Category:E-Mail
MONTHYEARML24191A4232024-07-0303 July 2024 RAI2 NRC Response to Fws ESA Crystal River Unit 3 LTP ML24190A1382024-06-18018 June 2024 Supplement to NRC Request for Concurrence with ESA Determinations for Crystal River Unit 3 LTP ML24170A9242024-06-18018 June 2024 024-0023697 Crystal River License Termination Plan Unit 3 ML24143A0242024-05-20020 May 2024 Draft EA for Crystal River Unit 3 Opportunity for Flhealth Review and Comment ML24143A0132024-05-20020 May 2024 Achp Response for Crystal River Unit 3 (Achp Project No. 020794) ML24143A0212024-05-20020 May 2024 SHPO Response to Initiate Section 106 Consultation for Crystal River Unit 3 ML24120A3312024-04-24024 April 2024 Seminole Tribe of Florida Email - Initiation ML24054A6462024-02-29029 February 2024 Request for RAI Extension Related to the Crystal River License Termination Plan ML24060A0862024-02-29029 February 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Crystal River Unit 3 Nuclear Generating Plant License Termination Plan (Consultation Code: 2024-0023697) ML24025A0952024-01-24024 January 2024 Clarifications Related to the NRC Staffs EA for Crystal River ML23180A0562023-06-13013 June 2023 ADP-CR3, Crystal River Unit 3 Email from J. Jernigan to Tim Barvitskie Confirmation That Enclosure 22 Radiological Groundwater Characterization Report ML21117A2902021-04-26026 April 2021 Acceptance of License Amendment Request Related to the ISFSI-Only Physical Securityplan ML21096A0432021-04-0505 April 2021 Acceptance of License Amendment Request Related to the ISFSI-Only Emergency Plan ML19344C8052019-11-12012 November 2019 Response from NEIMA Local Community Advisory Board Questionnaire 11-12-2019 H Danenhower ML19310D8602019-10-24024 October 2019 E-Mail Dated October 24, 2019, from Mark Vansicklen, Duke Energy Florida, to John Hickman, NRC, Providing Background Information for the Crystal River Partial Site Release Request ML19344C7872019-10-0303 October 2019 Response from NEIMA Local Community Advisory Board Questionnaire 10-03-2019 D Taylor ML19310D8212019-09-13013 September 2019 E-Mail Dated September 13, 2019, from John Hickman, NRC, to Mark Vansicklen, Duke Energy Florida, Requesting Background Information for the Crystal River Partial Site Release Request ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition ML19071A0662019-03-0606 March 2019 E-Mail Dated 3/6/2019 from John Hickman, NRC, to Phyllis Dixon, Duke Energy Florida, LLC, Regarding NRC Acceptance Review of a Request to Revise the ISFSI Only Emergency Plan for Crystal River Unit 3 ML19070A3112019-03-0606 March 2019 Document Title or Accession No. E-Mail Dated 3/6/2019 from John Hickman, NRC, to Phyllis Dixon, Duke Energy Florida, LLC, Regarding NRC Acceptance Review of Partial Site Release Request for Crystal River Unit 3 ML18263A1462018-09-11011 September 2018 NRR E-mail Capture - Logbook Entry: 09/11/2018 a Kemp'S Ridley Sea Turtle (Federal Endangered Species) Carcass Was Recovered from the Crystal River Energy Complex Unit 2 Fossil Unit ML16054A2402015-12-10010 December 2015 E-44108 Attachment 10 E-mail from Steven Edwards (Due Energy) to Don Shaw (Areva) for Brunswick Nuclear Plant, Oconee Nuclear Station, and Robinson Nuclear Plant ML15176A2692015-06-25025 June 2015 NRR E-mail Capture - NRC Acceptance Review for LAR #317 Regarding Changes in Managment Titles ML15043A1042015-02-0505 February 2015 NRR E-mail Capture - Mf Crystal River TAC ML15015A6722015-01-15015 January 2015 NRR E-mail Capture - NRC Acceptance Review for LAR - Application for Order Approving Transfer of License and for Conforming License Amendment ML14344A9992014-12-0909 December 2014 NRR E-mail Capture - Severe Weather Exemption ML14258A7432014-09-0505 September 2014 NRR E-mail Capture - FW: Comparison of Crystal River'S Exemption Secy Paper with Kewaunee'S ML14290A1992014-08-27027 August 2014 NRR E-mail Capture - Draft RAIs for Ep/Eal LAR ML14163A2512014-06-0303 June 2014 NRR E-mail Capture - Request for Additional Information - Exemption for Conducting Annual force-on-force Exercises ML14153A0842014-05-29029 May 2014 NRR E-mail Capture - Logbook Entry: 05/29/2014 