Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20196L27420 May 1999Informs That Univ of Wa Did Not Receive Project Funding from State of Wa Legislature for Upcoming Biennium,Which Is from 1999 to 2001.University Intends to Leave Reactor in Current stand-by Status Until Addl Funding Received
ML20155E09420 October 1998Confirms Conference Call of 981013 & 980923 Meetings Re Univ of Washington Research Reactor Decommissioning Project Budget Status.Decommissioning Plan Will Be Amended.Amend Will Be Submitted Prior to Start of First Phase
ML20056A53731 July 1990Responds to 900706 Request for Addl Info Re Decommissioning Univ of Washington Argonaut Reactor.Items Refer to Sections 1.3 & 2.1 of Razebld Decommissioning Plan
ML20246P01129 August 1989Submits Statement of Intent Re Financial Assurance for Decommissioning Reactor.During First Phase of Decommissioning,Reactor Will Be Defueled & Fuel Shipped to DOE Facility.State of Wa Funds Will Be Requested
ML20246F36023 August 1989Forwards Tech Specs for Possession Only License,Revising Tech Specs Transmitted w/890803 Application.Tech Specs Will Go Into Effect When Fuel Removed from Site.Application Requests Security Plan Exemption
ML20245G48410 August 1989Advises That 890803 Application for Amend to License R-73 Should Be Considered as Application for Possession Only,That Tech Specs Be Considered New & Not Revised & That Emergency Plan Be Emergency Plan for Possession Only License
ML20248B7083 August 1989Forwards Application for Proposed Amend 15 to License R-73, Terminating Security Plan & Amended Security Plan.Reactor Defueled & Fuel in Storage Tubes at Univ
ML20247M61223 March 1989Requests That Nuclear Reactor No Longer Required to Meet 10CFR50.64 Requirements Due to Decommissioning Plans & Disposal of High Enrichment Fuel
ML20155F0966 October 1988Forwards Application for Amend to License R-73,removing Surveillance of Rod Drop Times,Shutdown Margin,Reactivity Insertion Rate of Control Rods & Power Calibr of Safety ChannelsShutdown Margin
ML20153B30617 March 1988Forwards Doe,Ofc of Energy Research,Div of Univ & Industry Programs Notifying That Funds for Conversion of Reactor from Highly Enriched U to Low Enriched U Will Not Be Available During FY88
ML20147G96814 January 1988Notifies of Plan to Amend Tech Specs,Changing Drop Time Limit for Shim Rod 3 to 2 Seconds.Change Will Be Requested Due to Gradual Loss of Excess Reactively Caused by Leakage of Water from Fuel Box Gasket & 880104 Event
ML20235U21522 September 1987Responds to NRC Ltr Re Violations Noted in Insp Rept 50-139/87-01.Corrective Actions:Consultation W/Univ Police Dept Has Led to Improvement in Coordination.New Video Cassette Recorder Being Prepared
ML20204B83718 March 1987Advises That,Per Encl DOE to Univ,Availability of Funding for FY87 for Conversion of highly-enriched U to low- Enriched U Withdrawn
ML20133P64723 October 1985Requests Confirmation of Interpretation That Training Reactor Not Required to Have N Stamped Equipment Installed in Thermalhydraulic Circuits.Univ Planning Major Reactor Refurbishing
ML20138G69714 October 1985Ack Receipt of Show Cause Order to Dispose of Highly Enriched U Fuel.Requests Extension Beyond 120 Days,Until DOE Richland Operations Ofc Can Assume Possession
ML20138A09926 September 1985Responds to NRC Re Violations Noted in Insp on 850717-19.Corrective Actions:Evacuation Drills Will Be Held Annually & Written Operator Exams Will Be Held During Last Quarter 1985
ML20140C03524 March 1984FOIA Request for All Physical & Safeguards Insp Repts from 1979 to Present at Ucla,Univ of Washington,Univ of Florida, Virginia Polytechnic Inst & Iowa State Univ