Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217J238 | 13 October 1999 | Informs That Attached Questions Transmitted by Fax on 991013 to J Rainsberry of Southern California Corp to Prepare for Upcoming Telephone Call | |
ML20212G379 | 24 September 1999 | Notification of 991006-07 Meeting with Industry in San Clemente,California to Discuss Technical Issues Re Industry Development of Submittals for risk-informed Technical Specification Improvements | |
ML20211J559 | 1 September 1999 | Informs That Application Date in First Line of Attached Ltr Issued 990823 Corrected to Read 990625, Not 1997. Requests That Corrected Copy Be Submitted to H Ray | |
ML20211H444 | 27 August 1999 | Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues | |
ML20211H043 | 9 August 1999 | Submits Comments on San Onofre Response to NRC Request for Addl Info on risk-informed IST Program | |
ML20210G467 | 30 July 1999 | Forwards Draft rept,NUREG/CR-xxxx,Vol x,INEEL/EXT-99-00373, High-Pressure Safety Injection Sys Reliability,1987-1997 | |
ML20196D702 | 25 June 1999 | Informs That Reactor Sys Branch Prepared Suppl 1 to GL 83-11 Re Licensee Qualification for Performing Safety Analyses, Which Was Issued on 990624.Matl Related to Subj GL Should Be Placed in PDR & Made Available to Public | Backfit |
ML20195H725 | 11 June 1999 | Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam,Submittal for Retake Exam Administered on 990416 | |
ML20195H603 | 11 June 1999 | Forwards Exam Repts 50-361/99-301 & 50-362/99-301 Administered at Facility on 990416,with as Given Written Exam Attached | Boric Acid Shutdown Margin Stroke time Earthquake Deep Dose Equivalent Offsite Circuit Downpower Unidentified leakage Siren |
ML20207F114 | 4 June 1999 | Notification of Significant Licensee Meeting with Util on 990628 to Discuss Emergency Preparedness Program Status & Planned Changes | |
DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action | 20 April 1999 | Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action | |
ML20205Q449 | 19 April 1999 | Forwards Viewgraphs of 990419 Telcon Re SG Eddy Current Insp Results Obtained During Imminent Refueling Outage | |
ML20205N882 | 15 April 1999 | Forwards Questions Transmitted by Fax on 990415 to J Rainsberry of SCE & Request for Conference Call to Be Scheduled with Staff to Discuss SG Eddy Current Insp Results Obtained During Imminent Refueling Outage | |
ML20205N599 | 14 April 1999 | Forwards Questions That Were Transmitted by Fax on 990414 to J Rainsberry of Southern California Corp,In Preparation for Upcoming Telcon on Recirculation Signal/Emergency Feedwater Actuation Signal While Channel in Tripped Condition | |
ML20205M011 | 13 April 1999 | Forwards Questions to Be Discussed in Upcoming Telcon on GL 95-07.Questions Transmitted by Fax on 990413 to J Rrainsberry of SCE | |
ML20205J281 | 6 April 1999 | Notification of 990422 Meeting for Dockets 7200026 & 7200027 with PG&E in Rockville,Md to Dicuss PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon | |
ML20205K462 | 6 April 1999 | Notification of Licensee Meeting with Util on 990422 to Discuss Results of PPR 99-01 | |
IR 05000275/1999301 | 25 March 1999 | Forwards NRC Operator Licensing Exam Repts 50-275/99-301 & 50-323/99-301 for Tests Administered on 990125-28 | |
ML20205B230 | 25 March 1999 | Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990125-28 | Safe Shutdown Unanalyzed Condition Boric Acid Shutdown Margin Reactor Vessel Water Level High Radiation Area Grab sample Missed surveillance Job Performance Measure Process Control Program Earthquake Deep Dose Equivalent Pressure Boundary Leakage Continuous fire watch Hourly Fire Watch Power change Coast down Operability Assessment |
ML20207M340 | 2 March 1999 | Notification of Canceled Meeting Scheduled for 990309 Re 7200026 & 7200027 for PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon | |
ML20207L704 | 2 March 1999 | Notification of 990318 Meeting with SCE in Rockville, Maryland to Discuss SCE Mgt Plans for Future risk-informed License Amend Applications for SONGS | |
ML20207L709 | 2 March 1999 | Notification of 990317 Meeting with SCE in Rockville, Maryland to Discuss Topics Resulting from NRC Staff Review & Confirmatory Analysis of Licensee Request to Remove Hydrogen Control Sys from SONGS Licensing Basis.Meeting Agenda Encl | Severe Accident Management Guideline |
ML20202C393 | 22 January 1999 | Forwards Exam Rept Administered on 981115-20 at San Onofre Nuclear Generating Station,With as Given Written Exam Encl | Shutdown Margin Hydrostatic Temporary Modification Job Performance Measure Offsite Circuit Coast down |
ML20199L340 | 22 January 1999 | Forwards Facility Submitted Outline,Initial Exam & as Given Operating Exam for Test Administered on 981115-20 at San Onofre Nuclear Generation Station | Boric Acid Shutdown Margin Reactor Vessel Water Level High Radiation Area Grab sample Fire impairment Job Performance Measure Power change Downpower |