ML14153A6912014-05-21021 May 2014 NRR E-mail Capture - Request for Additional Information - Decommissionign Trust Fund Exemption Request ML14132A2052014-05-0909 May 2014 NRR E-mail Capture - MF3089 - Defueled TS Amendment Request for Additrional Information ML14114A2792014-04-10010 April 2014 NRR E-mail Capture - MF3089 Defueled TS Request for Additional Information ML14113A3632014-04-10010 April 2014 NRR E-mail Capture - MF3415/MF2981 RAI on EP Exemptions, EAL Scheme Change and E Plan Amendment ML14118A2872014-02-20020 February 2014 NRR E-mail Capture - Request for Additional Information: Exemptions to the Radiological Emergency Plan Requirements ML14045A0012014-02-12012 February 2014 NRR E-mail Capture - RAI: Adminstrative Controls ML14031A1752014-01-27027 January 2014 NRR E-mail Capture - CR3 Certified Fuel Handler Training and Retraining Program Approval - RAI Request ML14017A0772014-01-16016 January 2014 NRR E-mail Capture - Brunswick 1 and 2, Crystal River Unit 3, Harris Unit 1, and Robinson Unit 2 - Acceptance for Review of License Amendment Request for Cyber Security Plan Implementaion Milestone 8 (TAC Nos. MF3263 - MF3267) ML14027A0332013-12-16016 December 2013 NRR E-mail Capture - Eplan and EAL Scheme Change Request for Additional Information (LAR #315) ML13336A9112013-12-0202 December 2013 NRR E-mail Capture - Periodic Update to the Crystal River 3 Containment Petition ML13198A1422013-07-17017 July 2013 NRR E-mail Capture - Draft RAI - Request to Amend Section 5.0 of the CR-3 Technical Specifications (MF1504) ML13157A2062013-05-31031 May 2013 NRR E-mail Capture - Logbook Entry: 5/31/2013 ML13155A2062013-05-29029 May 2013 NRR E-mail Capture - Petition Status Update - Containment for Crystal River ML13120A0412013-04-29029 April 2013 NRR E-mail Capture - Status Update for Petition on Crystal River 3 ML13095A4002013-04-0505 April 2013 E-mail - Acceptance of Requested Licensing Action Change of Licensee Name ML13052A2402013-02-0808 February 2013 LTR-13-0131 - E-mail Tom Gurdziel Concerns Crystal River, Unit 3 ML13015A2832013-01-14014 January 2013 NRR E-mail Capture - Status of 10 CFR 2.206 Petition Related to Crystal River 3 ML13011A1482013-01-10010 January 2013 NRR E-mail Capture - CR-3 EPU LAR - Additional RAI from Eeeb (ME6527) ML12304A0682012-10-26026 October 2012 NRR E-mail Capture - RAIs Regarding Crystal River 30-day Report for ECCS Model Changes Pursuant to 10 CFR 50.46 Requirements (ME8408) ML12297A3922012-10-23023 October 2012 NRR E-mail Capture - Draft Bypass Test Plan 2024-07-03
[Table view] Category:Graphics incl Charts and Tables
MONTHYEARML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports RA-13-012, Capability to Perform Multi-Unit Dose Assessment2013-06-26026 June 2013 Capability to Perform Multi-Unit Dose Assessment ML13037A2042013-01-31031 January 2013 Response to Second Request for Additional Information to Support NRC Reactor Systems Branch (Srxb) Technical Review of the CR-3 Extended Power Uprate LAR ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML11112A1222011-06-10010 June 2011 Request for Additional Information and Schedule Revision for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application (TAC Nos. ME0274 and ME0278) ML1029107172010-10-20020 October 2010 Horizontal Tendons Pages 26-39 ML1013901262010-05-17017 May 2010 Table of Expiration Dates for Permits Associated with Crystal River Unit 3 for Draft Supplemental Environmental Impact Statement ML1029200902010-03-17017 March 2010 9.2 Seismic Events ML1029200892010-03-17017 March 2010 9.1 Hurricanes or Tornadoes ML1029200882010-03-17017 March 2010 8.4 Inadequate Concrete Structure ML1029200932010-03-17017 March 2010 9.3 Ground Movement ML1028703312010-01-30030 January 2010 5.7 Exhibit 7 Winter 2002-2010 ML1028703432010-01-29029 January 2010 Email - Subject: Detensioning Sequence Spreadsheets ML1027201562010-01-22022 January 2010 Email from Chou, Rich to Morrissey, Thomas, Dated Friday, January 22, 2010, 5:01 PM Cc Lake, Louis, Sykes, Marvin, Franke, Mark and Reyes, Rogerio; Subject: FW: Ctr Level II Schedule, Attachments: 01-25-10 Level 2 Rev E - 11x17.pdf ML1028706302010-01-22022 