Issue date | Title | Topic | |
---|---|---|---|
ML20209G021 | 30 June 1999 | GE-NE-B13-02010-33NP, Evaluation of Limerick Unit 2 Shroud Cracking for at Least One Fuel Cycle of Operation | |
ML20207H833 | 31 May 1999 | Non-proprietary Rev 0 to 1H61R, LGS - Unit 2 Core Shroud Ultrasonic Exam | Nondestructive Examination |
B110078, Rev 1 to GE-NE-B1100786-01, Surveillance Specimen Program Evaluation for Limerick Generating Station,Unit 1 | 31 December 1998 | Rev 1 to GE-NE-B1100786-01, Surveillance Specimen Program Evaluation for Limerick Generating Station,Unit 1 | |
ML20236X764 | 31 July 1998 | Rev 0 to SIR-98-079, Response to NRC RAI Re RPV Structural Integrity at Lgs,Units 1 & 2 | |
ML20151Z488 | 30 June 1998 | GE-NE-B1100786-02, Surveillance Specimen Program Evaluation for Limerick Generating Station,Unit 2 | |
ML20202B623 | 23 January 1998 | Non-proprietary Version of Rev 1 to ER-9605NP, Missile Probability Analysis Methodology for Limerick Generating Station,Units 1 & 2,w/Siemens Retrofit Turbines | Nondestructive Examination Turbine Missile |
ML20198B335 | 30 June 1997 | Annual 10CFR50.59 & Commitment Rev Rept for 960701-970630, for Limerick Generating Station,Units 1 & 2 | Shutdown Margin Hydrostatic Coatings |
ML20135D772 | 30 April 1996 | Non-proprietary, Evaluation of Limerick Initial Core Channels for Re-Use on Ex-Shoreham Fuels Bundles | |
ML20101F190 | 29 February 1996 | Evaluation of Limerick Unit-1 Core Shroud Insps (Refuel Outage 6) | |
ML20099L633 | 30 June 1995 | Annual 10CFR50.59 & Commitment Rev Rept 940701 - 950630 | Safe Shutdown Grab sample Offsite Dose Calculation Manual Commercial Grade Dedication Temporary Modification |
ML20094H052 | 30 June 1995 | Pyrolysis Gas Chromatography Analysis of 21 Thermo-Lag Fire Barrier Samples | Fire Barrier |
ML20086B168 | 26 June 1995 | Ipeee | |
ML20083K661 | 26 April 1995 | Rev a to Upgraded Eals | Safe Shutdown High winds Offsite Dose Calculation Manual Internal Flooding Operating Basis Earthquake Battery sizing Earthquake Hardened vent Fuel cladding Pressure Boundary Leakage Power change |
ML20078S335 | 10 February 1994 | Evaluation of Abnormal Wear at Limerick | |
ML20059K626 | 26 October 1993 | SAR Licensing Rept for Spent Fuel Storage Capacity Expansion,Lgs Units 1 & 2 | Safe Shutdown Ultimate heat sink Grab sample Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Finite Element Analysis Design basis earthquake Earthquake Control of Heavy Loads Fuel cladding Liquid penetrant |
ML20046B501 | 27 June 1993 | Evaluation of Potential Internal Radiation Exposures Associated W/Contamination Events in Handling Traversing In-Core Probe (TIP) Tubing at Limerick Nuclear Generating Station & Recommendations for Evaluation & Control of ... | |
ML20127N881 | 31 December 1992 | LLRW Shipment Insp Repts 50-352/PA-92-02 & 50-353/PA-92-02 on 921116-18.No Violations or Deviations Noted.Major Areas Inspected:Licensee LLRW Shipment to Burial Site Including Shipping Documentation,Package Insp & Contamination Surveys | |
ML20113D980 | 30 November 1991 | Industry Approach to Seismic Severe Accident Policy Implementation, for Nov 1991 | Safe Shutdown Safe Shutdown Earthquake Probabilistic Risk Assessment Earthquake Backfit |
ML20082N047 | 28 August 1991 | Annual Plan Mod Rept,Jul 1990 Through June 1991 | Safe Shutdown High Radiation Area Grab sample Abnormal operational transient Excess Flow Check Valve |
ML20072R012 | 15 March 1991 | Common Plant Summary of ASME Section XI Repairs & Repalcements Completed from 890520-901217,Rept 3 | Hydrostatic |
ML20072R007 | 14 March 1991 | Common Plant Summary Rept for 890520-901217,Periodic Insp Rept 3 | |
ML20066K720 | 31 January 1991 | Simulator Certification Submittal, Providing Supporting Info to Form NRC-474 | Safe Shutdown Shutdown Margin Stroke time Squib Fuel cladding |
ML20055J329 | 20 July 1990 | Decommissioning Rept of Philadelphia Electric Co | |
ML20042E090 | 31 March 1990 | Description of Limerick Inadvertent Spray Actuation Analysis. | Hydrostatic |
