ML102910583

From kanterella
Jump to navigation Jump to search
Engg Repair Work Flow 12-28-09.pdf
ML102910583
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/28/2009
From:
Progress Energy Co
To:
Office of Information Services
References
FOIA/PA-2010-0116
Download: ML102910583 (1)


Text

I Revision - Dec 281h 2009 En gineering & Repair Wo rk Flow A S&L Deca Calc: Remval Loss of Hea Load fuel (date TBD)

V Indicates Completed Task Decay Heat Removal (for fuel load) A EC 75218 Rev SGT Engineering & SGT Engineering &

Construction Input Construction Input (Repair Preparations) (Permanent Repair)

V/

MPR Tendon Analysis Sequence I.I Reinforcement Re-ensioning

&Concrete & Post-Repair

'I Placement Testing

, ~PermanentReL~air L -------------------------------

I

~2Progress Energy