ML102910583

From kanterella
Jump to navigation Jump to search
Engg Repair Work Flow 12-28-09.pdf
ML102910583
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/28/2009
From:
Progress Energy Co
To:
Office of Information Services
References
FOIA/PA-2010-0116
Download: ML102910583 (1)


Text

I Revision - Dec 281h 2009 En gineering & Repair Wo rk Flow V Indicates Completed Task SGT Engineering &

Construction Input (Repair Preparations)

V/

A S&L Calc: Loss of Deca Hea Remval Load fuel (date TBD)

Decay Heat Removal A EC 75218 Rev (for fuel load)

SGT Engineering &

Construction Input (Permanent Repair)

MPR Tendon Analysis Sequence I.I Rein forcement Re-ensioning

&Concrete

& Post-Repair

'I Placement Testing

~Permanent ReL~air L

~2Progress Energy I