ML20078C788
| ML20078C788 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 06/30/1994 |
| From: | Durika W ENTERGY OPERATIONS, INC. |
| To: | |
| Shared Package | |
| ML20078C649 | List: |
| References | |
| NUDOCS 9411010330 | |
| Download: ML20078C788 (3) | |
Text
'
Fitnoss for Duty Progrcm Performance Data Personnel Subject to 10CFR26 (Revision 1) l1 2
I l
Entercy Operations, Inc.
June 30, 1994 l
l Company 6 Months Ending l 1
I l3 l
l River Bend Station /St. Francisville, LA l
l Location l
l l
l4 5
l l
William G.
Durika (504) 381-4328 l
l Contact Name Phone Number l
I I
l6 l
l l
Appendix A to 10CFR26 l
l Cutoffs:
Screen / Confirmation (ng/ml) l_l l
l l
Marijuana 100/15 Barbiturates 300/300 l
l 1
l Cocaine 300/150 Methaqualone 300/100 l
l l
l Opiates 300/300 Methadone 300/300 l
l l
l Phencyclidine 25/25 Benzodiazepines 300/300 l
l 1
l Amphetamines 1000/500 Alcohol 0.04%BAC/0.04%BAC l
I I
l l
l Long-Term l
Short-Term l
l Testina Results I Licensee Employees l Contractor Personnel l Contractor Personnel l l
Average Number with l
lXXXXXXXXXXXXXXXXXXXXXXlXXXXXXXXXXXXXXXXXXXXl l Unescorted' Access 7 l
- 2001 lXXXXXXXXXXXXXXXXXXXXXXlXXXXXXXXXXXXXXXXXXXXl l
l I
I I
I I
I l
Categories 8 l Tested i Positive l Tested l
Positive l Tested l Positive l l
l l
l l
lXXXXXXXXXlXXXXXXXXXXl l
Pre-Access l
96 1
0 l
1254 l
17 IXXXXXXXXXlXXXXXXXXXXl l
l l
l l
l lXXXXXXXXXlXXXXXXXXXXl l
For l Post Accident l
0 l
0 l
4 l
0 lXXXXXXXXXlXXXXXXXXXXl l
l l
l l
l lXXXXXXXXXlXXXXXXXXXXl l Cause lObnerved Behavior l 2
1 0
l 4
l 2
lXXXXXXXXXlXXXXXXXXXXl l
l l
l l
lXXXXXXXXXlXXXXXXXXXXl l
Random I
344 1
0 l
317 1
0 lXXXXXXXXXlXXXXXXXXXXl l
l l
l l
lXXXXXXXXXlXXXXXXXXXXl j
l Follow-up I
3 1
0 l
12 l
O
!XXXXXXXXXlXXXXXXXXXXl 4
l l
l l
l lXXXXXXXXXlXXXXXXXXXXl Pre-employment l
0 l
0 l
3 O
lXXXXXXXXXlXXXXXXXXXXl l
l l
l l
lXXXXXXXXXlXXXXXXXXXXl l Other i
4 1
0 l
0 l
0 IXXXXXXXXXlXXXXXXXXXXl l
l l
l l
lXXXXXXXXXlXXXXXXXXXXl l
l Total l
449 l
0 l
1594 l
19 lXXXXXXXXXlXXXXXXXXXXl
- Lonj & short term contract personnel included in this number 9411010~v0 941024 AngCK 05000459 PUR R
i PDR
Breakdown of Confirmed Positive for. Specific Substances (Revision 1) l9 l
l l
l Ampheta-l Phency-l l Refusal l l
l l
l l
lMariiuanal Cocaine ! Opiates I tamines I clidine ! Alcohol I to Test l 1 l 2 I3 l 4 l 1
I I
i l
l I
I I
I I
I i
l Licensee Employees l
0 1
0 1
0 1
0 l
0 1
0 1
0 l
l l
l l
l l
l l
1 1
I I
I I
I i
1 lLonc-term Cc-tractors 1 4
1 6
i 0
l 1
1 0
5 1
2 11 I I
l l
l lXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXlXXXlXXXlXXXl' lShort-term contractorsIXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXXXXXXXlXXXlXXXlXXXlXXX1 A _
l l
1 1
I I
I I
I I
I I
I I
l Total I
4 6
1 0
l 1
1 O
I 5
1 2
1 1 I I
l 1 19l 1 = barbiturates 2-methaqualone 3 = nothadone 4 = benzadiazepines
l
\\
\\
~
Management Actions:
l During this report period we had a total of nineteen (19) positive Fitness-for-Duty-
)
(FFD) tests. Nineteen (19) of those were pre-access and part of the pre-screening l
process during Refuel Outage 5 (RFO-5).
Fitness-for-Duty Initiatives:
In our effort to support River Bend Station in a Customer Se'.vice environment, we elected to send all FFD specimens to our on-site laboratory at Grand Gr.lf Nuclear Station. This change allowed us to receive results from three (3) days down to less than twenty-four (24) hours.
Effectiveness Evaluation:
7 In an effort to streamline our process, we are currently working initiat ves to do i
i business the same way at each of our four sites. To make that task a reality, we are working to streamline our procedures and our process as a collective unit.
During the month of March we reduced our Random Testing from 100% to 50%. The big plus here is in monetary savings.
I Reference our 02/25/94 report, all items identified in the December FFD assessment have been corrected.
Reportable incidents:
None this period.
1
.