ML20133P647

From kanterella
Jump to navigation Jump to search
Requests Confirmation of Interpretation That Training Reactor Not Required to Have N Stamped Equipment Installed in Thermalhydraulic Circuits.Univ Planning Major Reactor Refurbishing
ML20133P647
Person / Time
Site: 05000139
Issue date: 10/23/1985
From: Robkin M
WASHINGTON, UNIV. OF, SEATTLE, WA
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8511010100
Download: ML20133P647 (1)


Text

..

UNIVERSITY OF WASilINGTON SEATTLE, WASHINGTON 98195 College of Engineering Department of Nuclear Engineering October 23, 1985 Director Office of Nuclear Reactor Regulation U.S.N.R.C.

Washington D.C. 20555

Dear Sir:

The University of Washington Nuclear Engineering Laboratory operates an Argonaut Reactor which is licensed for 100 kilowatts under license R73 (Docket 50-139).

We are in the planning stages of some major refurbishing. The ques-tion has been raised as to whether or not a training reactor such as ours is required to have Instal led only "N" stamped equipment in the thermal-hydraulIcs circuits.

Our interpretation of 10CFR55a is that, sinco we are not operating either a pressurized water reactor or a bollIng water reactor or a power reactor of any sort, we are not required to have "N" stamped equipment.

Wil I you please confirm this Interpretation so that we may more accu-rately estimate the costs of our refurbishing project.

Thanking you in advance for your prompt response to this inquiry, I am Yours truly, ibiW$ff YduW b

Maurice A. Robkin, Ph.D., P.E.

Director Nuclear Engineering Laboratory FD-10 c.c. Mr. Hal Bernard, N.R.C.

851101010085gj39 PDR ADOCK O PDR P

fOW Benson Hall, BF-10 / Telephone: (206) 513-275i

'l*