January 2010 Detensioning Sequence - Case 10 ML1028711742010-01-21021 January 2010 FW: Ctr Level II Schedule ML1028708112010-01-21021 January 2010 Email - from: Miller, Craig L (Craig.Miller@Pgnmail.Com) to Lake, Louis; Thomas, George; Carrion, Robert; 'Nausdj@Ornl.Gov'; Souther, Martin; 'Trowe@Wje.Com' Cc: Williams, Charles R. Dated Friday, January 22, 2010 8:53 Am Subject: FW: Failu ML1028711752010-01-21021 January 2010 5.3 Maintenance ML1028711762010-01-20020 January 2010 from: Williams, Charles R. (Charles.Williams@Pgnmail.Com) to: Lake, Louis; Thomas, George Dated Wednesday, January 20, 2010 5:16 PM Subject: FW: 01-21-10 Containment Repair Project Level 3 Schedule Attachments: 01 -21-10 Level 3 Rev D... At ML1028805012010-01-18018 January 2010 Email - from: Williams, Charles R., to: Lake, Louis; Thomas, George Dated Monday, January 18, 2010 4:18 PM, FW: 01-19-10 Containment Repair Project Level 3 Schedule, Attachments: 01-19-10 Level 3 Rev D - 11x17.pdf ML1028805092010-01-17017 January 2010 Email - from: Williams, Charles R. to: Lake, Louis, Thomas, George, Dated Sunday, January 17, 2010 9:28 Am, FW: 01-18-10 Containment Repair Prokect Level 3 Schedule, Attachments: 01-18-10 Level 3 Rev D - 11x17.pdf ML1028805132010-01-16016 January 2010 Email - from: Miller, Craig L (Craig.Miller@Pgnmail.Com) to: Lake, Louis; Thomas, George; Carrion, Robert; 'Trowe@Wje.Com'; Sealey, Mac Cc: Williams, Charles R. Dated Saturday, January 16, 2010 1:24 PM, Failure Mode 2.6 for Review .. ML1028805242010-01-16016 January 2010 Email - from: Miller, Craig L (Craig.Miller@Pgnmail.Com) to: Miller, Craig L; Lake, Louis; Thomas, George; Carrion, Robert; 'Trowe@Wje.Com' Cc: Williams, Charles R. Dated Saturday, January 16, 2010 1:15 PM Subject: Failure Mode 5.1 for Revi ML1028709172010-01-14014 January 2010 Email - from: Williams, Charles R. (Charles.Williams@Pgnmail.Com) to: Lake, Louis; Thomas, George Dated Thursday, January 14, 2010 7:16 Am Subject: FW: 01-14-10 Containment Repair Project Level 3 Schedule ML1028709162010-01-14014 January 2010 Email - from: Williams, Charles R. (Charles.Williams@Pgnmail.Com) to Lake, Louis; Thomas, George Dated Thursday, January 14, 2010 3:28 PM Subject: FW: 01-15-10 Containment Repair Project Level 3 Schedule ML1028709202010-01-13013 January 2010 5.1 Contamination During Construction ML1028709262010-01-13013 January 2010 Email - from: Williams, Charles R. to Lake, Louis; Thomas, George (Charles.Williams@Pgnmail.Com) Dated Wednesday, January 13, 2010 10:46 Am Subject: FW: 01-13-10 Containment Repair Project Level 3 Schedule ML1029105832009-12-28028 December 2009 Engg Repair Work Flow 12-28-09.pdf ML1029106132009-12-22022 December 2009 Email-From: Orf, Tracy to Lake, Louis Dated Tuesday, December 22, 2009 6:31 Am Subject:Fw CR3 Updated Root Cause Information Attachments: 2009 Dec 18 - Root Cause Update for Nrc. Pptx ML1027204462009-12-0808 December 2009 3.4 Exhibit 7, Petrographic Report ML1027204522009-12-0303 December 2009 2.2 Exhibit 3, Concrete Pour Data ML1027204452009-12-0303 December 2009 2.11 Concrete Pour Data ML1011708192009-12-0303 December 2009 Root Cause Analysis - PII Metrics as of Dec 3rd 2009 ML1028804872009-11-23023 November 2009 3.1 Inadequate Air Content ML1028711772009-11-23023 November 2009 8.1 and 8.5 ML1029106712009-10-30030 October 2009 2009 Oct 30 - Root Cause Analysis Metrics.Pptx ML1027300782009-01-25025 January 2009 2.5 Exhibit 1, Ambient and Concrete Temp in Buttresses 3-4 ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0529902932005-10-19019 October 2005 FAQ Log 10/19/2005 ML0613806832005-09-30030 September 2005 Operating Revenues Vs. Operating Expenses; Intergovernmental Transfers; Long-Term Debt; General Fuel Mix; Customer Class Composition; Total Retail Sales; Total Energy Sales 3F1104-05, 10CFR50.46 Loss-Of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report2004-11-17017 November 2004 10CFR50.46 Loss-Of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report ML0209405042002-04-0303 April 2002 Attachment to Letter Crystal River Unit 3 - Table for OTSG Post-Inspection Phone Call and Drawings 2016-03-11
[Table view] |