Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RA-23-0043, Refuel 33 (R2R33) Inservice Inspection Program Ninety Day Owner'S Activity Report and Analytical Evaluations | 30 March 2023 | Refuel 33 (R2R33) Inservice Inspection Program Ninety Day Owner'S Activity Report and Analytical Evaluations | Boric Acid Affidavit |
RA-20-0263, Duke Energy Corp. - Request to Use Provision of Later Edition and Addenda of ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(iv) | 16 September 2020 | Duke Energy Corp. - Request to Use Provision of Later Edition and Addenda of ASME Boiler and Pressure Vessel Code, Section XI for Repair/Replacement Activities in Accordance with 10 CFR 50.55a(g)(4)(iv) | |
ML16056A139 | 11 March 2016 | Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports | |
HNP-15-043, Response to Request for Additional Information 4 Regarding License Amendment Request to Revise Technical Specification Table 3.3-4 Loss of Offsite Power 6.9 Kv Emergency Undervoltage Primary Setpoints | 13 May 2015 | Response to Request for Additional Information #4 Regarding License Amendment Request to Revise Technical Specification Table 3.3-4 Loss of Offsite Power 6.9 Kv Emergency Undervoltage Primary Setpoints | |
ML14307B707 | 10 December 2014 | Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T | Probabilistic Risk Assessment Fukushima Dai-Ichi |
BSEP 13-0071, Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Supplement to Walkdown Report | 31 July 2013 | Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Supplement to Walkdown Report | Unanalyzed Condition Fukushima Dai-Ichi Seismic Walkdown Report |
RA-13-012, Capability to Perform Multi-Unit Dose Assessment | 26 June 2013 | Capability to Perform Multi-Unit Dose Assessment | |
ML13037A204 | 31 January 2013 | Response to Second Request for Additional Information to Support NRC Reactor Systems Branch (Srxb) Technical Review of the CR-3 Extended Power Uprate LAR | Abnormal operational transient Pressure and Temperature Limits Report Power Uprate Measurement Uncertainty Recapture Exclusive Use Affidavit Operational leakage |
ML12185A024 | 25 July 2012 | Incidental Take Limit Met for Green Turtles at Brunswick Steam Electric Plant, Units 1 and 2 | License Renewal |
ML121450014 | 23 May 2012 | NFPA 805 LAR Status Matrix - May 2012 | |
ML11112A122 | 10 June 2011 | Request for Additional Information and Schedule Revision for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application (TAC Nos. ME0274 and ME0278) | Aging Management License Renewal |
ML102910717 | 20 October 2010 | Horizontal Tendons Pages 26-39 | |
ML102040147 | 22 July 2010 | NFPA 805 Pilot License Amendment Request Review Schedule Update, July 2010 | |
ML102030288 | 13 July 2010 | Photograph - Brunswick Graphics and Sample Results | |
ML102030169 | 7 July 2010 | Photos | |
ML102030168 | 7 July 2010 | North Carolina Split Sample Results | |
ML101390126 | 17 May 2010 | Table of Expiration Dates for Permits Associated with Crystal River Unit 3 for Draft Supplemental Environmental Impact Statement | |
ML101390505 | 12 May 2010 | Event Timeline | |
ML102920088 | 17 March 2010 | 8.4 Inadequate Concrete Structure | |
ML102920089 | 17 March 2010 | 9.1 Hurricanes or Tornadoes | |
ML102920090 | 17 March 2010 | 9.2 Seismic Events | Tornado Generated Missile Earthquake Accidental discharge |
ML102920093 | 17 March 2010 | 9.3 Ground Movement | |
ML102870331 | 30 January 2010 | 5.7 Exhibit 7 Winter 2002-2010 | |
ML102870343 | 29 January 2010 | Email - Subject: Detensioning Sequence Spreadsheets | |
ML102720156 | 22 January 2010 | Email from Chou, Rich to Morrissey, Thomas, Dated Friday, January 22, 2010, 5:01 PM Cc Lake, Louis, Sykes, Marvin, Franke, Mark and Reyes, Rogerio; Subject: FW: Ctr Level II Schedule, Attachments: 01-25-10 Level 2 Rev E - 11x17.pdf | |