ML20198M324 | 29 December 1998 | Submits Summary of Telcon Re Proposed Criteria to Support Development of SER Constraints for Reload Analysis Tr,For Plant,Units 2 & 3 | |
ML20155H905 | 3 November 1998 | Notification of 981117 Meeting for Dockets 7200026 & 7200027 with Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage | |
ML20196G648 | 3 November 1998 | Notification of Significant Meeting with Util on 981125 at One White Flint to Discuss Licensee Views on Efforts to Maintain Safety Conscious Work Environ | |
ML20155C962 | 27 October 1998 | Notification of 981124 Meeting with Util to Discuss Results of Employee Concerns Program Survey | |
ML20153B453 | 4 September 1998 | Notification of Cancellation of 980924 Meeting with TVA in Rockville,Md to Discuss Review of Best Estimate of LOCA Methodology at Plant,Unit 2 | |
ML20236Y630 | 8 August 1998 | Forwards Monthly Rept Reflecting Status of 10CFR2.206 Petitions as of 980731.Petitions on Plant GT97494 & GT97339 for Which DD Became Final Actions During Month Were Closed. Portion of Encl Withheld | |
ML20237A001 | 7 August 1998 | Informs That Extension Granted on Envirocare Decision of 980904.Two Week Extension on Philadelphia VA Decision of 980828 Requested.Submits Concurrence of Changes.Rept on 2.206 July Status for Plants Encl | |
ML20236K907 | 7 July 1998 | Notification of 980710 Meeting W/Util,Rescheduled from 980707,in Rockville MD to Discuss Proposed Amend for Extension of Allowed Outage Times for EDG | |
ML20236K302 | 30 June 1998 | Notification of 980707 Meeting W/Util in Rockville,Md to Discuss Licensee Proposed Amend for Extension of Allowed Outage Times for EDG | |
ML20249C272 | 19 June 1998 | Notification of 980707 Meeting W/Util in Arlington,Texas to Discuss SONGS New Security Mgt | |
ML20248M288 | 12 June 1998 | Provides Document That Can Be Referenced as Basis for Opening TAC MA2057 - Humboldt Bay Vent Stack Removal. 10CFR50.59 SE Prepared by PG&E for Addition of New Vent Stack & Removal of Existing Vent Stack Encl | Probabilistic Risk Assessment Earthquake |
ML20249A122 | 11 June 1998 | Forwards Unsolicited Info from San Onofre Licensee Re Emergency Diesel Generator Delegation Allowed Outage Time Extension TS Request | High winds Internal Flooding Probabilistic Risk Assessment Large early release frequency |
ML20249A118 | 11 June 1998 | Notification of 980630 Meeting W/Util in Region IV Office to Discuss Plant Performance Status & Effectiveness of Initiatives to Improve Performance | |
ML20249A562 | 10 June 1998 | Notification of 980615 Meeting W/Util in Rockville,Md to Discuss SONGS Mgt drop-in Visit by Licensee New Manager, Regulatory Affairs | |
ML20248L862 | 9 June 1998 | Forwards May 1998 Rept on Status of Public Petitioners Under 10CFR2.206.Petition on Seabrook (GT970873) for Which DD 98- 03 Became Final Agency Decision on 980413 Closed.Attachment 3 Withheld | |
ML20248K445 | 2 June 1998 | Notification of 980617 Meeting W/Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage.Meeting Agenda Encl | |
ML20248C846 | 29 May 1998 | Notification of 980529 Meeting W/Util in Rockville,Md for Licensee to Present Proposal for Performing Own Reload Analyses | |
ML20248B607 | 26 May 1998 | Notification of Licensee Meeting W/Util on 980528 Re drop-in Visit by Licensee New Manager of Regulatory Affairs for Purpose of Meeting Senior Region IV Mgt | |
ML20216H328 | 15 April 1998 | Notification of 980429 Meeting W/Util in Rockville,Md to Discuss Licensee Proposal for Changing Minimum Tcold for Plant Operation & Performing Own Reload Analyses | |
ML20216D673 | 13 April 1998 | Notification of 980429 Meeting W/Util in Eureka,Ca to Discuss Planned Decommissioning of Humboldt Bay Power Plant | |
ML20247G908 | 7 April 1998 | Discusses Experts Needed for Plant Life Extension Cases,Per 980403 Discussion | |
ML20216G764 | 11 March 1998 | Notification of 980320 Meeting W/Util in Rockville,Md Re PG&E Plans for Removing Sf from Humboldt Bay SFP | |
ML20198J546 | 7 January 1998 | Notification of Licensee Meeting W/Util on 980120 to Discuss Apparent Violations Involving Physical Security Program. Meeting Not Open to Public | |
ML20198F893 | 22 December 1997 | Informs That on 970304,San Onofre,Unit 2,pressurizer Vessel Experienced Cooldown Transient at Rate Greater than 200 F/Hr Limit Specified in Tss.Fracture Mechanics Evaluation of Pressurizer Transient Met Criteria in App G of ASME Code | |
ML20203D432 | 9 December 1997 | Notifies of 971223 Meeting W/Util in Rockville,Md to Discuss Use of Mechanical Nozzle Seal Assemblies as Alternate ASME Code Replacements at Plant | |
ML20199A795 | 7 November 1997 | Notification of Meeting W/Util on 971121 at Plant to Discuss Employee Concerns Program |