, Jeffrey M.
'L-v i-,.,--
3/9/2019 W l. :,C:,o.,,.AA Examiner Level G I-POI R:..~ Signature Date Sile Review
~x
- Date Zollner, Brian D 3/9/2019 ~ex:/e_~ Lv~ ;;,- "./'./.
I i 1~1.1,.,,
Other Level N/A
- !*o Signature Date ANII Review ;if A 1..----"' Signat6re I Date N/A UT Calibration/Examination I
ftD..
~,- om1n1on Report No: UT-19-017 Summary# N2.R1.20.0404 Pg.
2 of 2
Prepared by: W. Thomas.f{l' t..~ll r:a::
Date:
3/11/2019
~~v~
Weld Number Thickness SW-36 Weld Width 2S!' T
~
2.58" I BRANCll COHN.
I I
I I
L Weld Length S1!-36 45 PIPE
- 86-HEIGHT X 3. Z-1110TH = 2. 75 SO. IN X 50- LENGTH = 137. 5 CU. IN = REQUI RED VOLUIIE
~
u,~,.~ w.'""' "ff""""'",,. *~ ~ m ~ *-*
OM"" o.,o ~ '" ~ """'" "'mo, o,e E ~ '"""
NO EXAM AX OR CI RC FOR 25S OF THE WELD LENGTH Examination Volume Dimensions -
DUE TO LOOP SIOP VAVE CIRC EXAII LIMITED TO 30% COVERNJE FOR 75~ OF THE WELD LENOTlt DUE TO WELD TAPER Height 0.86" Length 50" Coverage Summary Width Required Scans (each has a weighing factor of 100 for complete coverage)!
ANGLE AXIAL I CIRC 45 64% I 22.5%
Code Coverage Total I
64+22.5=86.5/200=.4325
- Best Effort Coverage (Max 25%) Total I
Notes:
50" 3.2" 43.25%
N/A
- 1) Code Coverage refers to the maximum percentage of the required examination volume that is effectively examined with the qualified examination procedure.
- 2) Best Effort Coverage refers to the required examination volume past the weld centerline that is examined in the axial beam direction with an Appendix VIII demonstrated procedure for single sided coverage.
Liquid Penetrant Examination Site/Unit:
NAPS 2
Procedure:
ER-AA*N DE-PT-300 Outage No.:
N2R26 Summary No.:
N2.R1.20.0404 Procedure Rev.:
7 Report No.:
PT-19 -013 Workscope:
AUG Work Order No.:
59203136641 Page:
1 of 1
Code:
2004 Edition Cat./ltem:
R-A/R1.20 Location:
C-LOOP D_ra_w_ing No.:
12P_50-WMKS.:0.:1.09.G=~---Descriplion;-Pipe-to-Branch-Gonnection*weld--------~-:-3=-/ul,.,,--
System ID:
RC Component ID: 12050-WMKS-0109G-2 / 29-RC-407 / SW-36 Limitations:
None Light Meter Mfg.:
N/A Serial No.:
NIA Temp. Tool Mfg.:
ATKINS Serial No.:
ATK-2 Comparator Block Temp.:
Side A:
N/A
°F Side B:
N/A
°F Resolution:
Lo/Wo Location:
TDC I Weld Center Line Surface Condition:
Visible~
Cleaner Penetrant Fluorescent 0 Remover Brand MAGNAFLUX MAGNAFLUX Type SKC-S SKL-SP2 Batch No.
18C21K 15J02K Time Evap.
3 Dwell 10 Time Exam Started:
2151 Indication Loe Loe Diameter Length Type No.
L w
R/L NRI Comments:
DOM-2016-0156 Flashlight used to resolve character card Results:
NRI ~
RI 0 Percent Of Coverage Obtained > 90%:
Eval O
~
Yes Examiner Level II Date Flood, Steven 3/8/2019 Examiner Level N/A Signature Date N/A 3/8/2019 Other Level N/A Signature Date N/A Liquid Penetrant Examination MAGNAFLUX SKC-S 18C21K Evap.
1 Time Exam Completed:
N/A Reviewed Previous Data:
Reviewer
,,,. L---
~
u:;..v-.µi.
Mat/Thickness:
SS/4-,400!.l.
Illumination:
N/A Surface Temp.: __
8_0 __ °F Not Used Ground Smooth Developer MAGNAFLUX SKD-S2 14K04K Develop 10 2225 Remarks N/A