ML102870630 | 22 January 2010 | Detensioning Sequence - Case 10 | |
ML102870811 | 21 January 2010 | Email - from: Miller, Craig L (Craig.Miller@Pgnmail.Com) to Lake, Louis; Thomas, George; Carrion, Robert; 'Nausdj@Ornl.Gov'; Souther, Martin; 'Trowe@Wje.Com' Cc: Williams, Charles R. Dated Friday, January 22, 2010 8:53 Am Subject: FW: Failu | Boric Acid Coatings |
ML102871175 | 21 January 2010 | 5.3 Maintenance | |
ML102871174 | 21 January 2010 | FW: Ctr Level II Schedule | |
ML102871176 | 20 January 2010 | from: Williams, Charles R. (Charles.Williams@Pgnmail.Com) to: Lake, Louis; Thomas, George Dated Wednesday, January 20, 2010 5:16 PM Subject: FW: 01-21-10 Containment Repair Project Level 3 Schedule Attachments: 01 -21-10 Level 3 Rev D... At | |
ML102880501 | 18 January 2010 | Email - from: Williams, Charles R., to: Lake, Louis; Thomas, George Dated Monday, January 18, 2010 4:18 PM, FW: 01-19-10 Containment Repair Project Level 3 Schedule, Attachments: 01-19-10 Level 3 Rev D - 11x17.pdf | |
ML102880509 | 17 January 2010 | Email - from: Williams, Charles R. to: Lake, Louis, Thomas, George, Dated Sunday, January 17, 2010 9:28 Am, FW: 01-18-10 Containment Repair Prokect Level 3 Schedule, Attachments: 01-18-10 Level 3 Rev D - 11x17.pdf | |
ML102880524 | 16 January 2010 | Email - from: Miller, Craig L (Craig.Miller@Pgnmail.Com) to: Miller, Craig L; Lake, Louis; Thomas, George; Carrion, Robert; 'Trowe@Wje.Com' Cc: Williams, Charles R. Dated Saturday, January 16, 2010 1:15 PM Subject: Failure Mode 5.1 for Revi | Coatings |
ML102880513 | 16 January 2010 | Email - from: Miller, Craig L (Craig.Miller@Pgnmail.Com) to: Lake, Louis; Thomas, George; Carrion, Robert; 'Trowe@Wje.Com'; Sealey, Mac Cc: Williams, Charles R. Dated Saturday, January 16, 2010 1:24 PM, Failure Mode 2.6 for Review .. | |
ML102870916 | 14 January 2010 | Email - from: Williams, Charles R. (Charles.Williams@Pgnmail.Com) to Lake, Louis; Thomas, George Dated Thursday, January 14, 2010 3:28 PM Subject: FW: 01-15-10 Containment Repair Project Level 3 Schedule | |
ML102870917 | 14 January 2010 | Email - from: Williams, Charles R. (Charles.Williams@Pgnmail.Com) to: Lake, Louis; Thomas, George Dated Thursday, January 14, 2010 7:16 Am Subject: FW: 01-14-10 Containment Repair Project Level 3 Schedule | |
ML102870920 | 13 January 2010 | 5.1 Contamination During Construction | |
ML102870926 | 13 January 2010 | Email - from: Williams, Charles R. to Lake, Louis; Thomas, George (Charles.Williams@Pgnmail.Com) Dated Wednesday, January 13, 2010 10:46 Am Subject: FW: 01-13-10 Containment Repair Project Level 3 Schedule | |
ML101930550 | 1 January 2010 | 10CFR50.75g File: Spreadsheet Groundwater.Xls BSEP Well Samples | |
ML102910583 | 28 December 2009 | Engg Repair Work Flow 12-28-09.pdf | |
ML102910613 | 22 December 2009 | Email-From: Orf, Tracy to Lake, Louis Dated Tuesday, December 22, 2009 6:31 Am Subject:Fw CR3 Updated Root Cause Information Attachments: 2009 Dec 18 - Root Cause Update for Nrc. Pptx | |
ML102720446 | 8 December 2009 | 3.4 Exhibit 7, Petrographic Report | Coatings |
ML101170819 | 3 December 2009 | Root Cause Analysis - PII Metrics as of Dec 3rd 2009 | |
ML102720452 | 3 December 2009 | 2.2 Exhibit 3, Concrete Pour Data | |
ML102720445 | 3 December 2009 | 2.11 Concrete Pour Data | |
ML102871177 | 23 November 2009 | 8.1 and 8.5 | |
ML102880487 | 23 November 2009 | 3.1 Inadequate Air Content | |
ML093240058 | 19 November 2009 | NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, November, 2009 | |
ML102910671 | 30 October 2009 | 2009 Oct 30 - Root Cause Analysis Metrics.Pptx | |
ML091760359 | 25 June 2009 | NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, June 2009 |