Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20211H51131 August 1999Non-proprietary Rev 1 to MPR-1820(NP), TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis
ML20210R47913 August 1999Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2Decommissioning Funding Plan
Fire Protection Program
ML20210K7659 July 1999Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp Loca
ML20209G00731 March 1999Submittal-Only Screening Review of Three Mile Island,Unit 1 Individual Plant Exam for External Events (Seismic Portion)Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
Seismically rugged
Earthquake
Weak link
ML20236W9969 June 19981998 Quadrennial Simulator Certification Rept
ML20210P44631 August 1997Update 2 to TMI-2 Post-Defueling Monitored Storage Sar
ML20210T34131 August 1997Rev 0 to TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis
ML20199E58418 August 1997Limited Liability Company Agreement of Amergen Energy Co, LLC Among PECO Energy Co,British Energy PLC & British Energy,Inc
ML20133D87723 December 1996Rev 2 to TMI-1 Evaluation of Thermo-Lag Fire BarriersSafe Shutdown
Fire Barrier
Exemption Request
Fire Protection Program
ML20137F13027 August 1996Rev 0 to Auxiliary Bldg Sump Sludge Prevention (Regulatory Required)Fire Barrier
Coatings
ML20117H66220 July 1996Rev 1 to TR 094 TMI-1 Evaluation of Thermo-Lag Fire BarriersSafe Shutdown
Fire Barrier
Exemption Request
Fire Protection Program
ML20129G92917 June 1996TMI-1 Reload Design & Setpoint MethodologyShutdown Margin
Anticipated operational occurrence
Fuel cladding
ML20148F0612 April 1996Rev 0 to SQ-TI-EG-T-0001B-1, EDG 1B Air Start 1 Reservior
ML20148F0832 April 1996Rev 0 to EDG 1B Air Start 2 Reservoir Tank
ML20098B12919 September 1995Rev 1 to Pages 3 & 30 of TMI-1 USI A-46 Seismic Evaluation ReptSafe Shutdown
ML20100L65825 May 1995Div 1/2 Mod Design Description for New TMI-1 Radwaste Demineralizer Sys Three Mile Island Unit 1,Nuclear Generating Station, Rev 2High Radiation Area
Earthquake
ML20087J52811 May 1995Nonproprietary Page 2 of TMI Unit 1 USI A-46 Seismic Evaluation Rept
ML20082G41922 March 1995Rev 0 to Topical Rept 093, TMI-1 Reactor Bldg Twenty Yr Tendon Surveillance (Insp Period 6)
ML20082Q80510 March 1995TMI-1 Core Thermal-Hydraulic Methodology Using VIPRE-01 Computer CodeShutdown Margin
Coast down
ML20082G44422 February 1995Vols I & II 20th Yr Physical Surveillance of TMI-1 Containment Bldg
ML20100L6323 August 1994Shipment of Miscellaneous Waste Evaporator ConcentratesInternal Flooding
Process Control Program
ML20059M21830 November 1993Amend 19 to Pdms Sar
ML20148F09328 October 1993Rev 0 to Air Accumulator for FW-V-16A
ML20148F10128 October 1993Rev 0 to Air Accumulator for FW-V-16B
ML20059F04731 August 1993Amend 18 to Post-Defueling Monitored Storage (Pdms) Sar. W/Rev 2 to List of Pdms Requirements & Commitments
ML20056E59231 July 1993Conservative Design In-Structure Response Spectra for Resolution of USI A-46 for Tmi,Unit 1Safe Shutdown Earthquake
Operating Basis Earthquake
ML20059D7357 February 1993Review of Offsite Response to Site Area Emergency Incident at Three Mile Island Nuclear StationSafe Shutdown
Minimum staff
ML20126D28318 December 1992Criticality SAR for TMI-2 Reactor Vessel
ML20114B9638 August 1992Rev 3 to Criticality Safety Evaluation of TMI Fuel Storage Facilities W/Fuel of 5% Enrichment
ML20058F65631 July 1992Companion Sample Exams
ML20058F64831 January 1992Metallographic & Hardness Exams of TMI-2 Lower Pressure Vessel Head Samples
ML20066K35931 January 1991Rev 0 to Rept on 1990 Eddy Current Exams of TMI-1 OTSG Tubing
ML20216K12531 October 1990Amend 9 to Post-Defueling Monitored Storage SarSafe Shutdown
Boric Acid
Hydrostatic
Locked High Radiation Area
Tornado Generated Missile
Earthquake
Fire Protection Program
ML20217A42511 September 1990Rev 3 to Licensing Rept for Spent Fuel Pool Mod of Pool a: TMI Unit I
ML20058M7251 August 1990Rev 2 to Div Technical Evaluation Rept for Processed Water Disposal Sys
ML20056A00926 July 1990TMI-1 Trust Agreements
ML20043A2342 May 1990Rev 0 to TMI-1 Reactor Bldg 15-Yr Tendon Surveillance (Insp Period 5).
ML20055C94631 March 1990Final Rept, TMI - Unit 2 Safety Advisory Board, for Mar 1981 - Dec 1989
ML17347B46231 December 1989App a to USI A-46 & Generic Ltr 87-02.Safe Shutdown
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Earthquake
Backfit
ML20247R63712 September 1989Submerged Demineralizer Sys
ML20246H94025 August 1989Corrected Pages 5-10 Through 5-18 & 5-26 to Rev 1 to Defueling Completion Rept,Second Submittal
ML20246E10218 August 1989Portion of Rev 1 to, Defueling Completion ReptBoric Acid
Coatings
ML20246G11615 August 1989Rev 0 to SER for Removal of Metallurgical Samples from TMI-2 Reactor Vessel, Safety AnalysisUnanalyzed Condition
Boric Acid
Fire Protection Program
ML20246D68714 August 1989Rev 1 to Criticality Analysis of Byron & Braidwood Station High Density Fuel Racks
ML20247J22531 July 1989Rev 7 to Div Sys Description for Auxiliary Bldg Emergency Liquid Cleanup Sys (Epicor II)Boric Acid
Loop seal
Grab sample
ML18008A03131 July 1989NTH-TR-01 Decrease in Heat Removal by Secondary Sys.Safe Shutdown
Rod Drop Event
ML19327B40131 July 1989Safety Evaluation for Byron/Braidwood Stations Units 1 & 2 Transition to Westinghouse 17 X 17 Vantage 5 Fuel.
ML20246E3485 July 1989Rev 0 to TMI-2 Defueling Completion Rept
ML20247H07130 June 1989Description & Verification Summary of Computer Program, GappipeEarthquake
ML20246D67130 June 1989Criticality Analysis of Byron/Braidwood Fresh Fuel Racks