Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20199K974 | 30 November 1997 | Brief Aerial Photography Analysis of RBS at St Francisville,LA:1996-1997 | |
ML20135C195 | 31 October 1996 | Brief Aerial Photography Analysis of River Bend Station at St Francisville,LA:1995-1996 | |
ML20134H179 | 30 June 1996 | Rev 2 Suppl Reload Licensing Rept for RBS Reload 6,Cycle 7 | Shutdown Margin Anticipated operational occurrence |
ML20117H287 | 30 June 1996 | Common Cause Assessment of Refuel Operations at River Bend Station | |
ML20096F235 | 30 November 1995 | Brief Aerial Photography Analysis of River Bend Station at St Francisville,LA:1994-1995 | |
ML20100F319 | 30 November 1995 | Suppl Reload Licensing Rept for RBS Reload 6,Cycle 7 | Shutdown Margin Anticipated operational occurrence |
ML20129E298 | 31 May 1995 | Final BNL Technical Rept, Metallurgical Evaluation of FW Nozzle to Safe-End Weld from River Bend Station Unit 1 | Non-Destructive Examination |
ML20086C437 | 31 May 1995 | Draft, Metallurgical Evaluation of Feedwater Nozzle to Safe-End Weld from River Bend Station,Unit 1 | Non-Destructive Examination |
ML20080B396 | 30 November 1994 | Brief Aerial Photography Analysis of River Bend Station at St Francisville,LA:1993-94 | |
ML20078C788 | 30 June 1994 | Revised Semi-Annual Rept on Fitness-For-Duty Program, for Reporting Period of 940101-0630 | |
ML18010B084 | 5 May 1993 | NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. | Safe Shutdown Boric Acid Shutdown Margin Loop seal Stroke time Temporary Modification Stress corrosion cracking Liquid penetrant Overspeed trip |
ML20128N327 | 17 February 1993 | Rev 0 to EA-PT-0003-S2, Responses to NRC Questions on River Bend Station Plant Transient Analysis Methodology, Suppl 1,EA-PT-91-0003-SP | Stroke time Feedwater Controller Failure |
ML18010A952 | 30 November 1992 | NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. | Nondestructive Examination Liquid penetrant |
ML20101R069 | 8 June 1992 | Rev 92-6 to Approved Vendors List Matl Mfgs & Suppliers of ASME Section III Matl & Subcontracted Svcs | |
ML20094P269 | 31 March 1992 | Rev 0 to EA-CA-91-0001-S2, Steady State Core Physics Methods for BWR Design & Analysis, App G | Shutdown Margin |
ML20091J516 | 31 January 1992 | Rev 0 to Steady State Core Physics Methods for BWR Design & Analysis | Shutdown Margin Power change |
ML20079P121 | 31 October 1991 | Suppl 1 to Nonproprietary River Bend Station Plant Station Plant Transient Analysis Methodology - Delta CPR Methodology & Addl Benchmarks | Stroke time Anticipated operational occurrence Feedwater Controller Failure |
RS-91-137, Rev 0 to RCIC Reliability Analysis,River Bend Nuclear Station | 10 September 1991 | Rev 0 to RCIC Reliability Analysis,River Bend Nuclear Station | Packing leak Probabilistic Risk Assessment |
ML20091C539 | 31 July 1991 | Technical Justification for Eliminating Mid-Cycle Insp of Feedwater Nozzle (N4A) to Safe-End Weld Indication at River Bend Plant | |
ML20077A461 | 30 April 1991 | Transient Analysis Methodology | Anticipated operational occurrence Fuel cladding |
ML20072T657 | 31 March 1991 | Rev 1 to Bounding Evaluation for River Bend 1 Heatup Rate Event | |
ML20072P988 | 15 November 1990 | Draft Reassessment of Indication in Riverbend Feedwater Nozzle (N4A) to Safe End Weld | |