ML20246A851 | 15 August 1989 | Common Plant Summary of ASME Section XI Repairs or Replacements from 870901-890519,Rept 2 | Hydrostatic Anchor Darling Squib |
ML20248A026 | 30 June 1989 | Rev 1 to Response to NRC Bulletin 88-05 for Limerick Generating Station,Unit 2 | |
ML20247J052 | 31 May 1989 | Vol Ii,Book 1 to Limerick Generating Station,Unit 2 Independent Design & Const Assessment, Hazards Program Evaluation Suppl | Safe Shutdown Probabilistic Risk Assessment |
ML20245A080 | 30 April 1989 | Vol II of Book 1 to Independent Design & Const Assessment, Design Assessment | Safe Shutdown Ultimate heat sink Fire Barrier Tornado Missile Commercial Grade Dedication Internal Flooding Hydrostatic Coatings Nondestructive Examination Finite Element Analysis Earthquake Fire Protection Program Loctite |
ML20245A095 | 30 April 1989 | Vol I of Book 1 to Independent Design & Const Assessment, Assessment Summary | Ultimate heat sink Internal Flooding Hydrostatic Coatings Nondestructive Examination FLEX Liquid penetrant Fire Protection Program |
ML20245A103 | 30 April 1989 | Vol II to Books 2,3 & 4 to Independent Design & Const Assessment,Design Observation Repts,DOR-001 to DOR-118 | |
ML20246P567 | 22 March 1989 | Safety Evaluation of Limerick 1,Cycle 3 Revised Core Loading Pattern | Shutdown Margin Anticipated operational occurrence Feedwater Controller Failure |
ML20235Z598 | 28 February 1989 | Extension of Equipment Qualification Programs to Limerick Generating Station Unit 2 | |
ML20235Y381 | 28 February 1989 | Rev 11 to Design Assessment Rept | Operating Basis Earthquake Earthquake |
ML20206K310 | 31 October 1988 | Rev 1 to Impact of Reg Guide 1.99,Rev 2 on Limerick Generating Station Unit 1 | |
ML20148R751 | 8 March 1988 | Readiness Program Assessment for Limerick 2 | Safe Shutdown Non-Destructive Examination Fire Barrier Hydrostatic Probabilistic Risk Assessment Coatings Scaffolding |
ML20236V663 | 31 August 1987 | Summary of ASME Section XI Repairs & Replacements Completed from 840928-870831,Rept 1 | |
ML20153G309 | 24 February 1986 | Summary of Validation Program for Spds | |
ML20129C386 | 30 June 1985 | Control Room Design Review Supplemental Rept 2 to Final Rept of June 1984 | Post Accident Monitoring Squib |
ML20112E449 | 11 February 1985 | BNL Technical Review Rept & Handwritten Notes of 850121-25 Insp | Probabilistic Risk Assessment |
ML20083L769 | 31 December 1984 | Descriptive Rept of Archeological Investigation for 220-60 Transmission Line Right-of-Way in Association W/Limerick Nuclear Generating Station,Montgomery & Chester Counties, Pa | |
ML20083L790 | 31 December 1984 | Descriptive Rept of Archeological Investigation for 220-61 Transmission Line Right-of-Way in Association W/Limerick Nuclear Generating Station,Montgomery & Chester Counties, Pa | |
ML20107G642 | 31 October 1984 | Control Room Design Review, Final Rept,Suppl 1 | |
ML20129D735 | 30 September 1984 | Evaluation of Feedwater Containment Isolation Check Valves for Hypothetical Pipe Rupture Condition for Limerick Generating Station | |
ML20098E906 | 30 September 1984 | Rev 10 to Design Assessment Rept | |
ML20093C992 | 17 September 1984 | Independent Design Review of Limerick Generating Station 1, Core Spray Sys, Bimonthly Status Rept 8 for Period Ending 840915.Related Correspondence | |
ML20096C765 | 31 August 1984 | Environ Qualification Rept | Safe Shutdown |
ML20095A602 | 9 August 1984 | Rev 0 to Raceway Separation Criteria. Raceway Separation Test Program Discussion Encl | |
ML20093N665 | 31 July 1984 | Nonproprietary Rev 9 to Vol 1 of Design Assessment Rept | Safe Shutdown Earthquake Operating Basis Earthquake |
ML20095D310 | 30 June 1984 | Rev 3 to Final Rept Overhead Handling Sys Review | Safe Shutdown Ultimate heat sink Non-Destructive Examination Safe Shutdown Earthquake Operating Basis Earthquake Nondestructive Examination Control of Heavy Loads |
ML20092K946 | 30 June 1984 | Control Room Design Review,Final Rept | Post Accident Monitoring Excess Flow Check Valve Siren |