ML20043A905 | 31 March 1990 | Rev 1 to Implementation of Reg Guide 1.99,Rev 2 for River Bend Station,Unit 1. | Hydrostatic |
ML20247J941 | 9 February 1989 | Analyses of Components in Asco Solenoid Valve | |
ML20043A906 | 30 June 1988 | Flux Wire Dosimeter Evaluation for River Bend Station. | |
ML20149J411 | 29 February 1988 | IE Bulletin Program Rept | Stroke time Hydrostatic Anchor Darling Liquid penetrant |
ML17279A191 | 7 April 1987 | Comparision of Electrical Design of Wye Pattern Globe Valve Actuator W/Ball Valve,Hanford 2 & River Bend Design. Five Oversize Drawings Encl | |
ML20203N417 | 30 April 1986 | Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications | Nondestructive Examination Liquid penetrant |
ML20141M857 | 28 January 1986 | Investigation,Analysis & Corrective Action for River Bend Station,860101 Loss of Offsite Power | Scram Discharge Volume |
ML20137H209 | 31 August 1985 | Suppl 3 to Preliminary Equipment Survivability | |
ML20134G961 | 31 August 1985 | Revised Stuck Open Relief Valve Base Case | |
ML20134G968 | 31 August 1985 | Suppl 2 to Preliminary Equipment Survivability Rept | |
ML20134H166 | 31 August 1985 | Equipment Survivability Enhancement | |
ML20129E908 | 31 July 1985 | Hydrogen Deflagration Pressure Effects on Equipment | |
ML20129F097 | 31 July 1985 | Revised Drywell Break Base Case Analysis | |
ML20128H458 | 31 July 1985 | Preliminary Equipment Survivability Rept,River Bend Station Unit 1,Jul 1985 | Fuel cladding |
ML20128L940 | 30 June 1985 | Reg Guide 1.97,Rev 3 Compliance Rept | Ultimate heat sink Squib Fuel cladding |
ML20127K603 | 1 June 1985 | Operational Safety of Tdi DSR-48 Emergency Diesel Generator Crankshafts at River Bend Station,Gulf States Utils | |
ML20125C460 | 31 May 1985 | Dcrdr Summary Rept Suppl | Emergency Lighting Scram Discharge Volume |
ML20127K708 | 18 May 1985 | Evaluation of DSR-48 Emergency Diesel Generator Crankshafts at River Bend Station | Liquid penetrant |
ML20117A563 | 30 April 1985 | Design & Computer Analysis of Siren Prompt Notification Sys River Bend Station | |
ML20111C550 | 28 February 1985 | Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept | Earthquake Liquid penetrant Loctite |
ML20107H172 | 15 February 1985 | Rev 0 to High Energy Line Break Evaluation Rept (Effect on Nonsafety-Related Control Components) | |
ML20101M609 | 31 December 1984 | Vols I-IV of Tdi Diesel Generator Design Review & Quality Revalidation Rept | Coatings Temporary Modification Earthquake Liquid penetrant Loctite |
ML20100N270 | 20 November 1984 | Rev 1 to IE Bulletin 79-27 Study,Rept of Findings for River Bend Station Unit 1 | Squib Power change |
ML20099H376 | 31 October 1984 | Detailed Control Room Design Review,Methodology & Approach, Human Engineering Discrepancy Results, Summary Rept | Safe Shutdown Reactor Vessel Water Level |
ML20100N414 | 31 October 1984 | Common Sensor Failure Evaluation Rept | |
ML20100N412 | 31 October 1984 | Control Sys Failures Evaluation Rept | |
ML20093M712 | 8 October 1984 | Gulf States Util Co Position Re Safety/Relief Valve Discharge Testing at River Bend Station | |
ML20093D186 | 9 July 1984 | Seismic OBE & SSE Required Response Spectra for Auxiliary, Control,Diesel Generator,Fuel,Turbine,Pipe Tunnels 1 & 2 & Standby Svc Water Pumphouse & Cooling Tower Bldg |